132003.220729.6 Request to Change Existing Approval 14 Park Rd Noosa
12/APR/2011/TUE 12:25 FAX No, P. 006
2003/220729
Erosion and Sediment Control
35. Any person acting on this permit shall prevent erosion and sediment export from leaving the
site. Site control measures such as silt fencing, controlled gravel access to the site and
controlled disposal of waste, will be necessary-
In this regard plans detailing the methods of controlling erosion and sediment are required to
be submitted to the Council for approval prior to obtaining a Development Permit for
Operational Works.
Vegetation Protection
36. Vehicular pavements within the drip zone of any of the existing trees on site to be retained
shall be designed as a pervious pavement (such as grass paving cells or similar), as this will
allow water that falls on this surface to penetrate to the trees root system. The pavement shall
be constructed so as not to damage the tree or their root system and in this regard temporary
fencing shall be provided around the trees during construction to help protect them.
Plans shall be submitted to the Council for approval that clearly show the type and extent of
the pervious pavement and the temporary fencing prior to obtaining a Development Permit for
Operational Works.
Roadworks Contributions
37. A roadworks contribution of $2,524 towards the Coastal Major Road Network in accordance
with Planning Scheme Policy PSP42, shall be paid to the Council prior to obtaining a
Development Permit for Operational Works. This amount will be subject to variations in the
Price Index, All Groups Brisbane from March 2004 until the date of payment.
Pathway Contributions
38. A pathway contribution of $246 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from March 2004 until the date of payment.
General
39. Any damage caused to any public utility during the course of construction shall be repaired to
Council's standards and at no cost to Council.
40. Any alteration of any public utility or other facilities necessitated by the development of the
land or associated construction works external to the site shall be at no cost to Council.
41. The transportation of all materials to and from the site shall be undertaken in a mariner such
I that no particle matter escapes onto a public road. All vehicles carrying materials either to or
from the site shall be covered to prevent materials including dust being windblown from the
vehicle.
Building
42. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of the work confirming compliance with the
maximum building height of 9 metres above natural surface.
43. All building works shall be in accordance with the Geotechnical reports prepared by Golder
Associates dated July 2003 and Morrison Geotchnio dated 23 November 2006 subject to the
following conditions:-
43.1 An amended Geotechnical Report addressing the design amendments associated
with this approval shall be submitted to Council for its information prior to the
application for Operational Works;
43.2 There is to be no uncontrolled discharge of water onto the slope;
Page5of10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
132003.220729.6 Request to Change Existing Approval 14 Park Rd NoosaRelated documentApplication case desk ↗
About this file
- File size
- 3.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.