Original source · versioned page text
Swmp
Very large file (11.4 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Peak flow rates determined for each 3 cases are outlined in Table 6.6.
Table 6.6 – Comparison of Peak Flows (L/s)
AEP Storm Q1 Q2 Q5 Q10 Q20 Q50 Q100
(1EY) (0.5EY) (0.2EY) (10%AEP) (5%AEP) (2%AEP) (1%AEP)
Existing 110 160 216 251 295 352 391
PFR
Mitigated 105 159 204 248 293 349 386
(PFR – Peak Flow Rate)
As shown in Table 6.6 the proposed OSD facilities have demonstrated the proposed mitigated peak
discharge flow rates will not exceed the total pre-development flows for all design storms, up to and
including the 1% AEP Design Storm.
The proposed stormwater detention system is therefore considered to be adequate for the development.
6.2 Proposed Drainage
The proposed site drainage is detailed in drawings SCG 33132 - SW1.1, SW1.2 & SW1.3 & SW1.4
(Appendix D) and is discussed below.
As defined in the Noosa Plan 2020 stormwater drainage must be designed in accordance with QUDM
2017, therefore the following design storms were adopted: -
1. Minor Drainage System - 10% AEP ARI (Q10 Storm)
2. Major Drainage System - 1% AEP ARI (Q100 Storm)
6.3 Downstream Infrastructure Consideration
To determine if the existing lawful points of discharge for Catchment B is capable to safely convey the
post development mitigated flow we have modelled the existing drainage infrastructure as discussed in
Section 4.1 using the software PC DRAINS. The modelling has demonstrated that all post development
mitigated peak will be below existing flow rates and can be safely contained within the existing 375m2
diameter stormwater line traversing the rear of Lots 75-77 RP 71151 & Lot 3 SP 208257.
Proposed Catchment B will be connected to the existing stormwater drainage infrastructure within
Headland Drive, via a new 375 diameter RCP branch into the site.
This will increase flows within a length of the pipes within Headland Drive.
The below figure 6.2 shows the pipe run in question: -
SCG Consulting Engineers Page 19 SCG Ref: 33132(SWMP)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.