PO7 AO7.1
Development supports, and does not unduly burden, disaster Development is located to support selfevacuation of people
management response or recovery capacity or capabilities. and ensure sufficient warning time for the nature of the use.
AO7.2
Development does not:
﴾a﴿ increase the number of people calculated to be at risk
from flooding;
﴾b﴿ increase the number of people likely to need evacuation;
﴾c﴿ shorten flood warning times for other uses in the
floodplain; or
﴾d﴿ impact on the ability of traffic to use evacuation routes,
or unreasonably increase traffic volumes on evacuation
routes.
AO7.3
Materials stored on site:
﴾a﴿ are readily able to be moved in a flood event to a flood
free area; or
﴾b﴿ are contained in order to minimise movement in times of
flood.
Editor's Note— Businesses should ensure that necessary
emergency and continuity plans are in place to account for the
potential need to evacuate personnel and to relocate property
prior to a flood event.
Essential network infrastructure
PO8 AO8
Essential network infrastructure maintains effective function Essential network infrastructure that is likely to fail to function
during and immediately after flood and storm tide inundation or may result in contamination when inundated by flood water
events. (e.g. water supply pipeline air valves and the like) is located
above the DFE level (or where the DFE has not been modelled
for the area, above the highest recorded flood level for the
area).
Essential community infrastructure
**FINAL DRAFT Post Consultation 2019**
Page 24 of 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.