Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
9.3.11            Infrastructure Activities Code

9.3.11.1          Application
This code applies to acceptable development which is subject to requirements and to assessable development identified as
requiring assessment against the infrastructure activities code by the tables of assessment in Part 5 (Tables of assessment).

9.3.11.2          Purpose and Overall Outcomes
(1)   The purpose of the Infrastructure Activities code is to ensure major utilities, telecommunications and other infrastructure
      activities:
      (a)   are provided in a coordinated and efficient way to meet the needs of existing and future communities; and
      (b)   are developed and designed in a manner which causes no adverse effects on public health, the environment and the
            amenity of the surrounding premises and local communities.
(2)   The overall outcomes sought for the Infrastructure activities code are:
      (a)   Residents and visitors have access to adequate levels of infrastructure to meet their immediate and future needs.
      (b)   Infrastructure activities are visually integrated with their natural, rural or urban setting and do not adversely affect the
            amenity of the major road network, surrounding sensitive land uses or the rural or residential amenity enjoyed by
            residents and visitors to Noosa.
      (c)   Infrastructure activities do not adversely impact upon community wellbeing and does not pose a threat to public
            health and safety.
      (d)   Where practicable, infrastructure activities are integrated and co­located with other compatible uses and facilities.
      (e)   The design of infrastructure activities incorporates convenient and safe access to the facility.
      (f)   Utility infrastructure and facilities maximise the efficient use of natural resources, including water and energy.
      (g)   Essential infrastructure, telecommunications and major utility infrastructure and facilities are resilient to future
            impacts of climate change and are designed to function during and immediately after flood events.
FOR ACCEPTED DEVELOPMENT
The requirements for Accepted development are the acceptable outcomes listed in the Table of Assessment. Accepted
development that complies with all the acceptable solutions is considered to satisfy the requirements. If development complies
with some, but not all, acceptable outcomes, an application for Code assessment will be necessary and the application will be
assessed against the relevant Performance outcome(s).

FOR ASSESSABLE DEVELOPMENT
Acceptable outcomes are provided for some, but not all, performance outcomes, and identify ways in which performance
outcomes can be met. Compliance with the performance outcome should be demonstrated and the acceptable outcomes are
considered as one way to satisfy the corresponding performance outcome.

Table 9.3.11.3 ­ Criteria for assessment

Location          Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes                                                Acceptable Outcomes

Location




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                              Page 1 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.