Specific Outcomes Probable Solutions Compliance Comments
/ /NA
Fragmentation of agricultural land
O5 S5.1 NA The proposed development does not involve a subdivision of
Development does not result in the fragmentation of agricultural lands. Land located within the Agricultural Land land.
Conservation Areas identified on Overlay Maps
OM1.5—9.5 is not further subdivided into smaller
lots.
Table 13.14 Extractive resource areas
13.45 Effects of use
Key or Local Resource/processing area
O6 S6.1 The Site is identified as being located within a “Local
Development or use of premises within the resource/processing area is Development within the resource/processing Resource/Processing Separation Area” on Council’s Planning
compatible with the— area is for Extractive uses or directly associated Scheme Overlay Map OM3.5 – Natural Resources Overlay Map.
a) winning of the extractive resource; with Extractive uses;
b) ongoing operation or expansion of existing or potential Extractive uses; OR The proposed development is for extractive industry uses and is
and therefore consistent with the specific outcome.
c) safe and efficient transport of materials to and from Extractive use sites.
S6.2 NA
Development is for other uses that would not
constrain existing or future Extractive uses.
Resource/processing separation area
O7 S7.1 The Site is identified as being located within a “Resource
Development within the resource/processing separation area— No additional lots are created within either Key Separation Area” on Council’s Planning Scheme Overlay Map
a) does not increase the number of people living in the separation area; and Resource Areas or Local Resource Areas shown OM3.5 – Natural Resources Overlay Map.
b) incorporates measures which avoid or mitigate adverse impacts from the on Overlay Maps OM1.5 — OM9.5.
winning and transportation of the extractive resource; and The proposed development is for extractive uses and is therefore
c) does not compromise the function of the separation area in providing a consistent with the outcome.
buffer between Extractive uses and other uses.
Haulage routes separation area
O8 NA The proposed development is for extractive uses.
Development other than an Extractive use within the haulage routes separation No solution provided.
area is compatible with the safe and efficient operation of the haulage route
associated with the Extractive use.
Design and operation
O9 The design of the proposed extractive industry operations will
The design and operation of extractive resource uses minimises and mitigates No solution provided. incorporate necessary control measures to mitigate impacts on
the potential for adverse impacts on environmentally sensitive areas and amenity the amenity of surrounding areas.
of existing uses.
December 2012 file ref.1271_DA1_310_002 50 Groundwork Plus
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.