PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 6 NOVEMBER 2018
Acid Sulfate Soils
52. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified person*
and referenced in a Development Permit for Operational Works. The Acid Sulfate Soil
and Groundwater Management Plan must specifically address how lowering of the
groundwater level as a result of the works will be avoided.
*(Refer to Advisory Note)
53. All waters, including stormwater runoff, groundwater seepage and leachate from acid
sulfate soils must achieve the following quality prior to release from the site:
a. a pH range of 6.5-8.5 pH units
b. 50mg/L maximum total suspended solids concentration
c. 0.3mg/L maximum total iron concentration
d. 0.2mg/L maximum total aluminium concentration
e. no visible plume at either the point of release from the site or within a
waterway
54. The basement must be designed and constructed as a water excluding structure in
accordance with Australian Standard AS3735 "Concrete Structures for Retaining
Liquids" to ensure groundwater does not enter the basement after construction is
completed.
55. All treated material must undergo verification testing at the rate of one sample per
250m3 throughout the duration of the excavation phase of the development. The
verification testing must be undertaken by a qualified person* using the SPOCAS
or Chromium Reducible Sulphur testing suite, and the results must be submitted
to Council for appraisal.
Electricity and Telecommunication Services
56. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
57. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and
all applicable legislation at the time of construction.
Earthworks and Retaining Walls
58. All earthworks must be undertaken in accordance with an Operational Works
approval, and contained entirely within the subject site unless written permission from
the respective landowner(s) is provided to Council.
59. All retaining walls must be designed and constructed in accordance with the planning
scheme and must be certified by an RPEQ where exceeding 1.0m in height. All
retaining walls that are publicly accessible and exceed 1.0m in height must be fitted
with a commercial grade safety fence.
Preparation of a Preliminary Construction Management Plan
60. A preliminary Construction Management Plan must be submitted with the Operational
Works application and must address the following:
a. traffic management during all aspects of the construction phase including:
Page 48 of 84
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.