Council archive · source document
Information Response MCU12/0208
Acid Sulphate Soils
Issues
An ASS assessment has been provided and evaluated (Cardno Bowler Pty Ltd, Geotechnical
th
Investigation: 6. ASS Assessment, 25 June 2012). Whilst the number of boreholes on site do not meet the
QASSIT Guidelines particularly on lot 53 where only 2 boreholes were dug (ie 2holes/ha if the site is >4ha (Site
area = 93.1 ha)), the results from testing 16 samples show that there is a presence of ASS material in soils to a
depth commensurate with the envisaged works at this stage (0.0 – 1.5metres).
The consultant has also acknowledged that further sampling and testing needs to be carried out when the
nature and area of disturbance is determined. From this an ASS Management Plan will be formulated.
It is considered, that due to the sensitivity of the surrounding environment (eg Lake Weyba), a full ASS
assessment carried out in accordance with the latest guidelines needs to be provided prior to any approval.
Information Required
91 A full ASS assessment needs to be provided prior to any approval demonstrating that there will
not be any impacts to any nearby sensitive ecosystems. The assessment needs to be carried
out in accordance with the following guidelines:
(i) The State Planning Policy Guideline 2/02: Planning and Managing Development involving Acid
Sulphate Soils published by the Qld Department of Natural Resources and Water;
(ii) QASSIT: Guidelines for Sampling & Analysis of Lowland Acid Sulphate Soils (ASS) in Queensland 1998,
published by the Department of Natural Resources and Water; and
(iii) The Queensland Acid Sulphate Soil Technical Manual: Soil Management Guidelines Version 3.8,
published by the Department of Natural Resources and Water.
The ASS assessment as a minimum needs to include a plan showing location of boreholes, works
details (eg depths of excavation and quantities of fill), bore logs, sampling regime/results of testing
for the presence or absence of ASS including justification for any reduced sampling regime, a
groundwater analysis and detailed interpretation if necessary. It needs to also include the necessary
measures for managing ASS (if found) and groundwater on site. If excavated material requires
treatment, full details of where it is to be treated is required as well as proposed haulage routes.
Response:
Following discussions with Council, it was agreed to provide a preliminary Acid Sulphate Soil (ASS) Assessment to
ensure the strategy for dealing with ASS with consideration to groundwater on the site. Please refer to section
2.6 and preliminary ASSMP in Appendix F of the amended Engineering Report (see Attachment 8).
A final ASSMP can only be completed upon knowing the lot layout and hence earthworks which can only be
completed in future applications.
In this instance it is anticipated Council would impose an appropriately worded condition regarding the
requirement for a detailed ASSMP as part of any approval package.
Issues
A preliminary Erosion and Sediment Control Plan is required demonstrating that no impacts will occur from
works during the bulk earthworks and construction phases. This is due to the proximity of Lake Weyba,
topography, soil type, and scale of works.
Information Required
92 A conceptual ESC Plan needs to be submitted prior to any approval and needs to address the
61
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records