Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 186, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                                                             Page 2
West Ridge Quarry
Site Based Management Plan


1.3          Project Overview
The development seeks to realise the full potential of the existing known extractive resource on-site in order to assist with
rehabilitation works associated with Mining Lease (ML) numbers 3672, 3673, 3705, 3718, 3729 and 50078 located at the
CSR Neales and White Pit Quarries on Lake MacDonald Drive, Cooroy.

The proposed hours of operation are 6am to 6pm Monday-to-Friday and 7am to 3pm on Saturdays. No operations are
proposed to occur on Sundays, Anzac Day, Christmas Day or Good Friday.

The operation will use standard quarrying methodologies that may involve clearing, topsoil and overburden stripping,
mechanical excavation, processing and stockpiling with the final products utilised for rehabilitation works off-site at nearby
CSR mining leases (refer Diagram 1 – Conceptual On-site Extractive Operations).




                                                                               Excavated material
                                                                                   stockpile


                                                                                                                Load excavated material

                                                                                                                              Material screened
                                                            Excavator                               Front end                with vibrating screen
                                                                                                     loader




                                Excavation Pit
                                                                                                                      Mobile screening
                                                                                                                            plant



                                                                        Material loaded into
                                         Deliver off site                      trucks



                                                                                                                Screened material stockpiled



                    Possible Emissions


                       Particulate emissions


                       Contaminated water
                                                                                                                Stockpiles


                       Noise emissions




Diagram 1 – Conceptual On-site Extraction Operations

Extractive operations will comprise the following elements:
      Clearing of vegetation and stripping of topsoil and overburden material using mechanical means (i.e. bulldozer or
      excavator) and stockpiling for incorporation into rehabilitation works where required, or use in constructing stormwater
      control structures (e.g. perimeter banks).
      Stripping of clay material progressively using mechanical equipment (i.e. hydraulic excavator, loader or bulldozer with
      ripper attachment, or similar earthmoving equipment) and stockpiling on-site for the rehabilitation works (at Neales
      Quarry and White Pit Quarry), where required.
      Screening the raw material using a mobile screening processing plant.
      Stockpiling the final products within the bounds of the extraction footprint or designated hardstand area adjacent to
      the processing plant until required to be loaded into haulage vehicles for transportation off-site for the rehabilitation
      works (at Neales Quarry and White Pit Quarry).

On-site extractive industry operations will be supported by a range of ancillary buildings and structures which include, but
are not necessarily limited to:
      Demountable Site office and amenities block
      Car park (for employees and contractors)


December 2012 / file ref. 1271_610_001                                                                                                        GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.