Council archive · source document
Development Application Part 2 of 2 Report/ Plans - MCU12/0047
Plans and drawings: the text below has words only, no drawings.
Very large file (43.4 MB): may take a few minutes to open.
Original PDF page 30, section 1. The text section number identifies this passage in the reader.
Comment: The proposal complies with all applicable probable solutions and specific outcomes of the
Business Uses Code.
RESIDENTIAL USES CODE
Table 14-24 -
For All Residential Uses
Specific Outcomes Probable solutions Proposal
14.46 Effects of use
Electricity supply infrastructure 51.1 No solution provided. Complies
01 The development does not adversely The proposed development will be
impact on existing or future electricity adequately serviced by existing
supply infrastructure; electricity supply infrastructure.
AND
02 All uses and works maintain an 52.1 Development for uses adjacent to Complies
adequate safe distance from electrical or within 50m of an existing electricity The site is not within 50m of an
infrastructure including substations, substation incorporates noise electricity substation.
overhead powerlines, power poles and attenuation measures to mitigate noise
transformers. impacts;
AND
52.2 Buildings and structures (including Complies
swimming pools, sheds, tennis courts or No buildings or structures will be
outbuildings) are not constructed under constructed under overhead electricity
overhead electricity transmission lines, lines or easements.
or within electricity easements;
AND
52.3 A minimum separation distance is Complies
maintained fromthe electricity Minimum separation distances are
transmission line to the closest boundary achieved.
of habitable buildings and child activity
areas, as follows-
a) 20m for transmission lines up to
132kV;
b) 30m for transmission lines between
133kV and 275kV; and
c) 40m for transmission lines greater
than 275kV.
Hot Water 5ystems 53.1 All hot water systems installed Complies
03Hot water systems are installed and are- Requirement for a hot water system,
operated to support the efficient use of a) solar systems; or compliant with 53.1, can be conditioned.
natural resources and minimise b) electric heat pump systems; or
consequent pollution such as c) natural gas or LPG systems; or
greenhouse gas emissions. d) any combination of a), b) or c).
Water supply and conservation 54.1 & 55.1 For a Class 1 building Not Applicable
04 On-site water storage is designed other than a Detached house or The proposed development is within a
and operated to support the efficient Multiple Housing Type 1, outside a reticulated water service area.
use of water; reticulated water service area, a
rainwater tank is to be installed with the
AND following minimum storage capacities-
a) Where no more than 3 bedrooms -
05 On-site water storage is adequate 45,000 litres; or
for occupants every day use and fire b) Where more than 3 bedrooms -
fighting purposes. 60,000 litres;
AND
c) There is to be on the lot a dam,
swimming pool or water tank accessible
for use by the fire brigade that contains
at least 5 000 litres of water.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 of 2 Report/ Plans - MCU12/0047Related documentApplication case desk ↗
About this file
- File size
- 43.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.