Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Development Application part 2 OF 2 All of CD, Information in notes - MCU12/0216

of 389

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (36.8 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 335, section 1. The text section number identifies this passage in the reader.

Planning Assessment Report                                                                                                     Page 12
300 Kennedys Road, Lake Macdonald QLD 4563 – Extractive Industry




3.3.2        Integrated Development Assessment System (IDAS)
The SPA established a system for assessing development applications in Queensland known as the Integrated
Development Assessment System (“IDAS”). IDAS is the system for integrating State and Local government assessment
and approval processes for development.

IDAS is a modular system involving up to five (5) stages namely:


       Application                   Information and                Notification     Decision Stage          Compliance
         Stage                        Referral Stage                  Stage                                    Stage




The key roles in the IDAS process are as follows:

Applicant:                                     CSR Building Products Ltd.

Assessment Manager:                            Sunshine Coast Regional Council.

Referral Agency:                               If there is a requirement under the Sustainable Planning Regulation 2009 (“SPR”) for
                                               an entity other than the assessment manager to have input in the assessment of a
                                               development application, the application is referred to that agency.

                                               Referral Agencies likely to be triggered by the proposal are detailed in TABLE 1 –
                                               REFERRAL AGENCIES below.

TABLE 1 – REFERRAL AGENCIES

  Application Involving                                        Referral Agency        Referral Status       Referral Triggers
                                                                                                            Schedule 7 SPR
  Table 2 – Other development made assessable under schedule 3 (whether or not the development is also assessable under a
  planning scheme, temporary local planning instrument or preliminary approval to which section 242 of the Act applies)
  Environmentally Relevant Activities
  A material change of use for an environmentally    Department of Environment       Concurrence Agency     Table 2, Item 1
  relevant activity made assessable under            and Heritage Protection
  schedule 3, part 1, table 2, item 1 or schedule 3, (“DEHP”)
  part 1, table 5, item 5.
  Table 3 – Development made assessable under a planning scheme, temporary local planning instrument, preliminary approval to
  which section 242 of the Act applies or State planning regulatory provisions
  Development impacting on a State-controlled road
  Development that:                                  Department of Transport and     Concurrence Agency     Table 3, Item 2
  (a) is for an aspect of development identified in Main Roads (“DTMR”)
        schedule 11; and
  (b) is for a purpose or purposes mentioned in
        schedule 11, column 1; and
  (c) exceeds the threshold, or combined
        threshold, in schedule 11, column 2 or 3 for
        the purpose or purposes.
  Electricity Infrastructure
  A material change of use not associated with       South East Queensland           Advice Agency          Table 3, Item 7
  reconfiguring a lot if:                            Electricity Corporation Limited
  (a) any part of the premises is subject to an
        easement in favour of a distribution entity
        or transmission entity under the Electricity
        Act 1994 and the easement is for a
        transmission grid or supply network under
        that Act; and
  (b) any structure or work that is the natural and
        ordinary consequence of the use is, or will
        be, located completely or partly in the
        easement.


December 2012 / file ref. 1271_DA1_310_001                                                                          GROUNDWORK p l u s
Log in to download the original file

Development Application part 2 OF 2 All of CD, Information in notes - MCU12_0216.pdf · 36.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.