Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 315, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                 Probable Solutions                                  Compliance   Comments
                                                                                                                                         / /NA
                                                                                                                                                   and is a practical guide at the operational level to contain impacts.
                                                                                                                                                   The SBMP has been prepared to assist in the management and
                                                                                                                                                   protection of surrounding environmental values and describes
                                                                                                                                                   how the operator proposes to manage potential environmental
                                                                                                                                                   impacts which may be caused by carrying out extractive industry
                                                                                                                                                   activities (refer ATTACHMENT 8 – SITE BASED
                                                                                                                                                   MANAGEMENT PLAN).

Separation of incompatible uses
O4                                                                                S4.1                                                             It is considered that the proposed use on the Site provides
Adequate separation is provided between existing or potential Agricultural Uses   A distance of not less than 500m separates the                   appropriate separation between existing or potential Agricultural
on land within an Agricultural Land Conservation Area and incompatible land       use and any area identified as Agricultural Land                 Uses within the surrounding area of the Site.
uses.                                                                             Conservation Area on Overlay Maps OM1.5
                                                                                  OM9.5;                                                           All extraction activities included as part of the proposed
                                                                                                                                                   development will be undertaken in a manner consistent with the
                                                                                  OR                                                               existing mining lease approvals over the land.

                                                                                                                                                   The approval sought is for a limited purpose (to enable
                                                                                                                                                   rehabilitation of the mining leases to the south of the Site at
                                                                                                                                                   Neales Quarry and White Pit Quarry). It is anticipated that the
                                                                                                                                                   volume of material required can be obtained and hauled within a
                                                                                                                                                   period of 2 years from commencement of the operations.

                                                                                                                                                   The proposed development will be guided by a Site Based
                                                                                                                                                   Management Plan (SBMP) prepared for the Site. The SBMP
                                                                                                                                                   provides a framework for environmental management on the Site
                                                                                                                                                   and is a practical guide at the operational level to contain impacts.
                                                                                                                                                   The SBMP has been prepared to assist in the management and
                                                                                                                                                   protection of surrounding environmental values and describes
                                                                                                                                                   how the operator proposes to manage potential environmental
                                                                                                                                                   impacts which may be caused by carrying out extractive industry
                                                                                                                                                   activities (refer ATTACHMENT 8 – SITE BASED
                                                                                                                                                   MANAGEMENT PLAN).

                                                                                  S4.2                                                   NA        Refer to response to O4 above.
                                                                                  Buffer areas and buffer elements not less than
                                                                                  those calculated in accordance with Section 3 of
                                                                                  the Planning Guidelines: Separating Agricultural
                                                                                  and Residential Land Uses are provided and
                                                                                  maintained to separate the use and any area
                                                                                  identified as Agricultural Land Conservation Area
                                                                                  on Overlay Maps OM1.5-OM9.5.



  December 2012 file ref.1271_DA1_310_002                                                                                    49                                                                  Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.