Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

SUPERSEDED Reference Document Bushfire Hazard Assessment & Management Plan v 2 June 2024 MCU24 0084 (1)

of 85

Page text read automatically using OCR, there may be inaccuracies

Bushfire Hazard Assessment & Management Plan v2 NCES REF: J001313
Lot 4 on RP160124 — 658 Louis Bazzo Dr, Ringtail Creek QLD 4565

Plate 10 —- Existing conditions within the north-east farm track/ fire break trail

 

Plate 11 - Alignment of existing fire break trail/farm track next to hazardous vegetation

To ensure the fire break trail remains available and functional, it is recommended the fire break
trail satisfies the SPP Bushfire 2019 Assessment Benchmark 4 Table 4 Fire trail specifications
identified in Plate 12. Note, minor concessions to the width specifications are deemed
acceptable over short distances to prevent impact to sensitive riparian vegetation and aquatic
habitat about creek crossings.

 

eu me lat

 

 

Width Contains a width of at st 20 metres including

1. A trafficable area (cleared and formed)
a with a minimum width of 4 metres that can accommodate a rural firefighting vehicle
b. with no less than 4.8 metres vertical clearance from canopy vegetation
Cc. with no adjacent inhibiting embankments or retaining walls

2. Aworking area each side of the trafficable area
a with a minimum width of 3 metres each side
b. cleared of all flammable vegetation greater than 0.1 metre in height

3. The balance (ie 10 metres

 

width) managed vegetation area
a sited to separate the trafficable area from adjacent mapped medium, high or very high
potential bushfire intensity areas managed vegetation

b. comprising managed vegetation clear of major surface hazards

Access Access is granted in favour of the local government and Queensland Fire and Emergency
Services

 

Note ~ This access is commonly granted in the

 

Egress Contains trafficable vehicie routes in to low hazard areas, every 200 metres

Table 4 — Fire trail and working area design parameters

 

 

 

Plate 12 - SPP Bushfire 2019 Assessment Benchmark 4 Table 4 Fire trail specifications

The fire break trail is to be maintained for the life of the development. The fire break trail is to
be inspected and any fallout debris removed accordingly prior to each wedding event.

5.5 Vehicular Access
Development in bushfire prone areas should be serviced by safe access/exit points for both

© 2024 26 yf \Semices

 

Document Set ID: 23422887
Version: 3, Version Date: 14/01/2025

Log in to download the original (SUPERSEDED Reference Document Bushfire Hazard Assessment & Management Plan v 2 June 2024 MCU24 0084 (1).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.