Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)

Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.

of 117

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                                                                                           


                                                                                                                                                                                                      SITE FEATURES


                                                                                                                                                                                                                       Overland Flow




                                                                                                                                                                                                                       Disturbed surfaces (approximate)



                                                                                                                                                                                                                       Concentrated flows (Drainage
                                                                                                                                                                                                                       Line)

                                                          Catchment 1                                                                                                          PROJECT NOTE:
                                                                                                                                                                               A site inspection and advisory report was conducted by Luke
                                                                                                                                                                               Hamilton CPESC No. 9205) on the 15 October 2021 post clear-
                                                                                                                                                                               ing works, drainage improvements and earthworks (Refer
                                                                                                                                                                               Appendix A). Best practice (IECA Guidelines) erosion and
                                                                                                                                                                               sediment control advice was provide to the property owner.
                                                                                                                                                                               All works (dam clean-out, removal of weed vegetation, and
                                                                                                                                                                               protection of drainage channel and re-landscaping the
                                                                                                                                                                               property is now complete. Therefore this ESCP is retrospective
                                                  Catchment 2                                                                                                                  to the actual operation works as these completed works
                                                                                                                                                                               require Planning Approval (Noosa Shire, Information Request,
                                                                                                                                                                               OPW21/0332, 15 February 2022).

                                                                                                                                                                               Another site inspection was completed on the 4 March 2022
                                                                                                                                                                               with photos of the completed works and some addition advice
                                                                                                                                                                               (refer Attachment B).

                                                                                                                                                                                         Calculated
                                                                                                                                Catchment                         Calculated                              Mean                           Suggested
                                                                                                                                                                                         Loss per                          Erosion
                                                                                       Sub-Catchment                            Area (ha)                         Soil Lossꜞ                              Slope % +                      Sediment Control
                                                                                                                                                                                         Area                              Hazard
                                                                                                                                                                  (t/ha/yr)                               Distance                       Technique²
                                                                                                                                                                                         (t/yr)
                                                                                                                                    0.20 (approx.
                                                                                                 Catchment 1                                                             110                     22        7%,30m         Very Low       Type 3
                                                                                                                                     disturbance)

    Aerial Photo June 2021 (Prior to Operational Works)                                                                             0.30 (approx.
                                                                                                 Catchment 2                                                             228                     68       14%, 25m        Moderate       Type 3
                                                                                                                                      disturbance
                                                                                                1.    A = K x R x LS x P x C Equation 1 (IECA 2008, Best Practice Erosion and Sediment) Where:                                2.   TYPE 1: Sediment Basin
                                                                                                     A is the predicted soil loss per hectare per year                                                                             TYPE 2: Filter tube dam, rock filter
                                                                                                     K is the soil erodibility factor = 0.015 (medium clay)                                                                        dam, sediment trench, sediment
                                                                                                     R is the rainfall erosivity factor = 5921                                                                                     weir, compost/mulch berm.
                                                                                                     LS is the slope length/gradient factor as Table E3 (IECA 2008):= 0.95 & 1.98                                                  TYPE 3: Sediment fence mulch
                                                                                                     P is the erosion control practice factor = 1.3                                                                                berms, sediment trap.
                                                                                                     C is the ground cover and management factor = 1




                                                                        Client:        Scale:                                                     PROJECT TITLE                                                       DRAWING TITLE
                                                                        Kathy L Ford                                                            26 Sallwood Court, Pinbarren                                          Erosion and Sediment Control Plan
                                                                                                                                                Earthworks for Tree Clearing, Drainage Man-                           Site Features
 19 Central Park Drive, Yandina 4561                                                                                                            agement and Revegetation Works
 www.aussieenvironmental.com.au                                                                                                                                                                                                                Drawing No.
Contact Luke Hamilton 0412 739 706                                                                                                                                                                                                           ESCP01


[OCR of page images]
26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan

 

 
 
  
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
  
 
 
  
  
  

SITE FEATURES

Overland Flow

Disturbed surfaces (approximate)

=> Concentrated flows (Drainage
Line)

PROJECT NOTE:
A site inspection and advisory report was conducted by Luke
Hamilton CPESC No. 9205) on the 15 October 2021 post clear-
ing works, drainage improvements and earthworks (Refer
« Appendix A). Best practice (IECA Guidelines) erosion and
; sediment control advice was provide to the property owner.
; All works (dam clean-out, removal of weed vegetation, and
ae OP a, - . , protection of drainage channel and re-landscaping the

eel ae 7 property is now complete. Therefore this ESCP is retrospective
to the actual operation works as these completed works
require Planning Approval (Noosa Shire, Information Request,
OPW21/0332, 15 February 2022).

 

Another site inspection was completed on the 4 March 2022
with photos of the completed works and some addition advice
(refer Attachment B).

bs
Fs
Fd

Catchment Calculated ae CFT) een Suggested
Sub-Catchment Area (ha) Soil Loss' Pp Slope % + Sediment Control
Area P Hazard P
(t/ ha/ yr) Distance Technique?

(t/ yr)

  

0.20 (approx.
Catchment 1 110 22 7%,30mM  VeryLow Type3
disturbance)

 
 
 

Aerial Photo June 2021 (Prior to Operational Works)

 

0.30 (approx.
Catchment 2 228 68 14%, 25m Moderate Type3
disturbance

 

1. A=KxRxXLS x PxC Equation 1 (IECA 2008, Best Practice Erosion and Sediment) Where: 2. TYPE 1: Sediment Basin
A is the predicted soil loss per hectare per year TYPE 2: Filter tube dam, rock filter
K is the soil erodibility factor = 0.015 (medium clay) dam, sediment trench, sediment
R is the rainfall erosivity factor = 5921 weir, compost/mulch berm.
LS is the slope length/gradient factor as Table E3 (IECA 2008):= 0.95 & 1.98 TYPE 3: Sediment fence mulch
P is the erosion control practice factor = 1.3 berms, sediment trap.

C is the ground cover and management factor = 1

 

 

 

& ENVIROCERT b 0, & & é Client: Scale: PROJECT TITLE DRAWING TITLE
Re Ho overconmenral : <
7 Your enviranmenta! suturron Luke Hamilton Kathy L Ford A 26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan
CPESC . A a Earthworks for Tree Clearing, Drainage Man- Site Features
cen Pate tance a — agement and Revegetation Works Ornina
f .! . Xve 1750 *
Contact Luke Hamilton 0412 739 706 —aeme SF ESCP0O1

 

 

 

 
Log in to download the original file

Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3).pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.