                                                                                         2008/858



10.   Following the construction of the proposed stormwater drainage within the verge, the
      demolished concrete footpath shall be replaced. Prior to replacement of the footpath, the
      alignment shall be confirmed on site with Council’s Construction Technical Officer. The
      footpath shall have a slip resistant surface and the expansion joints shall be “saw cut”, not
      trowel jointed.
11.   Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
      installed into the first existing external downstream stormwater structure.
      These devices are to be checked and cleaned on a regular basis and specifically after each
      rain event.
      These devices are to remain in place during the civil works and construction phases of the
      development.
      The location and type of device to be installed shall be established at the “pre start” meeting
      with Council’s Construction Technical Officer and shall be installed prior to the
      commencement of any works.
12.   All landscaping is to be constructed in accordance with Council’s Planning Scheme Policy
      PSP03 Landscaping Plants and Guidelines.
13.   Council’s Construction Technical Officer (phone 0410 512 505) shall be given seven (7) days’
      notice of intention to commence works to arrange a “pre start” meeting prior to the
      commencement of those works.
14.   The principal contractor must have all the appropriate insurance and public liability
      documentation to carry out the works. The principal contractor is also responsible to ensure
      that any sub contractors also have the appropriate insurance and public liability
      documentation.
15.   Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
      Council’s signed approved drawings and conditions by the applicant.
16.   The Consulting Engineers for the project shall be currently Registered Professional Engineers
      of Queensland (RPEQ). The Consulting Engineers are responsible for arranging all
      inspections with Council’s Construction Technical Officer or nominated staff. Council’s
      Construction Technical Officer shall provide an inspection form for ‘signing off’ by the Engineer
      at appropriate stages of construction and during on-site meetings. The Construction Technical
      Officer will also sign the form at each stage when requested conditions have been satisfied.
      The works (footpath, and that part of the stormwater drainage and concrete driveway within
      the road reserve) will be accepted “On Maintenance” after this form has been signed by the
      inspector for each stage and a letter from the Engineer has been received by Council
      requesting that the works go “On Maintenance”.
17.   Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
      project. (This person will be the contact for the project).
18.   Council standards shall apply to these works unless otherwise modified herein.
19.   The person acting on this permit shall ensure that its consultants and contractors take all
      reasonable care during the construction of the engineering works to ensure that Council
      property, road pavements or facilities (such as underground drainage, water supply,
      sewerage, footpaths, kerbing, landscaping, street furniture, etc.) are protected against any
      damage or interference whatsoever.
      If any Council property or facilities should be damaged by the Applicant or any of its
      Consultants or Contractors through any cause whatsoever in the course of, directly or
      indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
      forthwith notify Council’s CEO and shall forthwith rectify the damage to that property or facility
      at its cost and to the satisfaction of Council’s CEO.

                                                                                       Page 3 of 9

Used in these records

About this file

File size
66 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - 010.2008.00000858.001 [As Published].pdf · 66 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.