Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance Outcomes                                              Acceptable Outcomes
Growth management
Infrastructure and services
PO12                                                              AO12.1
New lots are located, sized and configured so as to ensure each   All lots are connected to power supply and telecommunications
lot is capable of being serviced by appropriate levels of         services and where located within the Urban boundaries, power
infrastructure including:                                         supply and communications infrastructure are provided
(a)   power supply;                                               underground.

(b)   telecommunications; and
                                                                  AO12.2
(c)   where within Local Plan Areas                               If located in a water service area each new lot can be connected to
(d)   reticulated water supply;                                   Unitywater’s water supply network.

(e)   reticulated sewerage; and
                                                                  AO12.3
(f)   stormwater drainage.                                        If located in a sewerage service area each new lot can be
                                                                  connected to Unitywater’s sewerage network.

                                                                  AO12.4
                                                                  If located in a Local plan area lots can be connected to Council’s
                                                                  stormwater drainage network.

                                                                  AO12.5
                                                                  If not in a sewerage service area each lot has sufficient area and
                                                                  other attributes to ensure efficient and effective on­site sewerage
                                                                  disposal.
PO13                                                              AO13.1
Each lot is provided with safe and convenient vehicle access      Vehicular access for the development is consistent with the
                                                                  function and design of the road it takes access from.

                                                                  AO13.2
                                                                  Development does not require new or changed access to a state­
                                                                  controlled road that is a limited access road unless in accordance
                                                                  with the limited access policy for the state­controlled road .

                                                                  AO13.3
                                                                  Access easements are in appropriate locations for safe access
                                                                  and egress, and supply appropriate widths and levels of service for
                                                                  the number of vehicles that will utilise them as per the
                                                                  requirements of Council’s Planning Scheme Policy PSP6
                                                                  Engineering design standards – Roads, drainage and earthworks.

                                                                  Editor's note­ Reference should be made to the Queensland
                                                                  Government's Development Assessment Mapping System to
                                                                  confirm which are state­controlled roads or limited access roads.


Movement Network               Table 9.5.1.3 Criteria for assessable development (part)
Performance Outcomes                                              Acceptable Outcomes
Growth management
Movement Network




  **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                           Page 7 of 15
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.