Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)
Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.
The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
SEDIMENT & EROSION CONTROL GENERAL INSTRUCTIONS
The following erosion and sediment control measures were installed during the completed earthworks for tree clearing,
drainage management and revegetation works;
Table 1 – Best Prac�ce land clearing and rehabilita�on requirements.
Risk Best prac�ce requirements
1. Access tracks for vegetation clearing and site establishment were located to minimise both short and long-term
soil and vegetation disturbance, while giving appropriate consideration to the intended purpose of the pathway and the All Cases All reasonable and prac�cable steps taken to apply best prac�ce erosion control
ability to rehabilitate. measures to completed earthworks, or otherwise stabilise such works, prior to
2. Cleared vegetation was chipped and stockpiled away from drainage lines and used for erosion and sediment an�cipated rainfall-including exis�ng unstable, undisturbed, soil surfaces under the
management or control of the building/construc�on works.
controls and rehabilitation works.
3. Access from public roads was stabilised to prevent sediment being tracked offsite and provide a stable all-weath- Low Disturbed soil surfaces stabilised with minimum 70% cover within 20 days of
er access point to the site. comple�on of works within any works within any area of a work site.
4. Works were completed during the dryer months of Spring 2021.
5. Sediment fence and mulch bunds were installed prior to dam and drainage control works.
6. Stockpiles were established in locations away from flow paths. Moderate Disturbed soil surfaces stabilised with minimum 75% cover within 20 days of
7. Permanent drainage/channel protection matched existing rip rap protection which would have been hydraulical- comple�on of works within any works within any area of a work site.
ly sized to the upstream catchment, slope and expected flows (i.e D50=300mm)
8. The dam spillway also match the rock protection upstream.
High Disturbed soil surfaces stabilised with minimum 75% cover within 10 days of
9.. Landscaping works included comple�on of works within any works within any area of a work site.
- Top soiled and mulch garden beds,
- top soil and hydromulched turf area, and
- rip rap drainage protection within the drainage channel and dam outlet. (IECA Guidelines Table 4.4.7)
10. An erosion risk assessment (RUSLE) has been completed for this project. The project is considered very low to
moderate erosion risk. The rehabilitation works adhered to Best Practice (refer Table 1) for a moderate risk project.
11 All controls have been maintained throughout the construction period.
Client: PROJECT TITLE DRAWING TITLE
Kathy L Ford 26 Sallwood Court, Pinbarren Erosion and Sediment Control Plan
Earthworks for Tree Clearing, Drainage Man- Site Features
19 Central Park Drive, Yandina 4561 agement and Re-vegetation Works
www.aussieenvironmental.com.au Drawing No.
Contact Luke Hamilton 0412 739 706 ESCP02
[OCR of page images]
26 Sallwood Court, Pinbarren
Erosion and Sediment Control Plan
SEDIMENT & EROSION CONTROL GENERAL INSTRUCTIONS
The following erosion and sediment control measures were installed during the completed earthworks for tree clearing,
drainage management and revegetation works;
1. Access tracks for vegetation clearing and site establishment were located to minimise both short and long-term
soil and vegetation disturbance, while giving appropriate consideration to the intended purpose of the pathway and the
ability to rehabilitate.
2. Cleared vegetation was chipped and stockpiled away from drainage lines and used for erosion and sediment
controls and rehabilitation works.
3. Access from public roads was stabilised to prevent sediment being tracked offsite and provide a stable all-weath-
er access point to the site.
4. Works were completed during the dryer months of Spring 2021.
5. Sediment fence and mulch bunds were installed prior to dam and drainage control works.
6. Stockpiles were established in locations away from flow paths.
7. Permanent drainage/channel protection matched existing rip rap protection which would have been hydraulical-
ly sized to the upstream catchment, slope and expected flows (i.e D50=300mm)
8. The dam spillway also match the rock protection upstream.
9... Landscaping works included
- Top soiled and mulch garden beds,
- top soil and hydromulched turf area, and
- rip rap drainage protection within the drainage channel and dam outlet.
10. Anerosion risk assessment (RUSLE) has been completed for this project. The project is considered very low to
moderate erosion risk. The rehabilitation works adhered to Best Practice (refer Table 1) for a moderate risk project.
11 All controls have been maintained throughout the construction period.
Table 1 — Best Practice land clearing and rehabilitation requirements.
Risk Best practice requirements
All Cases All reasonable and practicable steps taken to apply best practice erosion control
measures to completed earthworks, or otherwise stabilise such works, prior to
anticipated rainfall-including existing unstable, undisturbed, soil surfaces under the
management or control of the building/construction works.
Low Disturbed soil surfaces stabilised with minimum 70% cover within 20 days of
completion of works within any works within any area of a work site.
Moderate Disturbed soil surfaces stabilised with minimum 75% cover within 20 days of
completion of works within any works within any area of a work site.
High Disturbed soil surfaces stabilised with minimum 75% cover within 10 days of
completion of works within any works within any area of a work site.
(IECA Guidelines Table 4.4.7)
Wtematerad ine”
“® ENVIROCERT « A Client:
wwe —ovircnamentral
Your Environmental Setution
Luke Hamilton
CPESC
Cer tiie Professional in Erosion &
Sediment Contro’
Kathy L Ford
19 Central Park Drive, Yandina 4561
www.aussieenvironmental.com.au eins aes
Contact Luke Hamilton 0412 739 706 [SS eS
a
PROJECT TITLE
26 Sallwood Court, Pinbarren
Earthworks for Tree Clearing, Drainage Man-
agement and Re-vegetation Works
DRAWING TITLE
Site Features
Erosion and Sediment Control Plan
Drawing No.
ESCP02
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.