       TABLE 3: POST-DEVELOPMENT CATCHMENT UNMITIGATED RUNOFF ESTIMATIONS

    Catchment ID                                     Peak Flow (m³/s)
                        1% AEP   2% AEP     5% AEP       10%       20% AEP      50%       63.2%
                                                         AEP                    AEP        AEP
 Sub-catchment 1
                        0.012     0.011      0.009      0.008          0.007    0.005     0.004
 (Roof 1 + Driveway)
 Sub-catchment 2
                        0.006     0.005      0.004      0.003          0.003    0.002     0.002
 (Roof 2 + Walkway)
 Sub-catchment 3
                        0.008     0.007      0.006      0.005          0.004    0.003     0.003
 (Roof 3 + Ramp)
 Sub-catchment 4
                        0.012     0.011      0.009      0.008          0.007    0.005     0.004
 (Roof 4)
 Sub-catchment 5
                        0.003     0.003      0.002      0.002          0.002    0.001     0.001
 (Walkway Terrace)
 Sub-catchment 6
 (pool deck Terrace)
                        0.017     0.016      0.013      0.012          0.009    0.006     0.005
 Sub-catchment 7
 (Garden Terrace 1)


The DRAINS model was set up using BOM rainfall parameters and hydrological model parameters
listed in TABLE 4.

                                 TABLE 4: MODEL PARAMETERS

                   Parameter                                            Value
           Hydrologic routing Method                                ILSAX/Horton
       Impervious Area depression storage                               1 mm
        Pervious Area depression storage                                5 mm
                    IFD Data                                             2019
             Time of Concentration                             Kinematic Wave Equation


Model Validation and Calibration
For validation purposes, the peak discharge from each catchment and relevant catchment
combinations have been calculated for the 1% AEP using the Rational Method and compared to the
peak discharge generated using the DRAINS model. TABLE 5 and TABLE 6 are summaries of the model
validation exercise.

The Rational Method calculations are enclosed in Appendix D.

                TABLE 5: PRE-DEVELOPMENT CATCHMENT RUNOFF VALIDATION

         Catchment ID                   1% AEP Peak Flows (m³/s)                 Difference
                                  Rational Method     DRAINS Model
 Existing Catchment –
                                       0.075                   0.062               -17%
 Pre-Dev Cat




24083 – 51 Elanda Street, Sunshine Beach - SMP                                            Page 11

Used in these records

About this file

File size
15.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Stormwater Management Plan.pdf · 15.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.