Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 273, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                               Probable Solutions                                      Compliance   Comments
                                                                                                                                           / /NA
                                                                                                                                                     of the West Ridge Mining Lease footprint and the formation of
                                                                                                                                                     gently sloping ground levels reflective of surrounding areas.

                                                                                S15.3                                                      NA        The proposed development does not involve permanent buildings
                                                                                The distance between the ground and the lowest                       as part of the extractive industry operations.
                                                                                part of the floor of the building does not exceed 3m.

Roof form
O16                                                                             S16.1                                                      NA        The proposed development does not involve permanent buildings
Roof forms –                                                                    With the exception of industrial buildings the main                  as part of the extractive industry operations.
a) contribute positively to the local skyline;                                  roof of the building has a roof pitch no less than 12
b) complement the low rise character of the locality;                           degrees and has minimum 600mm eaves to at least
c) use simple traditional roof designs, such as hipped, gabled or skillion;     75% of the perimeter of the building;
     and
d) do not create opportunities for residents to overlook the private open       AND
     space areas of neighbouring properties.

                                                                                S16.2                                                      NA        The proposed development does not involve permanent buildings
                                                                                Building and structures do not include rooftop                       and permanent structures as part of the extractive industry
                                                                                terraces.                                                            operations.

Public transport node
O17                                                                             S17.1                                                      NA
An accessible and safe public transport node is established and operated        A public transport node is located within Cooroy as
within Cooroy that –                                                            identified in Schedule 5 on Map 1.
a) links public transport services to other centres and destinations
      throughout the Sunshine Coast; and
b) forms part of an integrated transport network that is accessible via
      pedestrian and bicycle pathways.

6.11 Environment, conservation and recreation
Environment and cultural heritage values
O18                                                                                                                                                  An Ecological Assessment Report (ATTACHMENT 6) has been
There are no significant adverse effects on biodiversity, natural vegetation,   No solution provided.                                                prepared for the Site, which provides an analysis of the ecological
native fauna habitat, landscape quality, water quality or cultural heritage                                                                          values of the area and an assessment of the potential impacts
values, including those related to –                                                                                                                 that the proposed disturbance areas may impose on the
a) changes to natural drainage;                                                                                                                      ecological values of the Site (as a result of the extractive
b) disturbance to any of the wetland systems;                                                                                                        industry). It is anticipated that the proposed development will not
c) management of landslide and fire risk;                                                                                                            impact on the natural Site characteristics such as biodiversity,
d) erosion and the transport of sediments off site;                                                                                                  natural vegetation, native fauna habitat, and wetlands.
e) unmanaged public access;
f) effluent disposal;                                                                                                                                It is not anticipated that the proposed development will impact on


  December 2012 file ref.1271_DA1_310_002                                                                                        7                                                                Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.