Original source · versioned page text
Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)
Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
SITE FEATURES
Overland Flow
Disturbed surfaces (approximate)
Concentrated flows (Drainage
Line)
Catchment 1 PROJECT NOTE:
A site inspection and advisory report was conducted by Luke
Hamilton CPESC No. 9205) on the 15 October 2021 post clear-
ing works, drainage improvements and earthworks (Refer
Appendix A). Best practice (IECA Guidelines) erosion and
sediment control advice was provide to the property owner.
All works (dam clean-out, removal of weed vegetation, and
protection of drainage channel and re-landscaping the
property is now complete. Therefore this ESCP is retrospective
Catchment 2 to the actual operation works as these completed works
require Planning Approval (Noosa Shire, Information Request,
OPW21/0332, 15 February 2022).
Another site inspection was completed on the 4 March 2022
with photos of the completed works and some addition advice
(refer Attachment B).
Calculated
Catchment Calculated Mean Suggested
Loss per Erosion
Sub-Catchment Area (ha) Soil Lossꜞ Slope % + Sediment Control
Area Hazard
(t/ha/yr) Distance Technique²
(t/yr)
0.20 (approx.
Catchment 1 110 22 7%,30m Very Low Type 3
disturbance)
Aerial Photo June 2021 (Prior to Operational Works) 0.30 (approx.
Catchment 2 228 68 14%, 25m Moderate Type 3
disturbance
1. A = K x R x LS x P x C Equation 1 (IECA 2008, Best Practice Erosion and Sediment) Where: 2. TYPE 1: Sediment Basin
A is the predicted soil loss per hectare per year TYPE 2: Filter tube dam, rock filter
K is the soil erodibility factor = 0.015 (medium clay) dam, sediment trench, sediment
R is the rainfall erosivity factor = 5921 weir, compost/mulch berm.
LS is the slope length/gradient factor as Table E3 (IECA 2008):= 0.95 & 1.98 TYPE 3: Sediment fence mulch
P is the erosion control practice factor = 1.3 berms, sediment trap.
C is the ground cover and management factor = 1
Client: Scale: PROJECT TITLE DRAWING TITLE
Kathy L Ford 26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan
Earthworks for Tree Clearing, Drainage Man- Site Features
19 Central Park Drive, Yandina 4561 agement and Revegetation Works
www.aussieenvironmental.com.au Drawing No.
Contact Luke Hamilton 0412 739 706 ESCP01
[OCR of page images]
26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan
SITE FEATURES
Overland Flow
Disturbed surfaces (approximate)
=> Concentrated flows (Drainage
Line)
PROJECT NOTE:
A site inspection and advisory report was conducted by Luke
Hamilton CPESC No. 9205) on the 15 October 2021 post clear-
ing works, drainage improvements and earthworks (Refer
« Appendix A). Best practice (IECA Guidelines) erosion and
; sediment control advice was provide to the property owner.
; All works (dam clean-out, removal of weed vegetation, and
ae OP a, - . , protection of drainage channel and re-landscaping the
eel ae 7 property is now complete. Therefore this ESCP is retrospective
to the actual operation works as these completed works
require Planning Approval (Noosa Shire, Information Request,
OPW21/0332, 15 February 2022).
Another site inspection was completed on the 4 March 2022
with photos of the completed works and some addition advice
(refer Attachment B).
bs
Fs
Fd
Catchment Calculated ae CFT) een Suggested
Sub-Catchment Area (ha) Soil Loss' Pp Slope % + Sediment Control
Area P Hazard P
(t/ ha/ yr) Distance Technique?
(t/ yr)
0.20 (approx.
Catchment 1 110 22 7%,30mM VeryLow Type3
disturbance)
Aerial Photo June 2021 (Prior to Operational Works)
0.30 (approx.
Catchment 2 228 68 14%, 25m Moderate Type3
disturbance
1. A=KxRxXLS x PxC Equation 1 (IECA 2008, Best Practice Erosion and Sediment) Where: 2. TYPE 1: Sediment Basin
A is the predicted soil loss per hectare per year TYPE 2: Filter tube dam, rock filter
K is the soil erodibility factor = 0.015 (medium clay) dam, sediment trench, sediment
R is the rainfall erosivity factor = 5921 weir, compost/mulch berm.
LS is the slope length/gradient factor as Table E3 (IECA 2008):= 0.95 & 1.98 TYPE 3: Sediment fence mulch
P is the erosion control practice factor = 1.3 berms, sediment trap.
C is the ground cover and management factor = 1
& ENVIROCERT b 0, & & é Client: Scale: PROJECT TITLE DRAWING TITLE
Re Ho overconmenral : <
7 Your enviranmenta! suturron Luke Hamilton Kathy L Ford A 26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan
CPESC . A a Earthworks for Tree Clearing, Drainage Man- Site Features
cen Pate tance a — agement and Revegetation Works Ornina
f .! . Xve 1750 *
Contact Luke Hamilton 0412 739 706 —aeme SF ESCP0O1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.