PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
e. The Addendum Letter by Cardno (document number WE17064) dated 23 March
2018.
f. The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated 27
September 2018.
g. A minimum Finished Floor Level (FFL) of the Aged Care Facility and any associated
facilities at 8.80m AHD.
h. A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
AHD.
i. All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
specifications and guidelines are to be adhered to.
Condition 27 – Drainage Easement
27. An easement for drainage purposes must be registered against the titles of the properties
in favour of Council over the land area identified as being below the post development 1%
AEP flood level on the subject site from flooding sources external to the site (excluding
proposed structures). The easement width must be in accordance with Noosa Council’s
DDPSP. The easement must be granted at no cost to Noosa Council. The wording of the
easement documentation must be in accordance with Council’s Standard Easement
document.
Applicant’s Request
The condition is not required as the area below Q100 is to be dedicated to Council as per
condition 36. Request - delete condition.
Assessment
It is agreed that the area to be dedicated to Council as an Environmental Park does not need to
be covered by the easement as it will be protected as a park. However, the easement should
apply to the area of land below Q100 not required as Environmental Park as per representations
made to conditions 1, 2 and 36 which exclude some of the area below Q100. It is therefore
recommended that the condition be amended as follows:
27. An easement for drainage purposes must be registered against the titles of the properties
in favour of Council over the land area identified as being external to the area to be
dedicated as Environmental Park and below the post development 1% AEP flood level on
the subject site from flooding sources external to the site (excluding proposed structures).
The easement width must be in accordance with Noosa Council’s DDPSP. The easement
must be granted at no cost to Noosa Council. The wording of the easement documentation
must be in accordance with Council’s Standard Easement document.
Condition 39 - Fencing
39. A permanent fence must be constructed along the interface of the development site with
the land area to be dedicated. The fence must be constructed in accordance with an
Operational Works approval and must be to the following specifications:
a. 1.8 metres high
b. Durable Chainwire
c. Educational Signage for wetlands protection
Applicant’s Request
The applicant requests modification of the condition to reflect a revised wetland fence which is
proposed to comprise a 2.1 metre high pool fence with vertical bars at 100 centres from ground
to top. This fence type has been detailed on the previously submitted plans and the vertical
fencing is required as the chain wire fence detailed in the condition is climbable by residents and
Page 37 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.