Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 332, section 1. The text section number identifies this passage in the reader.

Planning Assessment Report                                                                                                Page 9
300 Kennedys Road, Lake Macdonald QLD 4563 – Extractive Industry




Rehabilitation, when carried out, will be of a form and extent reflecting appropriate post mining/extraction landform/land
use requirements.

Rehabilitation activities will be planned, programmed and implemented in conjunction with mine extraction activities
whenever practicable. Particular attention will be paid to salvaging and subsequently managing topsoil resources on
extractive areas.

Rehabilitation works will be planned, designed and executed with appropriate controls to prevent nuisance and to
safeguard the environment.

A Landcare and Rehabilitation Plan has been incorporated in ATTACHMENT 8 – SITE BASED MANAGEMENT PLAN to
ensure the proposed post-extraction land use is returned to a stable, non-polluting and self-sustaining state suitable for
rural use.

Rehabilitation works will be required prior to the surrender of the mining lease over the Site. The extent and nature of the
rehabilitation works will be determined at that time with consideration to the likely post mining land uses for the land.
Minimum works would include establishment of stable land with grass cover for grazing purposes.

As a minimum, the Site would be rehabilitated in the following manner to ensure the establishment of stable land with
grass cover for grazing purposes, including:

      minor trim earthworks to void the pit perimeter and floor;
      spreading of soil from perimeter stockpiles; and
      ripping, seeding and fertilising with grass seed.

Rehabilitation activities form part of the standard operations under the current mining lease (ML No. 3742) for the Site.
Rehabilitation strategies and plans are documented and translated into operational procedures and/or work
instructions for effective implementation. Pursuant to the Plan of Operations (ATTACHMENT 1), monitoring and records
of rehabilitation outcomes are maintained.

2.3.5        Workforce
The permanent full-time Site workforce will be approximately three (3) persons. All staff working on-site will be trained in
accordance with the Site Based Management Plan prepared for the Site (refer ATTACHMENT 8 – SITE BASED
MANAGEMENT PLAN).

2.3.6        Hours of Operation
The proposed hours of operation are 6:00am to 6:00pm Monday to Friday and 7:00am to 3:00pm Saturday. No operations
will be conducted on Sundays, Anzac Day, Christmas Day, Easter Monday or Good Friday. It is anticipated that
surrounding land uses will not be impacted upon during these hours by the proposed development (refer FIGURE 2 – SITE
AND SURROUNDS).

Operations will be carried out in accordance with the Site Based Management Plan (refer ATTACHMENT 8 – SITE
BASED MANAGEMENT PLAN) prepared for the Site and conditions of development approval for the conduct of
Environmentally Relevant Activities.

2.3.7        Public Utilities and Services
The proposed development will utilise the existing local services (i.e. electricity, telecommunications, water, sewerage)
provided on the Site. It is anticipated that the development will not require any further public utilities and services for the
operations of the development. Existing infrastructure on-site will be used where necessary.




December 2012 / file ref. 1271_DA1_310_001                                                                    GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.