Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216
Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 275, section 1. The text section number identifies this passage in the reader.
Specific Outcomes Probable Solutions Compliance Comments
/ /NA
In relation to Six Mile Creek, the creek will be protected by the
following measures:
at least 100 m of separation from the area of disturbance to
the mapped watercourse and associated mapped remnant
vegetation;
a 20 m setback from the eastern most boundary of the
mining lease; and
CSR’s requirement to comply with their Environmental
Approval (EA) conditions for their activities, specifically:
- diversion bunds above the extractive areas to divert
clean stormwater runoff around the disturbed area;
and
- establishing a system of stormwater controls for
stormwater runoff prior to release as currently required
under the EA, and likely to be imposed by the DEHP
through the conditions of ERA 16.
Appropriate measures will be implanted as part of the
development to ensure effluent disposal is appropriately
managed.
Landscape quality and scenic amenity will be maintained as a
result of the operations on-site. The proposed works on-site is
approximately 800 m from Lake Macdonald Drive, and the view
from this road is obscured by the riparian vegetation associated
with Six Mile Creek which will remain unaffected.
The Site Based Management Plan (ATTACHMENT 8) provides
the framework for environmental management on the Site and is
a practical guide at the operational level to contain environmental
impacts. The SBMP has been prepared to assist in the
management and protection of surrounding environment values
and describes how the operator proposes to manage potential
environmental impacts which may be caused by carrying out
extractive and processing activities.
Open space network
O19 S19.1 and S20.1 The Site is not identified as being located within an Open Space
An integrated open space network is established, enhanced and protected Open space corridors and existing native vegetation Corridor as shown on Council’s Planning Scheme Map 4 – Open
throughout the locality to – in areas indicated in Schedule 5 – Map 4 are Space Networks in Schedule 5.
a) provide for both passive and active recreational pursuits; protected from fragmentation and encroachment by
December 2012 file ref.1271_DA1_310_002 9 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.