Skip to the record
For the highest quality transcripts.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                          Acceptable outcomes

PO6                                                           AO6.1
Development ensures that building design and building form:   Buildings are designed to integrate well with the street level
﴾a﴿   accounts for potential flood risk;                      and the levels of adjoining properties to facilitate pedestrian
                                                              flows and visual and physical connectivity between the
﴾b﴿   is resilient to flood events; and
                                                              footpath and ground floors.
﴾c﴿   maintains a functional and attractive street address
      appropriate to the intended use.
                                                              AO6.2
                                                              Buildings incorporate appropriate screening to ensure that any
                                                              under­storey is not visible from the street, where such
                                                              screening does not impede flood water flows.

                                                              AO6.3
                                                              Residential buildings minimise risk from flooding by providing
                                                              parking and other low intensive, non­habitable uses at ground
                                                              level, rather than habitable uses.

                                                              AO6.4
                                                              Non­residential buildings and structures are oriented to the
                                                              street by activating the street frontage with appropriate uses
                                                              and urban design treatments such as recessed wall
                                                              treatments, screening or landscaping, whilst allowing for flow
                                                              through of flood waters on the ground floor.

                                                              Editor's Note— The use of flood resilient building materials is
                                                              also encouraged for building works up to the probable
                                                              maximum flood to reduce the consequences of flooding.

                                                              AO6.5
                                                              Basements and underground car parking areas are designed to
                                                              drain and function safely during a flood event and power failure.

                                                              Editor's note—Basements should have flood immunity above the
                                                              1%AEP defined flood event with alternative means to mechanical
                                                              pumping used to achieve such immunity.

Disaster management




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                     Page 23 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.