Skip to the record
Search everything, all in one place.

Original source · versioned page text

Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3)

Attached to the e-mail 26 Sallwood Ct - OPW21/0332 - response to Information Request.

of 117

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (12.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

 Rural zone code (Table 6.8.3.3 of Noosa Plan)
 Performance Outcomes               Acceptable Outcomes                                    Response/Comments
 Safety and amenity
 PO9                                           No acceptable outcome provided              The operational works were completed during the drier months before
 Development does not result in                                                            the wet season. Erosion and sediment controls were in place during
 environmental harm or environmental                                                       works (Refer attached ESCP). Constructions were completed under
 nuisance to sensitive land uses.                                                          Safety Works Methods and during legal noise limits hours.
 PO10                                          AO10
 Development does not compromise the           Safe vehicular access is provided to and    Temporary stabilised access was used within the road reserve. No part
 safety, capacity or operation of the road     from the site without adversely impacting   of the existing road was blocked during works. All the disturbed
 network.                                      on the safety of the road network.          surfaces within the Road Reserve was revegetated and maintained as
                                                                                           per the original surface (turf).



 Environment, heritage, and scenic amenity
 PO11                                          AO11.1
 Development does not have a significant       Development does not result in sediment,    The operational works were completed during the drier months before
 adverse impact on the natural values of       soil or other material                      the wet season. There was a risk during clearing and earthworks that
 the site including through:                   including building materials or waste
                                               products being released into the road
                                                                                           sediment would be released to downstream environments. Appropriate
                                               reserve, stormwater drains, waterways or    measures were to be in place (i.e. mulch bunds and the existing dam
 a) loss of biodiversity values, fauna                                                     used as a sediment trap). Refer to attached Erosion and Sediment
                                               adjacent properties.
    habitat and fish passage;                                                              Control Plan
 b) changes to natural drainage;
                                               AO11.2
 c) disturbance to any wetland systems;        Natural Vegetation is retained wherever     Previously most of the land was used as horse paddocks with the new
 d) erosion and the transport of               possible.
    sediments off site (including pollutants
                                                                                           owners re-landscaping, removing the Camphor Laurels dominant
    and other contaminants which would                                                     drainage line and improving drainage protections and improving the
                                               AO11.3                                      existing dam’s capacity.
    affect the capacity of agricultural        Where there is a nominated building
    lands);                                    envelope on the lot, clearing of
 e) worsening of landslide or fire risk;       native vegetation and building works do     The completed earthworks and clearing vegetation was strategically
 f) on-site effluent disposal;                 not extend beyond the building envelope,    planned to ensure impacts on the environment was minimised and
 g) creation of dust and air pollutants;       except for the purposes of a                improved upon. The change in landscape within this property was a
 h) disturbance of buildings and features,     driveway access.                            desire of a new landowner to create a garden that reflects their interest
    including natural features, of cultural                                                while protecting the environmental values of land and surrounds.
    heritage significance.




Planning Report 26 Sallwood Rd, Binbarren                                                                Page 19 of 28
Log in to download the original file

Noosa Council Planning Report - 26 Sallwood Ct, Pinbarren. (3).pdf · 12.7 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.