Council archive · source document
Stormwater Management Plan · MCU24/0153
Plans and drawings: the text below has words only, no drawings.
Very large file (15.9 MB): may take a few minutes to open.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
FIGURE 6: STORAGE VOLUME GRAPH FOR THE PROPOSED DETENTION TANK
Table 7 compares the pre-developed unmitigated flows against the mitigated post-development
flows.
TABLE 7: PRE-DEVELOPMENT FLOWS VS. POST-DEVELOPMENT MITIGATED FLOWS
Existing Case - Unmitigated Developed Case - Mitigated
Catchment ID / Catchment Total Discharge Catchment Total Discharge
Storm Event Description (m³/s) Description (m³/s)
1% AEP PreDevCat 0.062 PostDevCat 0.046
2% AEP PreDevCat 0.055 PostDevCat 0.041
5% AEP PreDevCat 0.047 PostDevCat 0.035
10% AEP PreDevCat 0.040 PostDevCat 0.031
20% AEP PreDevCat 0.033 PostDevCat 0.025
50% AEP PreDevCat 0.023 PostDevCat 0.017
63.2% AEP PreDevCat 0.020 PostDevCat 0.015
24083 – 51 Elanda Street, Sunshine Beach - SMP Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Stormwater Management Plan.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.