Original source · versioned page text
2016-05-10 Planning & Environment Committee Agenda
The original of this document is very large (11.4 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 10 MAY 2016
15. All landscape works must be maintained generally in accordance with the approved design
for the life of the development.
16. All landscape works must be established and maintained in accordance with horticultural
best practice with construction techniques that allow for healthy, sustained and vigorous
plant growth. All plant material must be allowed to grow to full form.
Waste
17. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy “Waste Management Multi-Dwellings and Commercial and
Industrial Premises”, including an external imperviously paved area correctly sized for all
refuse and recycling containers and suitably screened from public places and neighbouring
properties.
Noise Nuisance
18. Noise emission from mechanical equipment shall comply with the following requirements:
18.1. Air-conditioning and Refrigeration
7am to 10pm: Maximum background + 5dB(A)
10pm to 7am: Maximum background + 3dB(A)
18.2. Pumps
7am to 7pm: Maximum background + 5dB(A)
7pm to 10pm: Maximum background + 3dB(A)
10pm to 7am: No audible noise.
19. Submission of written certification from a suitably qualified person confirming that the noise
levels from all mechanical equipment comply when measured at either the residential
boundary or outside the most exposed part of an affected building, whichever is the closest
to the equipment. The assessment and certification is required immediately after
installation of the equipment and prior to any occupation of the building, and in a format
approved by Council. All equipment should be operating at the same time to test the
overall noise level created.
Advice: It is recommended the person you engage to certify the installation is involved at
the plan development stage so they can recommend where equipment is best located.
They can also advise about noise enclosures and make other suggestions to avoid noise
problems that are is costly deal with post-construction.
20. Noise from residential building works shall comply with the following –
20.1. Limited to between 7:00am to 6:30pm Monday to Saturday.
20.2. All reasonable measures are taken to minimise noise emissions.
20.3. Not permitted on Sunday or public holidays.
ENGINEERING
External Works
21. Banksia Avenue and Grant Street must be upgraded for the length of their frontage to the
subject site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
21.1. construction of pedestrian footpaths in accordance with the conditions of this
Decision Notice
Page 32 of 96
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.