Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 331, section 1. The text section number identifies this passage in the reader.

Planning Assessment Report                                                                                             Page 8
300 Kennedys Road, Lake Macdonald QLD 4563 – Extractive Industry




2.3.2        Equipment and Facilities
The equipment and facilities associated with the proposal could comprise the following:

      mobile equipment for extraction including:
      - excavator or bulldozer with ripper (for raw product extraction, stripping topsoil and overburden material, land
           forming and rehabilitation);
      - front end loader (stripping and product haulage for transporting extracted material from stockpiling areas, out-
           loading and feeding crusher and screening plant); and
      - screening plant (processing material);
      processing/stockpiling area;
      delivery trucks (for transporting extracted material off-site);
      amenities (i.e. office and portable toilet);
      car parking (for employees and contractors);
      security fencing (wire perimeter fence and lockable gate);
      sump; and
      bunding around extraction areas.

A transportable office will be provided at the Site on Lot 3 on SP108094. FIGURES 8 – 10 provide the typical floor plans
and elevations as options for the temporary office proposed on-site.

2.3.3        Site Access and Transportation
Access to Lot 3 on SP108094 and all materials are transported by road via the existing driveway off Lake Macdonald Drive
from the existing brickworks factory land, owned by CSR, on Lot 2 on SP108094. Lot 2 on SP108094 has been included
as part of this application, solely for the purposes of gaining access to Lot 3 on SP108094 and transporting the extracted
material off the Site. No extractive industry operations are proposed on Lot 2 on SP108094.

The access road is existing and will not involve upgrades or changes as a result of the proposed development. It is
understood that the crossing is in the form of a constructed crossing approved and established some time ago to facilitate
the mining activities (ML No. 3742) on Lot 3 on SP108094.

The access road will not be sealed and will be watered where necessary to prevent potential dust emission.

The proposed haulage route and transportation of materials between the Site and two mining leases to be rehabilitated to the
south (i.e. Neales Quarry and White Pit Quarry) include the following:

      brickworks factory access from Lake Macdonald Drive;
      1.4 km section of Lake Macdonald Drive; and
      White Pit Quarry access from Lake Macdonald Drive.

The intention of the haul route is to transport extracted material from the West Ridge Mining Lease (ML No. 3742) for the
rehabilitation (filling) of Neales Quarry and White Pit Quarry to the south of the subject Site.

It is noted that access from Neales Quarry will be via the White Pit Quarry access.

A Traffic Impact Assessment Report prepared by TTM Group has been included as part of the application, which investigates
the proposed haulage route between the Site and the two mining leases to be rehabilitated (refer ATTACHMENT 7 –
TRAFFIC IMPACT ASSESSMENT REPORT).

2.3.4        Rehabilitation
Rehabilitation is an essential component of extractive industry planning and development. Rehabilitation needs to be
incorporated in the day-to-day operations of the quarry to assist in minimising adverse impacts on the environment.

The extraction of material will be carried out in a sequential and logical manner to contain environmental impact and
promote progressive rehabilitation, where practicable.


December 2012 / file ref. 1271_DA1_310_001                                                                 GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.