Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (36.8 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 234, section 1. The text section number identifies this passage in the reader.

CSR Building Products Limited                                                                                               Page 50
West Ridge Quarry
Site Based Management Plan



                                         Assess the situation and consider the need for any personnel to remain at the Site for
                                         the duration of the emergency. If this is judged to be essential, a minimum of two
                                         responsible persons shall remain. Adequate provisions and an emergency
                                         communications system shall be provided.

 Cyclone Passed:                         At the cessation of the emergency, the Site Manager shall carry out a physical
                                         inspection of the buildings to ascertain the extent of any danger and to initiate actions
                                         necessary to make safe any dangerous conditions and/or return to normal activities.
                                         The Site Manager shall complete a damage assessment and report and notify
                                         Management.

Flood:                                   The Site Manager to monitor Bureau of Meteorology to identify possibility of
                                         prolonged or heavy rainfall events and check for flood warnings.
                                         The Site Manager to cease operations in the event of a prolonged or heavy rainfall
                                         event/flood warning and evacuate the Site, when deemed necessary.
                                         The Site Manager to re-open the Site once water recedes and/or access is regained.
                                         Clean-up of any debris and repair to creek crossings, access roads if necessary etc.
                                         Operations to recommence.

Clean-up:                                Clean-up and salvage operations shall not be attempted until it is declared safe to do
                                         so. The advice of suppliers will be sought regarding handling of any fire damaged
                                         products. MSDS of all products used on-site will be kept on-site.

3.10.5 Monitoring
      Employee involved with the incident will complete an incident report with the Site Manager and issue to management
      and the Administering Authority if applicable.
      The Site Manager will investigate the cause of the emergency/incident and:
      - identify any problems in the emergency response plan or actions;
      - identify any environmental damage and, where necessary, ensure relevant environmental monitoring and
          remediation is undertaken as soon as practicable; and
      - determine any action(s) to prevent emergency/incident recurrence.

3.10.6 Auditing and Review
      Incident forms shall be checked by Management within two weeks following incident to ensure follow-up action
      (including report) is occurring.
      Site Manager shall review the emergency/incident management strategy as required or at least once every three
      years.

3.10.7 Reporting and Responsibility
      Report to relevant authorities:
      - EHP (if there is risk of environmental harm);
      - Fire and Rescue Service (if there is danger of fire to persons and/or property);
      - Police (if there is danger to persons and property); and
      - Ambulance (if there are persons injured).
      Prepare initial incident report and a written list of facts concerning the incident.
      An Emergency/Incident Register shall be maintained on-site to record any emergency/incidents or events likely to
      have adversely affected the environmental performance of the Site. The Emergency/Incident Register will include, but
      not be limited to, the following details:



December 2012 / file ref. 1271_610_001                                                                           GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗