Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version

of 439

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (23.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Performance outcomes                                            Acceptable outcomes

PO7                                                             AO7.1
Development supports, and does not unduly burden, disaster      Development is located to support self­evacuation of people
management response or recovery capacity or capabilities.       and ensure sufficient warning time for the nature of the use.

                                                                AO7.2
                                                                Development does not:
                                                                ﴾a﴿   increase the number of people calculated to be at risk
                                                                      from flooding;
                                                                ﴾b﴿   increase the number of people likely to need evacuation;
                                                                ﴾c﴿   shorten flood warning times for other uses in the
                                                                      floodplain; or
                                                                ﴾d﴿   impact on the ability of traffic to use evacuation routes,
                                                                      or unreasonably increase traffic volumes on evacuation
                                                                      routes.

                                                                AO7.3
                                                                Materials stored on site:
                                                                ﴾a﴿   are readily able to be moved in a flood event to a flood
                                                                      free area; or
                                                                ﴾b﴿   are contained in order to minimise movement in times of
                                                                      flood.

                                                                Editor's Note— Businesses should ensure that necessary
                                                                emergency and continuity plans are in place to account for the
                                                                potential need to evacuate personnel and to relocate property
                                                                prior to a flood event.
Essential network infrastructure
PO8                                                             AO8
Essential network infrastructure maintains effective function   Essential network infrastructure that is likely to fail to function
during and immediately after flood and storm tide inundation    or may result in contamination when inundated by flood water
events.                                                         (e.g. water supply pipeline air valves and the like) is located
                                                                above the DFE level (or where the DFE has not been modelled
                                                                for the area, above the highest recorded flood level for the
                                                                area).
Essential community infrastructure




 **FINAL DRAFT ­ Post Consultation 2019**
                                                                                                                        Page 24 of 51
Log in to download the original file

2019-12-11 SM Agenda - Item 1 - Attachment 7 - Final New Noosa Plan - Part 8-10 Schedule Appendix - Clean version(PDF, 22MB).pdf · 23.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.