Original source · versioned page text
Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 274, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
g) changes to fauna habitat and behaviour; and any indigenous and non-indigenous history, culture and traditions
h) disturbance of buildings and features, including natural features, of within the area. A search of the Queensland Heritage Register,
cultural heritage significance. National Heritage Register, Aboriginal and Torres Strait Islander
Cultural Heritage database, and Council’s Planning Scheme
“Heritage Overlay Map” shows there are no significant cultural
heritage values identified on or adjacent to the Site.
However, should cultural heritage values be found on-site, all
reasonable and practical measures will be conducted to ensure
the activity does not harm indigenous and non-indigenous cultural
heritage values. Objects that may be of cultural heritage
significance that are identified during extractive industry
operations will be reported to the Site Manager. The Site
Manager will cause the appropriate liaison with the relevant
Aboriginal Party and / or government representatives to ensure
that such objects are appropriately handled and proper reporting
is undertaken in accordance with the Aboriginal Cultural Heritage
Duty of Care Guidelines.
The proposed works (i.e. extraction works with no permanent
infrastructure) do not require fire management measures to be
implemented. The development will not involve the manufacture
or storage of hazardous materials in bulk. In addition, the
development does not involve institutional uses whereby the
evacuation of people from the Site will be difficult and will not
generate a significant increase in the number of people who live
or work in the area.
The proposed disturbance areas avoid mapped areas recognised
by the Noosa Shire Planning Scheme as being in a landslide
hazard area. The proposed disturbance areas avoid mapped
areas recognised as watercourses/drainage lines.
Managing water quality is the principal environmental issue for
CSR’s mining areas and is recognised as such in the Plan of
Operations. The proposed disturbance areas are located
approximately 1 km to the west of Lake Macdonald.
Appropriate measures will be incorporated into the development
to ensure impacts of flooding and water quality are appropriately
managed through the control of erosion, sediment transportation,
sediment capture and pH.
December 2012 file ref.1271_DA1_310_002 8 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.