Skip to the record
Every meeting, every word.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 317, section 1. The text section number identifies this passage in the reader.

Specific Outcomes                                                                     Probable Solutions           Compliance   Comments
                                                                                                                      / /NA
                                                                                                                                The Site is appropriately screened from Lake Macdonald Drive.
                                                                                                                                The proposed works on-site are approximately 800 m from this
                                                                                                                                road and the view of the proposed extraction areas on Site from
                                                                                                                                this road is obscured by the riparian vegetation associated with
                                                                                                                                Six Mile Creek which will remain unaffected.

                                                                                                                                All extraction activities included as part of the proposed
                                                                                                                                development will be undertaken in a manner consistent with the
                                                                                                                                existing mining lease approvals over the land.

                                                                                                                                An Ecological Assessment Report (ATTACHMENT 6) has been
                                                                                                                                prepared for the Site, which provides an analysis of the ecological
                                                                                                                                values of the area and an assessment of the proposed
                                                                                                                                disturbance areas on the ecological values of the Site (as a result
                                                                                                                                of the extractive industry). It is anticipated that the proposed
                                                                                                                                development will not impact on the natural Site characteristics
                                                                                                                                such as native vegetation and natural landforms.

                                                                                                                                The Site Based Management Plan prepared for the Site
                                                                                                                                (ATTACHMENT 8) provides a framework for environmental
                                                                                                                                management and is a practical guide at the operational level to
                                                                                                                                contain environmental impacts.

Extractive Resources
O10                                                                                                                             The Site is identified as comprising “Extractive Resources” as
Industrial business Type 3 Extractive are designed, located and operated to           No solution provided.                     shown on Council’s Planning Scheme Strategy Map.
ensure—
a) haulage routes associated with extractive resources—                                                                         A Traffic Impact Assessment Report prepared by TTM Group has
     i.    are located on roads where the haulage route will minimise adverse                                                   been included as part of the assessment of the development
           impacts on residential and urban residential amenity;                                                                which investigates the proposed haulage route between the
     ii. are located on roads which are of adequate construction, or may be                                                     subject Site and the two mining leases to the south (Neales Pit
           upgraded, to a standard commensurate with the volume, type and                                                       and White Pit Quarry) to be rehabilitated (refer ATTACHMENT 7
           nature of the vehicular traffic utilising the haulage route; and                                                     – TRAFFIC IMPACT ASSESSMENT).
     iii. are adequately maintained as a part of the utilisation of the extractive
           resource;                                                                                                            The Traffic Impact Assessment Report demonstrates that it is not
b) the utilisation of any extractive resource does not result in adverse visual                                                 expected that the level of truck activity will impact on any capacity
     impacts from major roads; and                                                                                              on the road network during the haulage of activities.
c) the rehabilitation of extractive industry sites, prior to or in conjunction with
     land use changes on the site of the resources or within buffers to the                                                     It is noted that a residential dwelling shares the Lake Macdonald
     resource.                                                                                                                  Drive access to the Site. It is anticipated that the residential
                                                                                                                                driveway will not significantly adversely impact or be impacted
                                                                                                                                upon by the proposed development. Residential uses are also



  December 2012 file ref.1271_DA1_310_002                                                                     51                                                              Groundwork Plus
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.