Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
The subject site will not deviate from this arrangement in its fully developed state. The internal
driveway running on the northern boundary of the development, together with the private walkway
on the southern boundary will act as the main overland flow paths discharging into the detention
tank. Appendix C contains the catchment plan of the fully developed site.
Hydrological Modelling (DRAINS)
Hydrological modelling of the existing and developed site has been modelled using DRAINS software.
The ILSAX/Horton hydrological model was adopted. FIGURE 5 is an illustration of the model setup
within DRAINS.
FIGURE 5: DRAINS MODEL
The DRAINS model peak flow results for the existing case can be viewed in TABLE 2, and the results
for the unmitigated developed case in TABLE 3.
TABLE 2: PRE-DEVELOPMENT CATCHMENT RUNOFF ESTIMATIONS
Catchment ID Peak Flow (m³/s)
1% AEP 2% AEP 5% AEP 10% AEP 20% AEP 50% AEP 63.2%
AEP
Existing
Catchment – 0.062 0.055 0.047 0.04 0.033 0.023 0.02
PreDevCat
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.