Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 4- Traffic Impact Assessment

of 172

Page text read automatically using OCR, there may be inaccuracies

                                                                               21 November 2023
                                                                      SLR Project No.: 620.V30926
Stockwell Development Group Pty Ltd                    SLR Ref No.: 620.V30926-R01 VMU TIA v1.0
Noosa Village Mixed Use Development                                                20231121.docx


Figure 2    Site Location – Local Context




2.2        Surrounding Road Network
Details of the key roads proximate to the proposed development shown in Figure 2 are
summarised in Table 1.

Table 1     Key Surrounding Roads
                                                                                       Posted
Road name Authority Classification                   Existing Form
                                                                                       speed
                                      Dual carriageway with 2 lanes in each direction
Eenie Creek                           plus bicycle lanes, urban cross-section (kerb
            Council       Arterial                                                    60km/h
Road                                  and channel) including pedestrian and cycle
                                      underpass
Hofmann                               2-4 lanes, divided, bicycle lanes, urban cross-
              Council     Collector                                                   50km/h
Drive                                 section
                                      Dual carriageway with 2 lanes in each direction
Walter Hay                            plus bicycle lanes, urban cross-section (kerb
           Council        Arterial                                                    60km/h
Drive                                 and channel) including pedestrian and cycle
                                      underpass
                                      2-4 lanes, divided, bicycle lanes, urban cross-
Rene Street Council       Collector                                                   50km/h
                                      section


2.3        Road Network Planning
In order to ensure that the proposed development does not compromise the delivery of any
planned infrastructure works, Council’s Local Government Infrastructure Plan (LGIP) has
been reviewed to identify any projects within the vicinity of the site.



                                             3

Log in to download the original (Attachment 4- Traffic Impact Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.