2018-11-06 Planning & Environment Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
a. driveway crossovers generally in accordance with Council’s Standard Drawing
Number RS-051 and any associated addendum.
b. suitable safety measures, including warning signage, to improve driver
awareness of the flood barrier, service vehicles and pedestrians and to
enhance driver and pedestrian safety. Warning signage must be provided near
the exit ramp from the underground parking area and the guest/service area to
warn motorists of pedestrian movement along the frontage street.
Car Parking
46. A minimum of 17 car parking spaces, inclusive of 1 courtesy bus space, must be
provided and marked on the site and made available and accessible at all times while
the use is open for business. The works must be undertaken in accordance with an
Operational Works approval and must include in particular:
a. 13 customer parking spaces (including 4 scooter spaces) within the total, which
are clearly marked for that purpose and accessible at all times for visitor use.
b. 3 staff parking spaces within the total, which are clearly marked for that
purpose.
c. 1 courtesy bus space within the total.
d. 2 disabled parking space/s within the total.
e. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities.
f. Provision of 20 bicycle parking spaces.
47. All car parking areas and access driveways must be maintained exclusively for
vehicle parking and manoeuvring and kept in a tidy and safe condition at all times.
48. Directional signage must be provided to direct visitors and customers to the car
parking spaces provided on site.
Service Vehicles
49. Service vehicle parking, manoeuvring and standing spaces must be provided on the
site. The works must be undertaken in accordance with an Operational Works
approval.
Pedestrian and Bicycle Facilities
50. Pedestrian and bicycle facilities must be provided for the development. The works
must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. a 2 metre wide footpath within the road verge for the entire length of the site’s
frontage to Mary Street.
Condition 50 is imposed pursuant to s128 of the Planning Act 2016 being necessary
trunk infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
51. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. the works shown on drawing number 17699-SK101 Revision A prepared by
TOD Engineers and Project Managers dated 17 August 2018, with the inclusion
of the following:
i. The storage tank must have sufficient capacity to cater for the runoff from
the driveway in a 1%AEP rain event as a minimum.
ii. A back up power system for the pump that is independent of the mains
network.
Page 47 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.