Skip to the record
Every meeting, every word.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                                Acceptable Outcomes
PO1                                                                 AO1.1
Infrastructure activities establish in a location:                  Infrastructure activities are established on a site that is well
(a)    relative to the infrastructure network it services;          located relative to any supply or distribution network.

(b)    where opportunities for cost efficiencies and reduction in
                                                                    AO1.2
       environmental and social impacts are maximised; and
                                                                    Where practicable, infrastructure activities are co­located with
(c)    with a high standard of accessibility for maintenance        another utility of a similar or compatible type.
       purposes and at times of emergency.
                                                                    AO1.3
                                                                    Infrastructure activities are located on a site that can be easily
                                                                    accessed for maintenance purposes or at times of emergency.


Effects of Use          Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes                                                Acceptable Outcomes

Effects of Use
PO2
Sufficient separation distance is provided between Infrastructure   No acceptable solution provided
activities and incompatible uses on the same site and
neighbouring premises to maintain amenity for neighbouring
uses.
PO3
Infrastructure activities have minimal effect on adjoining premises No acceptable solution provided
and on scenic amenity by way of noise, reflection, glare, or any
other emission.


Design requirements                Table 9.3.11.3 Criteria for assessment (part)
Performance outcomes                                                Acceptable Outcomes

Design requirements
PO4
The siting and design of buildings or structures associated with    No acceptable outcome provided
the infrastructure activity i s compatible with the setting and
character of the local area.
PO5
Infrastructure activities are sited and designed to:                No acceptable outcome provided
(a)    minimise adverse visual impacts beyond the boundaries of
       the site; and
(b)    minimise adverse impacts on the amenity of nearby
       residential, community or other sensitive land uses.

PO6                                                                 AO6.1
Mechanical plant and equipment (including air conditioning          Plant and equipment are:
equipment) are:                                                     (a)   setback at least 6 metres from any property boundary; and
(a)    positioned to minimise adverse impacts on the amenity of     (b)   screened by a 1.5 metre wide vegetated buffer of dense
       any adjoining sensitive land uses;                                 vegetation or fencing of 1.8 metre in height.
(b)    enclosed or designed and positioned to visually integrate
       with building and roof design; and                           OR
(c)    appropriately screened.
                                                                    AO6.2
                                                                    Plant and equipment are located within a building.



  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                                 Page 2 of 6
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.