                              AGENDA


             General Committee
                  Meeting

                Monday, 19 January 2026

                      commencing at 12:30 PM
               Council Chambers, 9 Pelican Street, Tewantin




Committee: Crs Brian Stockwell (Chair), Karen Finzel, Amelia Lorentson, Jessica Phillips, Tom
Wegener, Frank Wilkie, Nicola Wilson




                          “Noosa Shire – different by nature”




                                                                                       Page 1 of 141
Log in to download the original file

63d6d62b3f.pdf · 11.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

Full text of pages 2 to 122 (of 141)

Page 2

GENERAL COMMITTEE MEETING                                   19 JANUARY 2026




1.    DECLARATION OF OPENING

2.    ACKNOWLEDGEMENT OF COUNTRY

3.    ATTENDANCE & APOLOGIES

4.    CONFIRMATION OF MINUTES

4.1   GENERAL COMMITTEE MEETING MINUTES 15 DECEMBER 2025

5.    PRESENTATIONS

6.    DEPUTATIONS

7.    ITEMS REFERRED FROM COMMITTEES

8.    REPORTS DIRECT TO GENERAL COMMITTEE

8.1   ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN 2026

8.2   RESPONSE TO NOTICE OF MOTION - TRIAL OF REMOTE RESCUE TUBES/LIFE
      RINGS AT UNPATROLLED BEACHES

8.3   PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY – NOVEMBER 2025

8.4   PROCUREMENT CONTRACTS ASSESSMENT WORKING TEAM - CONTRACT AWARDS
      UNDER CEO DELEGATION

8.5   FINANCIAL PERFORMANCE REPORT - DECEMBER 2025

9.    CLOSED SESSION

10.   MEETING CLOSURE




                                                                         Page 2 of 141

Page 3

GENERAL COMMITTEE MEETING                                           19 JANUARY 2026


4.1       GENERAL COMMITTEE MEETING MINUTES 15 DECEMBER 2025

Recommendation
The Minutes of the General Committee Meeting held on 15 December 2025 be received and
confirmed.




                                                                                Page 3 of 141

Page 4

                            MINUTES


             General Committee
                  Meeting

             Monday, 15 December 2025

                                    12:30 PM
               Council Chambers, 9 Pelican Street, Tewantin




Committee: Crs Brian Stockwell (Chair), Karen Finzel, Amelia Lorentson, Jessica Phillips,
Tom Wegener, Frank Wilkie, Nicola Wilson




                         “Noosa Shire – different by nature”




                                                                                   Page 4 of 141

Page 5

GENERAL COMMITTEE MEETING MINUTES                                           15 DECEMBER 2025



1     DECLARATION OF OPENING
      The meeting was declared open at 12.30pm.

2     ACKNOWLEDGEMENT OF COUNTRY
      Noosa Council respectfully acknowledges the Traditional Custodians of the lands and waters
      of the Noosa area, the Kabi Kabi people, and pays respect to their Elders, past, present and
      emerging.

3     ATTENDANCE & APOLOGIES
      COMMITTEE MEMBERS
      Cr Brian Stockwell (Chair)
      Cr Karen Finzel
      Cr Amelia Lorentson
      Cr Jessica Phillips
      Cr Tom Wegener
      Cr Frank Wilkie
      Cr Nicola Wilson

      EXECUTIVE
      Chief Executive Officer Larry Sengstock
      Director Community Services Kerri Contini
      Acting Director Corporate Services Margaret Gatt
      Director Development & Regulation Richard MacGillivray
      Director Strategy and Environment Kim Rawlings
      Director Infrastructure Services Shaun Walsh

      APOLOGIES
      Nil.



4     CONFIRMATION OF MINUTES

4.1   GENERAL COMMITTEE MEETING MINUTES 17 NOVEMBER 2025
      Committee Recommendation
      Moved:            Cr Frank Wilkie
      Seconded:         Cr Amelia Lorentson
      The Minutes of the General Committee Meeting held on 17 November 2025 be received and
      confirmed.
      Carried.
      For:              Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                        Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
      Against:          None



5.    PRESENTATIONS
      Nil.




                                                                                            Page 5 of 141

Page 6

GENERAL COMMITTEE MEETING MINUTES                                          15 DECEMBER 2025


6.    DEPUTATIONS
      Nil.



7     ITEMS REFERRED FROM COMMITTEES

7.1   NOOSA HOLIDAY PARKS - FEES AND CHARGES (Referred from Services &
      Organisation Committee Dated 9 December 2025)
      Committee Recommendation
      Moved:            Cr Frank Wilkie
      Seconded:         Cr Tom Wegener
      That Council
      A. Note the report by the Commercial Business Advisor to the Services & Organisation
         Committee dated 9 December 2025
      B. Set fees and charges for the Noosa Holiday Parks to align with the end of the January
         2027 Queensland school holidays; and
      C. Adopt the proposed General Cost Recovery Fees and Commercial Charges schedule
         for the Noosa Holiday Parks for the period ending 11 July 2027 as detailed in the tables
         contained within the report.

      Carried.
      For:             Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                       Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
      Against:         None




8     REPORTS DIRECT TO GENERAL COMMITTEE

8.1   FINANCIAL PERFORMANCE REPORT - NOVEMBER 2025
      Committee Recommendation
      Moved:            Cr Nicola Wilson
      Seconded:         Cr Jessica Phillips
      That Council note the report by Revenue Services Manager and Financial Services Manager
      (Acting) to the General Committee dated 15 December 2025 regarding Council's financial
      performance to 30 November 2025.
      Carried.
      For:             Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                       Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
      Against:         None




                                                                                            Page 6 of 141

Page 7

GENERAL COMMITTEE MEETING MINUTES                                           15 DECEMBER 2025


8.2   ADOPTION OF DESTINATION MANAGEMENT PLAN
      Motion
      Moved:            Cr Amelia Lorentson
      Seconded:         Cr Nicola Wilson
      That Council
      A. Note the Draft Noosa Destination Management Plan and the submissions received,
         acknowledge the need for further analysis and refinement, and defer adoption of the
         current draft to the April 2026 round of meetings; and
      B. Engage a suitably qualified, independent destination management professional to finalise
         the 10-year Destination Management Plan.

      Lost.
      For:              Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola Wilson
                        Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Frank
      Against:          Wilkie

      Motion
      Moved:             Cr Frank Wilkie
      Seconded:          Cr Tom Wegener
      That Council
         A. Note the report by the Director Environment and Strategy and Manager Economic
             Development and Destination Management to the General Committee dated 15
             December 2025;
         B. Endorse the Destination Management Plan (DMP) – For the Love of Noosa -
             provided at Attachment 1;
         C. Note the Draft Implementation plan, provided at Attachment 2, to support the
             implementation of the DMP, noting this plan will be refined with input from
             partner/support organisations, reviewed and updated on an annual basis and
             informed by Council’s annual budget considerations; and
         D. Delegate authority to the CEO to make minor changes or amendments to the DMP
             and associated appendices if required prior to designing and publishing final
             documents on Council’s website.


      Amendment No. 1
      Moved:             Cr Brian Stockwell
      Seconded:          Cr Nicola Wilson
      That Item C be amended to read:
      C. Note the Draft Implementation plan, provided at Attachment 2, to support the
      implementation of the DMP noting this plan will be refined with input from partner/support
      organisations, reviewed and updated on an annual basis; with this process including:
         1. Consideration by Council of the advice provided by the Destination Stewardship
         Council; once established, in accordance with its Terms of Reference (form and function)
         to be specifically agreed to by Council (noting a key function of the proposed Stewardship
         Council is to provide recommendations on refinements to the Monitoring and Evaluation
         Framework);
         2. The specific actions relating to parking will be refined and determined by Council
         through the Parking Management Plan process currently in progress as approved in 25/26
         Council budget; and
         3. Project outlines including, any proposed community or stakeholder consultation,
         costings and resourcing for each priority action be considered and agreed to by Council
         as part of the budget process.




                                                                                             Page 7 of 141

Page 8

GENERAL COMMITTEE MEETING MINUTES                                          15 DECEMBER 2025


     Lost.
     For:              Cr Brian Stockwell, Cr Tom Wegener, Cr Frank Wilkie
     Against:          Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola
                       Wilson




     Amendment No. 2
     Moved:             Cr Jessica Phillips
     Seconded:          Cr Amelia Lorentson
     That Item E. be added to read:
     E. Ensure that any action or measure within the DMP that is dependent on an unendorsed
     plan, policy or strategy must be framed only as an investigation, feasibility study, or issue
     analysis for future Council consideration.
     Lost.
     For:               Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola Wilson
     Against:           Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Frank
                        Wilkie


     Amendment No.3
     Moved:            Cr Jessica Phillips
     Seconded:         Cr Amelia Lorentson
     That Item E be added to read:
     E. Ensure that actions that pre-empt decisions on matters not yet determined by Council
     (including but not limited to parking management approaches, visitor contributions, STA
     measures, or new revenue mechanisms) must be removed or reclassified as ‘subject to
     Council decision following receipt of evidence and analysis’.
     Lost.
     For:              Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola Wilson
     Against:          Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Frank
                       Wilkie


     The meeting adjourned at 2.34pm.
     The meeting resumed at 2.44pm.


     Amendment No. 4
     Moved:            Cr Jessica Phillips
     Seconded:         Cr Brian Stockwell
     That Item E be added to read:
     E. Amend the heading in the final column of the Monitoring and Evaluation Framework to
     read: "Potential Measures.”
     Carried.
     For:              Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                       Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
     Against:          None




                                                                                            Page 8 of 141

Page 9

GENERAL COMMITTEE MEETING MINUTES                                            15 DECEMBER 2025


     Amendment No. 5
     Moved:             Cr Amelia Lorentson
     Seconded:          Cr Karen Finzel
     That Item F be added to read:
     F. Establish a DMP Delivery Risk Register and include in the Terms of Reference for the
     Destination Stewardship Council (DSC) and report to Council annually as part of the annual
     review. The register will outline delivery risks, dependencies, resource constraints, and
     mitigation strategies.
     Carried.
     For:               Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                        Phillips, Cr Frank Wilkie, Cr Nicola Wilson
     Against:           Cr Tom Wegener


     Amendment No. 6
     Moved:             Cr Amelia Lorentson
     Seconded:          Cr Jessica Phillips
     That Item G be added to read:
     G. Ensure that any action likely to materially affect local business activity or the amenity of
     nearby residents including paid parking, congestion charging, one-way corridor trials or
     precinct closures, be subject to an engagement with affected sectors before Council decision.
     Carried.
     For:               Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                        Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
     Against:           None


     Amendment No. 7
     Moved:            Cr Nicola Wilson
     Seconded:         Cr Jessica Phillips
     That Item C be amended to read:
     C. Not take Attachment 2 to the Report - Draft Implementation Plan - into consideration until
     there has been review by an appropriate expert, and co-development of relevant actions that
     can be reliably measured and reported on.
     Lost.
     For:              Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola Wilson
     Against:          Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Frank
                       Wilkie

     Amendment No. 8
     Moved:           Cr Amelia Lorentson
     Seconded:        Cr Jessica Phillips
     That Item H be added to read:
     H. Amend the DMP to include a clear objective for the economic management of the visitor
     economy, supported by defined strategies, actions and measurable outcomes.
     Carried.
     For:             Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica Phillips, Cr Frank
                      Wilkie, Cr Nicola Wilson
     Against:         Cr Brian Stockwell, Cr Tom Wegener




                                                                                              Page 9 of 141

Page 10

GENERAL COMMITTEE MEETING MINUTES                                             15 DECEMBER 2025


     Amendment No. 9
     Moved:            Cr Amelia Lorentson
     Seconded:         Cr Tom Wegener
     That Item I be added to read:
     I. Amend the DMP to include an action that proposes the development of a Council Advocacy
     and Partnership Strategy to support implementation of the plan.
     Carried.
     For:              Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                       Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson
     Against:          None

     Amendment No. 10
     Moved:            Cr Amelia Lorentson
     Seconded:         Cr Karen Finzel
     That Item J be added to read:
     J. Include that carrying capacity measures explicitly recognise resident access to beaches,
     parks, and natural areas, ensuring it is not unreasonably restricted.
     Lost.
     For:              None
     Against:          Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica
                        Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr Nicola Wilson


     Amendment No. 11
     Moved: Cr Phillips
     That Item J be added to read:
     J. Ensure that actions within the Monitoring and Evaluation Framework and 3-Year
     Implementation Plan that fall wholly or partly outside Noosa Council’s legislative or operational
     remit and sit with State government be reframed as ‘advocacy priorities’ 'partnership actions'
     or 'council actions' only, with no implied operational, financial or regulatory commitment, and
     that this distinction be clearly shown in the Monitoring and Evaluation Framework and
     Implementation Plan.
     This Amendment was not accepted by the Chair.


     Amendment No. 12
     Moved:            Cr Amelia Lorentson
     Seconded:         Cr Jessica Phillips
     That Item J be added to read:
     J. Ensure that carrying capacity and visitor management measures apply proportionate
     targeted solutions to specific problems.
     Lost.
     For:              Cr Amelia Lorentson, Cr Jessica Phillips, Cr Frank Wilkie
     Against:          Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Nicola
                       Wilson


     The meeting adjourned at 3.34pm
     The meting resumed at 3.44pm




                                                                                              Page 10 of 141

Page 11

GENERAL COMMITTEE MEETING MINUTES                                             15 DECEMBER 2025


     Amendment No. 13
     Moved:            Cr Karen Finzel
     Seconded:         Cr Brian Stockwell
     That Item J be added to read:
     J. Endorse the establishment of a Destination Stewardship Council (DSC) as a priority action
     to support implementation of the Destination Management Plan, with its purpose to provide
     oversight, monitoring and evaluation, guidance and transparency. A Terms of Reference be
     prepared outlining the process for establishing the Destination Stewardship Council and
     report back to Council for consideration be provided as the first priority following adoption of
     the Destination Management Plan.
     Carried.
     For:              Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson, Cr Tom
                       Wegener, Cr Frank Wilkie
     Against:          Cr Jessica Phillips, Cr Nicola Wilson


     Amendment No. 14
     Moved:            Cr Amelia Lorentson
     Seconded:         Cr Karen Finzel
     That Item K be added to read:
     K. Ensure that during implementation, monitoring and review of the Noosa Destination
     Management Plan, Council officers engage with appropriate independent experts and key
     stakeholders to further refine the Plan’s strategic settings, assumptions, and delivery
     approach, ensuring it remains responsive to changing economic conditions, State policy and
     regulatory settings, market dynamics, delivery risks and emerging strategic opportunities.
     Carried.
     For:              Cr Karen Finzel, Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola
                       Wilson
     Against:          Cr Brian Stockwell, Cr Tom Wegener, Cr Frank Wilkie



     Committee Recommendation
     Moved:             Cr Frank Wilkie
     Seconded:          Cr Tom Wegener
     That Council
     A. Note the report by the Director Environment and Strategy and Manager Economic
        Development and Destination Management to the General Committee dated 15
        December 2025;
     B. Endorse the Destination Management Plan (DMP) – For the Love of Noosa - provided
        at Attachment 1;
     C. Note the Draft Implementation plan, provided at Attachment 2, to support the
        implementation of the DMP, noting this plan will be refined with input from
        partner/support organisations, reviewed and updated on and annual basis and informed
        by Council’s annual budget considerations; and
     D. Delegate authority to the CEO to make minor changes or amendments to the DMP and
        associated appendices if required prior to designing and publishing final documents on
        Council’s website.
     E. Amend the heading in the final column of the Monitoring and Evaluation Framework to
        read: "Potential Measures.”
     F. Establish a DMP Delivery Risk Register and include in the Terms of Reference for the
        Destination Stewardship Council (DSC) and report to Council annually as part of the



                                                                                              Page 11 of 141

Page 12

GENERAL COMMITTEE MEETING MINUTES                                              15 DECEMBER 2025


          annual review. The register will outline delivery risks, dependencies, resource
          constraints, and mitigation strategies.
       G. Ensure that any action likely to materially affect local business activity or the amenity of
          nearby residents including paid parking, congestion charging, one-way corridor trials or
          precinct closures, be subject to an engagement with affected sectors before Council
          decision.
       H. Amend the DMP to include a clear objective for the economic management of the visitor
          economy, supported by defined strategies, actions and measurable outcomes.
       I. Amend the DMP to include an action that proposes the development of a Council
          Advocacy and Partnership Strategy to support implementation of the plan.
       J. Endorse the establishment of a Destination Stewardship Council (DSC) as a priority
          action to support implementation of the Destination Management Plan, with its purpose
          to provide oversight, monitoring and evaluation, guidance and transparency. A Terms of
          Reference be prepared outlining the process for establishing the Destination
          Stewardship Council and report back to Council for consideration be provided as the first
          priority following adoption of the Destination Management Plan.
       K. Ensure that during implementation, monitoring and review of the Noosa Destination
          Management Plan, Council officers engage with appropriate independent experts and
          key stakeholders to further refine the Plan’s strategic settings, assumptions, and delivery
          approach, ensuring it remains responsive to changing economic conditions, State policy
          and regulatory settings, market dynamics, delivery risks and emerging strategic
          opportunities.

       Carried.
       For:              Cr Brian Stockwell, Cr Karen Finzel, Cr Tom Wegener, Cr Frank
                         Wilkie
       Against:          Cr Amelia Lorentson, Cr Jessica Phillips, Cr Nicola Wilson




9      CLOSED SESSION


9.1.              ENVIRONMENT LEVY
                  PROPOSED LAND PURCHASE (REFERRED FROM PLANNING AND
                  ENVIRONMENT COMMITTEE MEETING DATED 9 DECEMBER 2025)

                  CLOSURE OF THE MEETING TO THE PUBLIC
                  Committee Resolution
                  Moved:          Cr Jessica Phillips
                  Seconded:       Cr Karen Finzel
                  That the meeting be closed to the public pursuant to section 254J(3)(g) of the
                  Local Government Regulation 2012 for the purpose of discussing Item 9.1 -
                  Environment Levy Proposed Land Purchase
                  Carried.
                  For:            Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson,
                                   Cr Jessica Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr
                                   Nicola Wilson
                  Against:        None




                                                                                               Page 12 of 141

Page 13

GENERAL COMMITTEE MEETING MINUTES                                       15 DECEMBER 2025


               REOPENING OF THE MEETING TO THE PUBLIC
               Committee Resolution
               Moved:           Cr Frank Wilkie
               Seconded:        Cr Nicola Wilson
               That the meeting be re-opened to the public.
               Carried.
               For:             Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson,
                                Cr Jessica Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr
                                Nicola Wilson
               Against:         None


               Committee Recommendation
               Moved:            Cr Brian Stockwell
               Seconded:         Cr Amelia Lorentson
               That Council
               A. Note the report by the Coordinator Conservation and Environment to the
                  Planning & Environment Committee dated 9 December 2025; and
               B. Authorise the CEO to
                   1. Commence negotiations with the owners or their agent regarding
                      purchase of the subject property as detailed in this report;
                   2. If purchased by Council, utilise funds from Council's Environment Levy;
                   3. If purchased by Council, undertake the necessary establishment actions
                      for security and fire safety;
                   4. If purchased by Council, undertake necessary investigations and actions
                      to pursue biodiversity and carbon offsets over the property; and
                   5. Where relevant and to the satisfaction of the CEO, enter into agreements
                      and arrangements for the property to receive biodiversity and carbon
                      offsets.

               Carried.
               For:             Cr Brian Stockwell, Cr Karen Finzel, Cr Amelia Lorentson,
                                Cr Jessica Phillips, Cr Tom Wegener, Cr Frank Wilkie, Cr
                                Nicola Wilson
                Against:        None



10   MEETING CLOSURE
     The meeting closed at 5.59pm.




                                                                                       Page 13 of 141

Page 14

GENERAL COMMITTEE MEETING                                                       19 JANUARY 2026


8.1         ENDORSEMENT OF NOOSA LOCAL DISASTER MANAGEMENT PLAN
            2026


Author            Admin and Disaster Mgmt Support Officer, Sue Lowrie
                  Infrastructure Services Department
Index             ECM/Subject/Disaster Management/Local Disaster Management Plan
Attachments       1.   ATTACHMENT 1 - 2026 Local Disaster Management Plan


EXECUTIVE SUMMARY
   •    Under the Disaster Management Act 2003 (the Act), local governments are required to
        develop and regularly review a Local Disaster Management Plan (the Plan) to support
        effective disaster management within their area.
   •    The last major assessment of the Noosa Local Disaster Management Plan was undertaken
        in 2023.
   •    This review addresses amendments resulting from the machinery of government changes.
        The Plan’s format has been significantly updated to allow for easier future revisions. A
        comprehensive review will be conducted following the release of the new State Disaster
        Management Plan to ensure alignment and consistency. The updated State Plan is expected
        in the second half of 2026.
   •    This review was completed in consultation with the Emergency Management Coordinator
        and the Executive Officer to the District Disaster Management Group.
   •    The Plan was reviewed and endorsed by the Noosa Local Disaster Management Group at
        its meeting in November 2025.

RECOMMENDATION
That Council
   A. Note the report by the Disaster Management Officer to the General Committee Meeting dated
      19 January 2026
   B. Repeal the Noosa Local Disaster Management Plan 2023; and
   C. Adopt the Noosa Local Disaster Management Plan 2026 as provided at Attachment 1 to the
      Endorsement of the Noosa Local Disaster Management Plan 2026 report.


REPORT
1. Local Disaster Management Plan

In accordance with the Disaster Management Act 2003 (the Act), local governments are required to
develop and maintain a Local Disaster Management Plan (the Plan) to ensure effective disaster
management within their respective areas. The Act further stipulates that the Plan must be reviewed
or renewed as deemed appropriate.

The current review does not alter the intent or strategic direction of the Plan. Rather, it addresses
recent machinery-of-government changes and introduces a significantly updated format designed to
facilitate future revisions. This enhancement ensures improved usability and adaptability, making it
appropriate for Council to adopt the updated Plan at this time.




                                                                                              Page 14 of 141

Page 15

GENERAL COMMITTEE MEETING                                                           19 JANUARY 2026


The updated format will enable easier future amendments and ensure the Plan remains a practical
and living document that can be efficiently revised in response to legislative, structural, or operational
changes.

The Noosa Local Disaster Management Group (LDMG) endorsed the 2026 Plan (Attachment 1) at
its meeting dated 28 November 2025. It is proposed that the 2026 Plan will commence on 30 January
2026, pending Council adoption on 29 January 2026. It is noted that the next Australian Census is
scheduled for August 2026, and the State Disaster Management Plan review is anticipated to be
completed in the latter half of 2026. Following these developments, a comprehensive review of the
Local Disaster Management Plan will be undertaken to ensure alignment and consistency with
updated demographic data and State-level policy frameworks.

2. Local Disaster Management Operational Subplans

The Local Disaster Management Plan incorporates a series of operational subplans that provide
detailed guidance on specific functional and hazard-related areas. Responsibility for updating and
approving these subplans was delegated to the Local Disaster Management Group (LDMG) in
October 2023. This arrangement enables timely updates and improvements to be implemented as
required.

The Local Disaster Coordination Centre Subplan was reviewed and updated during 2025 and
subsequently endorsed by the LDMG at its ordinary meeting held on 28 November 2025.

The current suite of subplans includes:
   •   Bushfire Hazard Specific Subplan
   •   Evacuation Subplan
   •   Financial Management Subplan
   •   HAZMAT Hazard Specific Subplan
   •   Local Disaster Coordination Centre Subplan
   •   Logistics Subplan
   •   Pandemic Hazard Specific Subplan
   •   Public Health & Environment Subplan
   •   Public Information & Warnings Subplan
   •   Severe Wind & Water Inundation Hazard Specific Subplan
A systematic approach to reviewing these subplans has been adopted, with progress reported at
each LDMG meeting to ensure transparency and accountability.

3. Recent activities

A comprehensive report on disaster management activities is presented to Council for review in
September each year, with the previous report considered by Council at its 18 September
2024meeting.

In light of recent events, this report provides an opportunity to present a brief snapshot of key
activities and funding received since that time:

   a. Funding

The ongoing support provided by the State and Federal Governments is formally acknowledged and
greatly appreciated. This assistance is critical to enabling effective disaster response and recovery



                                                                                                   Page 15 of 141

Page 16

GENERAL COMMITTEE MEETING                                                        19 JANUARY 2026


for the Noosa community.

During the current year, significant funding contributions have been received, including:

   •   Tropical Cyclone Alfred – Counter Disaster Operations
        $153,000 in Counter Disaster Operations funding was provided to support immediate,
       essential activities undertaken by Council in coordinating the response to ex-TC Alfred along
       with urgent extraordinary activities (i.e. sandbagging).


   •   Western Queensland Trough
       Noosa Council was activated for this event, and the project team have lodged submissions
       to support the Reconstruction of Essential Public Assets including 11 landslides, 10 drainage
       structures, 120 gravel and asphalt roads. The program of work is forecasted at a cost of
       $53,000,000. Council is awaiting final submission acceptance from Queensland
       Reconstruction Authority.


   •   Queensland Southern Coast Severe Storms – 24–25 November 2025
       Noosa Council was activated for Counter Disaster Operations and Reconstruction of
       Essential Public Assets to urgently repair/make safe public infrastructure. As clean-up works
       continue from this event no estimate of the final cost is not yet available. These measures
       provide valuable support to impacted communities, assisting recovery and restoration efforts.
       In addition, assistance for affected communities within the Noosa local government area was
       activated under:
        o   Essential Services Safety and Reconnection Scheme
        o   Personal Hardship Assistance Scheme

  b. Resilience Activities

In 2025, the Get Ready program achieved strong community engagement to promote awareness
and preparedness. Approximately 6,000 Get Ready packs were distributed through a range of
activities, including outreach in local schools, aged care facilities, and the Get Ready Week launch
event at Bunnings Noosaville. These initiatives were delivered in collaboration with our Emergency
Services partners, ensuring a coordinated approach to building community resilience.


Link to Corporate Plan
Theme No. 4. - Future
This theme is focused on our future, strengthening our relationship with First Nations peoples and to
ensure our community is prepared and resilient to change. A focus on youth, climate resilience and
adaptation, sense of place and destination management.

Objective 4.8
Deliver best practice approaches to combat and plan for natural disasters and climate change
including supporting safety, preparedness, resilience and recovery capacity.




                                                                                              Page 16 of 141

Page 17

GENERAL COMMITTEE MEETING                                                        19 JANUARY 2026


Previous Council Consideration
Ordinary Meeting, 26 October 2023, Item 5.2
That Council note the report by the Disaster Management Officer to the Services & Organisation
Committee Meeting dated 10 October 2023 and:
   A. Repeal the Noosa Local Disaster Management Plan 2018;
   B. Adopt the Noosa Local Disaster Management Plan 2026 as provided at Attachment 1 to the
      Endorsement of the Noosa Local Disaster Management Plan 2026 report.


Finance
Regular review of the Plan will assist with ensuring effective disaster management and compliance
with legislative requirements.


Risk & Opportunities
Regular review of the Plan will assist with ensuring effective disaster management and compliance
with legislative requirements.


Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.



Consultation
External Consultation - Community & Stakeholder
Members of the Noosa Local Disaster Management Group.

Internal Consultation
Departments consulted:
    Office of the CEO, Mayor &         Community Services               Corporate Services
            Councillors
     Mayor & Councillors             Director                         Director
     Chief Executive Officer         Community Development            Financial Services
     Executive Officers              Sport & Active Lifestyles        Fleet
     Community Engagement            Arts & Culture                   Revenue Services
     People & Culture                Community Connection             ICT
     Governance                      Customer Experience              Procurement

                                                                      Commercial Property

     Strategy & Environment         Development & Regulation           Infrastructure Services
     Director                        Director                     x   Director




                                                                                                 Page 17 of 141

Page 18

GENERAL COMMITTEE MEETING                                                   19 JANUARY 2026


    Strategy & Sustainability       Development Assessment       Infrastructure Planning, Design
                                                                 and Delivery
    Economic Development        &   Local Laws                   Civil and Asset operations
    Destination Management
    Environmental Services          Environmental Health         Waste
    Innovation & Digital Hub        Building & Plumbing          Building & Facilities
                                    Property / Permits       x   Disaster Management




                                                                                              Page 18 of 141

Page 19

ATTACHMENT 1




                  Local Disaster
               Management Plan
                                                2026




                         In times of disaster
                               Stay Informed

                   disaster.noosa.qld.gov.au

                                                 Page 19 of 141

Page 20

Acknowledgement of Country ............................................................................................... 6
Administration & Governance ............................................................................................... 8
    1.1       Endorsement ........................................................................................................... 9
    1.2       Glossary of Terms ..................................................................................................10
    1.3       Document Control ..................................................................................................11
    1.4       Authority to Plan .....................................................................................................12
    1.5       Aim and Objectives ................................................................................................13
    1.6       Structure of the LDMP ............................................................................................13
    1.7       Queensland’s Disaster Management Arrangements ...............................................15
    1.8       Disaster Management Strategic Policy Statement ..................................................16
    1.9       Disaster Management Guiding Principles ...............................................................16
    1.10      IGEM Emergency Management Assurance Framework .........................................17
    1.11      Linkages to Noosa Council Corporate Plan ............................................................17
Local Disaster Management Group (LDMG) ....................................................................... 18
    2.1       Role & Responsibilities of Noosa Council ...............................................................19
    2.2       Establishment of LDMG..........................................................................................19
    2.3       Functions of the LDMG...........................................................................................20
    2.4       Business & Meetings of the LDMG .........................................................................20
    2.5       LDMG Operational Decision-Making Capability ......................................................20
    2.6       Core member & Advisory Roles and Responsibilities .............................................21
    2.7       Authority of LDMG Core Members & Advisors .........................................................25
    2.8       Authority of LDMG Core Members & Advisors ........................................................25
    2.8.1 LDMG Recovery Group & Subgroups.....................................................................25
    2.9       Training & Exercises ..............................................................................................26
    2.10      Post Event Processes ............................................................................................26
    2.11      Continuous Improvement .......................................................................................26
Community Profile ............................................................................................................... 27
    3.1       Community Profile – Noosa ....................................................................................28
    3.2       Environment ...........................................................................................................29
    3.2.1 Geography .............................................................................................................29
    3.2.2 Climate & Weather .................................................................................................29
    3.2.3 Landscape..............................................................................................................30
    3.3       Human-Social.........................................................................................................31
    3.3.1 Population ..............................................................................................................31
    3.3.2 Cultural Diversity ....................................................................................................31
    3.3.3 Families, Households & Dwellings ..........................................................................31
    3.3.4 Socioeconomic Disadvantage ................................................................................32
    3.3.5 Access to Motor Vehicles .......................................................................................32




Noosa Council 2026 | Local Disaster Management Plan                                                                    Page 2 ofPage
                                                                                                                                 73 20 of 141

Page 21

    3.3.6 Vulnerable Persons ................................................................................................32
Disaster Risk Management .................................................................................................. 34
    4.1       Risk Based Planning ..............................................................................................35
    4.2       Methodology...........................................................................................................35
    4.3       Results ...................................................................................................................36
    4.4       Residual Risks .......................................................................................................45
Prevention ............................................................................................................................ 46
    5.1       Prevention ..............................................................................................................47
    5.2       Land Use Planning .................................................................................................47
    5.3       Building Codes, Regulations & Legislation .............................................................47
    5.4       Design ....................................................................................................................47
    5.5       Hazard Reduction...................................................................................................48
    5.6       Climate Change......................................................................................................48
    5.7       Coastal Hazards Adaptation Plan ...........................................................................48
    5.8       Disaster Risk Reduction .........................................................................................48
Preparation ........................................................................................................................... 49
    6.1       LDMG Preparedness & Capacity Building ..............................................................50
    6.2       Community Preparedness & Capacity Building ......................................................50
    6.3       Noosa Emergency Action Guide.............................................................................51
    6.4       Disaster Dashboard & Noosa Alert .........................................................................51
    6.5       Insurance ...............................................................................................................52
Response ............................................................................................................................. 53
    7.1       Initial Response ......................................................................................................54
    7.2       Activation of LDMG ................................................................................................54
    7.3       Activation Criteria ...................................................................................................54
    7.4       Activation of Field Command Centre ......................................................................54
    7.5       Activation of LDMP and Sub Plans .........................................................................55
    7.6       Notification Process & Flowchart ............................................................................55
    7.7       Activation Levels ....................................................................................................56
    7.8       Response Priorities ................................................................................................57
    7.9       Response Principles ...............................................................................................57
    7.10      Disaster Declaration ...............................................................................................57
    7.11      Guardian Information Management System ...........................................................58
    7.12      Activation of the Local Disaster Coordination Centre ..............................................58
Recovery ............................................................................................................................. 60
    8.1       Definition of Recovery ............................................................................................61
    8.2       Context for Recovery ..............................................................................................61
    8.3       Appointment of Local Recovery Coordinator ..........................................................61




Noosa Council 2026 | Local Disaster Management Plan                                                                        Page 3 ofPage
                                                                                                                                     73 21 of 141

Page 22

   8.4    Activation of LDMG Recovery Group ......................................................................62
   8.5    LDMG Recovery Group Chairperson ......................................................................62
   8.6    Recovery Group Membership .................................................................................64
   8.7    Functional Lines of Recovery .................................................................................65
   8.8    Recovery Subgroups ..............................................................................................66
   8.9    Proposed Recovery Subgroup Membership ...........................................................67
   8.10   National Principles..................................................................................................68
   8.11   Queensland Government Roles and Responsibilities .............................................68
   8.12   Recovery Phases ...................................................................................................69
   8.13   Monitoring & Evaluating Framework .......................................................................71
   8.14   Communication & Reporting ...................................................................................71
   8.15   Finance ..................................................................................................................71
   8.16   Event Specific Recovery Plan.................................................................................71
   8.17   Recovery Hubs .......................................................................................................72




Noosa Council 2026 | Local Disaster Management Plan                                                                   Page 4 ofPage
                                                                                                                                73 22 of 141

Page 23

About this Plan




Noosa Council 2026 | Local Disaster Management Plan   Page 5 ofPage
                                                                73 23 of 141

About this Plan

Page 24

 of Country
 Acknowledgement of Country


 Noosa Council respectfully acknowledges the Kabi Kabi / Gubbi
 Gubbi People, traditional custodians of the lands and waters that
 from the region we call Noosa. Council pays respects to elders’
 past, present and future and welcomes the ongoing role that
 Indigenous people play within the Noosa community.




Noosa Council 2026 | Local Disaster Management Plan   Page 6 of 73

                                                                     Page 24 of 141

Page 25

Foreword
                                                            Queenslanders are faced with responding to and recovering
                                                            from disasters that test both individual and community
                                                            resilience year after year. Cyclones, floods, fires and other
                                                            natural hazard events don’t respect local government
                                                            boundaries and adequate warning time is not always
                                                            available. No community is immune from disasters and their
                                                            potential to significantly disrupt social, economic and
                                                            environmental systems as well as our infrastructure,
                                                            highlights the need to be well prepared and have strong,
                                                            coordinated disaster management arrangements in place.

                                                            In Queensland, each local government is primarily
                                                             responsible for managing disaster events within its
                                                             boundaries. This Local Disaster Management Plan (LDMP)
                                                             has been developed by the Noosa Local Disaster
                                                             Management Group (LDMG) on behalf of Noosa Council
                                                             with the core focus to protect our community – preserving life,
 Mayor Frank Wilkie                                          preventing injury, reducing property damage and
 Chair, Noosa Local Disaster Management                      safeguarding our environment.
 Group
This plan has two key objectives. First, to provide a clear, practical disaster management guide tailored to the Noosa
community. It outlines the regions demographics, infrastructure and hazards and risks of the coastal and hinterland
areas to support local prevention preparedness, response, and recovery efforts. Second, it ensures that Noosa Council
meets its legislative responsibilities under the Disaster Management Act 2003 and the Disaster Management
Regulation 2014.

Disaster resilience is a shared responsibility. No single organisation, community, or level of government can
manage the full impact of a disaster alone. Everyone has a role to play.

As residents, we need to take ownership – talking with family, friends, and colleagues about emergency plans,
preparing emergency kits, managing vegetation and drainage around our properties, and staying informed. Effective
disaster management depends on a collaboration between individuals, families, communities, businesses, and all
levels of government.

This LDMP takes an all-hazards approach and is built on the prevention preparation, response and recovery
(PPRR) framework.

It provides a robust, multi-agency structure to ensure a coordinated response to disaster events and a swift return to
a safe and secure environment after the event. It’s a dynamic, risk-based document that is subject to continuous
reviewed to reflect current legislation, local risks, demographics, and lessons learned from past events – both within
and beyond our region.

With climate change expected to intensify the severity of natural disasters, it’s more important than ever for Noosa to
be resilient and ready. Whatever the future holds, it’s wise to prepare for the worst and hope for the best.

I want to acknowledge and thank the volunteers, emergency services personnel and Council staff who work tirelessly
through all phases of disaster management. Their dedication is vital to the success of this LDMP.

And to the community, thank you for your ongoing support, strength and resilience. We’re in this together.




      Noosa Council 2026 | Local Disaster Management Plan                                            Page 7 ofPage
                                                                                                               73 25 of 141

Page 26

Administration
& Governance




                                                      SECTION ONE
Noosa Council 2026 | Local Disaster Management Plan        Page 8 of 73
                                                                   Page 26 of 141

Page 27

Section 1.1
1.1     Endorsement
This Local Disaster Management Plan was endorsed by the Noosa Local Disaster Management Group on 28
November 2025 and recommended for adoption by Noosa Council.




Mayor Frank Wilkie
Chair, Noosa Local Disaster Management Group
Date:




In accordance with a resolution on <       > this Local Disaster Management Plan was adopted and is endorsed
for distribution by Noosa Council.




Larry Sengstock
Chief Executive Officer
Noosa Council
Date:




Noosa Council 2025 | Local Disaster Management Plan                               Page 9 of 73   Page 27 of 141

Page 28

Section 1.2
1.2    Glossary of Terms
A Disaster Management glossary of terms and acronyms is published as part of the Prevention, Preparedness,
Response and Recovery Disaster Management Guideline.
Disaster Management Lexicon is also provided by the Office of the Inspector General Emergency Management
(IGEM).
The following acronyms and initialisms are not contained in the links above but are used by Noosa Council is
their disaster management arrangements:
Acronyms & Initialisms – Table 1

 Acronym / initialism      Meaning
 AEMI                      Australian Emergency Management Institute
 AIIMS                     Australasian Inter-service Incident Management System
 CDO                       Counter Disaster Operations
 DRFA                      Disaster Recovery Funding Arrangements (formerly known as NDRRA)
 EAP                       (Dam) Emergency Action Plan
 GIS                       Geographic Information System
 IMT                       Incident Management Team
 LGA                       Local Government Area
 QDMA                      Queensland Disaster Management Arrangements
 RFB                       Rural Fire Brigade – QFD
 RFS                       Rural Fire Service – QFD
 SCHHS                     Sunshine Coast Hospital and Health Service
 SMEACS                    Situation, Mission, Execution, Administration, Coordination, Safety
 IGEM                      Inspector General Emergency Management




Noosa Council 2025 | Local Disaster Management Plan                             Page 10 of 73    Page 28 of 141

Page 29

Section 1.3
1.3    Document Control
1.3.1 Amendment Control
This LDMG is a controlled document. The controlled copy is held by the LDMG Local Disaster Coordinator
(LDC). The LDC may approve inconsequential amendments to the LDMP. Any changes to the intent of the
document must be endorsed by the LDMG and adopted by Noosa Council. The plan is intended to be a ‘live’
document. All suggested amendments should be forwarded to:
Disaster Management Officer
Noosa Council
PO Box 141
Tewantin, QLD 4565
Email: [email protected]


1.3.2 Record of Amendments
Issue Date         Version                            Outline of Revisions   Prepared By
19/10/2017         Noosa LDMP 2018                    V1 adopted by Noosa
                                                      Council
26/10/2023         Noosa LDMP 2023                    V2 adopted by Noosa
                                                      Council
                   Noosa LDMP 2025                    V3 adopted by Noosa    Disaster Management Officer
                                                      Council


1.3.3 Review Requirements
Noosa Council must review the effectiveness of this LDMP at least once a year. In addition, Noosa Council may
review or renew the Plan whenever they consider it appropriate. The LDMP and associated Sub Plans will be
reviewed following any activation of the plans or following any exercises to test the effectiveness of the plans.
This LDMP will be subject to the external annual assessment process developed by the Office of the IGEM in
accordance with section 16C(b) of the Disaster Management Act 2003 (the Act).

1.3.4 Distribution
The level of circulation of the LDMP and all Sub Plans will be determined by the LDMG. As a minimum this will
include all core members and advisors of the LDMG and the District Disaster Coordinator (DDC). Other key
stakeholders will be determined by Noosa Council.
In accordance with section 60 of the Act, the LDMMP is available to the public on the Noosa Council website.
Alternatively hard copies may be view at Noosa Council Customer Service Centres and Libraries.




Noosa Council 2025 | Local Disaster Management Plan                                  Page 11 of 73   Page 29 of 141

Page 30

Section 1.4
1.4     Authority to Plan
The Disaster Management Act 2003 (the Act) and the Disaster Management Regulation 2014 (the
Regulation) forms the legislative basis for disaster management within all levels of government and
Queensland’s Disaster Management Arrangements (QDMA).
The preparation of this LDMP and all associated Sub Plans has been undertaken in accordance with sections
57 and 58 of the Act, to provide for effective disaster management in the Noosa Council area.
This LDMP is consistent with Queensland’s Disaster Management Standard and PPRR Disaster Management
Guideline.
The authorising environment for disaster management documents is detailed in Figure 1 below.




                            Figure 1: Disaster Management Authorising Environment




        Noosa Council 2025 | Local Disaster Management Plan                            Page 12 ofPage
                                                                                                  73 30 of 141

Page 31

Section 1.5
1.5     Aim and Objectives
The overall aim of this LDMP is to detail the arrangements that prevent, where possible, or minimise the impact
of disasters or major emergencies, on communities of the Noosa Council area. The primary focus is to preserve
life and ensure the safety and welfare of our community as well as other people who may work in, or visit, our
region. The key objectives are to:

   •   Provide a framework for the implementation of effective disaster management strategies and
       arrangements across the four phases of PPRR within the Noosa Council area.
   •   Describe the disaster management structure for the LDMG, the member organisations and their role and
       responsibilities for the coordination of multi-agency responses.
   •   Understand the likely effects of natural and non-natural hazards that may impact the community,
       infrastructure, economy and environment of the area.
   •   Plan for those hazards to preserve human life, protect critical infrastructure and property, protect
       livelihoods and the economy and safeguard the environment.
   •   Provide practical information to build community resilience and better assist the community in preparing
       for, responding to and recovering from disaster events.



Section 1.6
1.6     Structure of the LDMP
1.6.1 LDMP
The LDMP is an overarching document that details the structure, management arrangements and governance
provisions which underpin the process of disaster management in the Noosa Council area. It provides an
overview of the arrangements in place for dealing with disasters and sets out the role of the LDMG and the
community from the initial notification through the various stages of response and recovery until the disaster
event is finalised. The LDMP is designed to be flexible so it can be adapted to any disaster event affecting the
region to ensure an integrated, coordinated and timely response.

1.6.2 LDMP Sub Plans
The LDMP is complemented by a number of Sub Plans which are designed to expand on information contained
in the LDMP by providing detailed information for the activation and operation of key capabilities. Sub Plans are
designed to integrate seamlessly with the LDMP but can be used on a stand-alone basis as required. The
following Sub Plans exist:

   •   Activation of the Local Disaster Coordination Centre (LDCC)
   •   Bushfire
   •   Financial Management
   •   Public Information & Warnings
   •   Logistics
   •   Evacuation
   •   Public Health and Environment.
   •   Hazardous Materials
   •   Severe Wind & Water Inundation

1.6.3 Hazard Specific Plans
Hazard specific disaster plans are developed by assigned lead agencies to address particular hazards.
Examples of hazard specific plans for the LDMG include:

   •   Lake MacDonald Dam Emergency Action Plan (EAP)
   •   Pandemic Plan



        Noosa Council 2025 | Local Disaster Management Plan                                Page 13 ofPage
                                                                                                      73 31 of 141

Page 32

In addition, Hazard-Specific Plans have been developed to address particular hazards that may occur within,
or directly impact, the Noosa Shire. These plans outline the disaster management arrangements designed to
support an effective response and reduce the potential consequences of each identified hazard. The Hazard-
Specific Plans include:
    • Bushfire
    • Hazardous Materials
    • Severe Wind & Water Inundation

1.6.4 Community Plans
Various community organisations, local business groups and others have a responsibility to prepare disaster,
emergency and business continuity plans and strategies for particular high-risk localities and demographic
groups within the Noosa Shire.
A community profile has been developed for each suburb of Noosa identifying the demographics, hazards and
critical infrastructure specific to each community.
Some communities such as Noosa North Shore, Pomona, Boreen Point and Kin Kin that may become isolated
during flood or fire events have specific community disaster plans for their locality that are developed by the
community with guidance and approved by the Noosa LDMG. The LDMG also works with organisations that
care for vulnerable sectors of the community and with tourism operators and businesses to ensure that visitors
to the region are well informed in the event of a disaster.

1.6.5 Operational Plans
Operational plans are plans developed and utilised during the response and recovery phases. Examples
include the Event Action Plan and event-specific Recovery Plan.

1.6.6 Business Continuity Plans (BCPs)
Each member and advisory agency of the LDMG is responsible for maintaining an effective BCP. This will
ensure they can continue their critical service functions in the event of a disaster to provide coordination and
emergency support to the local community.




         Noosa Council 2025 | Local Disaster Management Plan                                 Page 14 ofPage
                                                                                                        73 32 of 141

Page 33

Section 1.7
1.7 Queensland’s Disaster Management Arrangements
QDMA is based on a tiered system of committees at local government, disaster district, and state government
levels and recognises that the Commonwealth Government may be requested to provide support to the State.
Local level capability is recognised as the frontline of disaster management. Local government has primary
responsibility for managing events in their local government area. This is achieved through the establishment of
the Local Disaster Management Group (LDMG) – refer Section 3. Noosa Council is ideally suited to manage
disaster events at the community level, based on its understanding of local social, environmental and economic
issues, and knowledge of the region’s infrastructure. During a disaster, local government provides initial support
to the affected community until its resources are fully committed. Additional support from the State, and
ultimately the Commonwealth is then requested if needed.




                        Figure 2: Queensland Disaster Management Arrangements




        Noosa Council 2025 | Local Disaster Management Plan                                 Page 15 ofPage
                                                                                                       73 33 of 141

Page 34

Section 1.8
1.8     Disaster Management Strategic Policy Statement
This plan is consistent with the Disaster Management Strategic Policy Statement which informs the
Queensland Government’s strategic approach to keeping people safe and making communities more resilient to
disaster risks and impacts.
The LDMG takes a flexible and scalable approach to disaster management which provides for the reduction of
risk and the enhancement of community resilience whilst ensuring effective response and recovery capabilities.




Section 1.9
1.9     Disaster Management Guiding Principles
In accordance with section 4A(b) of the Act, all events, whether natural or caused by human activity, should be
managed in accordance with the Strategic Policy Statement and the State Disaster Management Plan
(SDMP) and any relevant disaster management guidelines. The Act identifies four key principles which guide
disaster management in Queensland:



1.9.1 Comprehensive Approach
The comprehensive approach to disaster management comprises the four PPRR phases. This approach
ensures a balance between the reduction of risk and the enhancement of community resilience, while ensuring
effective response and recovery capabilities.
The four phases of PPRR are not linear, nor are they independent of the others. They overlap and support each
other as shown in Figure 3. For example, recovery activities are likely to begin during the response phase and
mitigation strategies may be considered during the recovery phase.




                          Figure 3: Comprehensive Approach to Disaster Management




        Noosa Council 2025 | Local Disaster Management Plan                               Page 16 ofPage
                                                                                                     73 34 of 141

Page 35

Section 1.9
1.9.2 All-Hazards Approach
The all-hazards approach assumes that the functions and activities used to manage one event are likely to be
applicable to a range of events, whether natural or caused by human activity.



1.9.3 Local Disaster Management Capability
Local level capability is recognised as the frontline for disaster management, primarily due to the benefits of
localised knowledge and networks.



1.9.4 Support by District and State Groups
The Act establishes a District Disaster Management Group (DDMG) for each of the 23 districts in Queensland,
to provide support when required or requested by a LDMG. The Noosa LDMG is located in the Sunshine Coast
Disaster District. A District Disaster Management Plan is available.


The Queensland Disaster Management Committee (QDMC) can provide additional support and assistance
when required or requested by a DDMG. The State Disaster Management Plan (SDMP) provides a framework
for response and recovery operations.



Section 1.10
1.10     IGEM Emergency Management Assurance Framework
Part 1A of the Act establishes the IGEM and Office of the IGEM. The priority for the Office of the IGEM is to
facilitate improvements to Queensland’s disaster management arrangements to enable confidence in the
system and enhance public safety outcomes. The functions of the Office of the IGEM are detailed in section 16C
of the Act.
The Emergency Management Assurance Framework (EMAF), developed by the Office of the IGEM, in
partnership with disaster management practitioners, provides the foundation for guiding and supporting the
continuous improvement of entities’ programs across all phases of disaster management. The EMAF is
underpinned by four supporting principles:

   •   Leadership
   •   Public Safety
   •   Partnership
   •   Performance
The EMAF also provides the structure and mechanism for reviewing and assessing the effectiveness of disaster
management arrangements. The EMAF comprises Principles, the Standard for Disaster Management in
Queensland (the Standard) and Assurance Activities.

Section 1.11
1.11     Linkages to Noosa Council Corporate Plan
Strategic linkages to Disaster Management are included in the Noosa Council Corporate Plan 2023-2038
under Theme 2: The Noosa Community which indicates the key focus area for 2017- 22 is to maintain the ability
to respond to disaster events (LDMP). The 20-year goal is for Council and the Noosa community to be resilient
in the face of emergencies and disaster events.




         Noosa Council 2025 | Local Disaster Management Plan                                Page 17 ofPage
                                                                                                       73 35 of 141

Page 36

Local Disaster
Management
Group (LDMG)




                                                       SECTION TWO

 Noosa Council 2025 | Local Disaster Management Plan        Page 18 ofPage
                                                                       73 36 of 141

Page 37

Section 2.1
2.1      Role & Responsibilities of Noosa Council
The Act details a range of functions and responsibilities for local government to ensure that it meets its statutory
obligations.
Section 80 of the Act requires local government to undertake the following functions:

   •   To ensure it has a disaster response capability
   •   To approve its LDMP
   •   To ensure information about an event or a disaster in its area is promptly given to the DDC for the district
       in which its area is situated
   •   To perform other functions given to the local government under the Act.
In accordance with section 80 of the Act, a ‘disaster response capability’ for local government means the ability
to provide equipment and a suitable number of persons, using the resources available, to effectively manage or
help another entity to manage an emergency situation or a disaster in the local government area. To ensure this
can be achieved, all Noosa Council services have designated responsibilities in disaster management which
reflect their legislated and / or technical capability.
In addition to these functions, section 29 of the Act specifies that local government must establish a LDMG for
the local government’s area.



Section 2.2
2.2      Establishment of LDMG
LDMGs are established under section 29 of the Act by local governments to support and coordinate disaster
management activities for their respective LGAs. A Terms of Reference is available. LDMG responsibilities are
outlined in Manual M.1.030.




         Noosa Council 2025 | Local Disaster Management Plan                                 Page 19 ofPage
                                                                                                        73 37 of 141

Page 38

Section 2.3
2.3       Functions of the LDMG
The following functions of the LDMG are prescribed under section 30 of the Act:

      •   To ensure that disaster management and disaster operations in the area are consistent with the State
          group’s strategic policy framework for disaster management for the State.
      •   To develop effective disaster management, and regularly review and assess the disaster management
          plan.
      •   To help the local government for its area to prepare a local disaster management plan.
      •   To identify, and provide advice to the relevant district group about, support serv ices required by the
          local group to facilitate disaster management and disaster operations in the area.
      •   To ensure the community is aware of ways of mitigating the adverse effects of an event, and preparing
          for, responding to and recovering from a disaster.
      •   To manage disaster operations in the area under policies and procedures decided by the State Group.
      •   To provide and make recommendations to the relevant district group about matters relating to disaster
          operations.
      •   To identify, and coordinate the use of, resources that may be used for disaster operations in the area.
      •   To establish and review communications systems in the group, and with the relevant district group and
          other local groups in the disaster district of the relevant district group, for use when a disaster happens.
      •   To ensure information about a disaster in the area is promptly given to the relevant district group.
      •   To perform other functions given to the group under the Act.
      •   To perform a function incidental to a function mentioned in paragraphs in the points listed above.


Section 2.4
2.4       Business & Meetings of the LDMG
In accordance with section 38 of the Act, the LDMG will conduct its business, including meetings as prescribed
by the Regulation. Ordinary meetings are scheduled every three (3) months and extraordinary meetings are
convened as required. Quorum (50% +1 of membership) must be achieved for decisions of the LDMG to be
valid.



Section 2.5
2.5       LDMG Operational Decision-Making Capability
The LDMG Chair and LDC are authorised to make initial operational response coordination decisions on behalf
of the full LDMG to initiate the disaster management arrangements and whilst acting in accordance with LDMG
approved plans and procedures. In the absence of the LDMG Chair, the Deputy Chair has clear authority to
make initial operational response decisions.
The Chair and LDC have an exclusively operational response coordination function, which will not, at any time,
replace the policy decision-making role of the core LDMG members.




          Noosa Council 2025 | Local Disaster Management Plan                                  Page 20 ofPage
                                                                                                          73 38 of 141

Page 39

 Section 2.6
 2.6 Core member & Advisory Roles and Responsibilities
 The following table details the membership and responsibilities of the LDMG as appointed in accordance with Sections 33 and 34 of the Act. All members have
 the necessary expertise or experience to assist the group undertake and meet its legislative requirements. Membership of the group includes any person acting in
 the capacity of an appointed member using a DM13 form. All members will nominate one or more deputies in advance to ensure continuity and full agency
 representation. When membership changes, notice is provided to the DDMG. If membership of the Chair or LDC changes, notice is to be provided to the SDCC.
 Membership and contact details for each member is maintained in the restricted LDMG Emergency Contact List in Guardian IMS.

  Agency                 Position                       Status    Responsibilities
                         LDMG Chair – Mayor             Member    •   Chair LDMG meetings and to provide the primary link between the LDMG and Council
                                                                  •   To manage and coordinate the business of the group, to ensure, as far as practicable, that the
                                                                      group performs, its functions, to report regularly to the relevant district group, and the chief
                                                                      executive of the department, about the performance by the LDMG of its functions.
                         LDMG Deputy Chair –            Member    •   Provide advice and support to the Chair and LDMG
                         Councillor                               •   Chair LDMG Meetings in the absence of the Chair
  Noosa Council                                                   •   Provide a link between the LDMG and Council
                                                                  •   Chair the LDMG Recovery Group.
                         Local Disaster Coordinator –   Member    •   Coordinate disaster operations for the LDMG, report regularly to the LDMG about disaster
                         Director Infrastructure                      operations, to ensure, as far as practicable, that any strategic decisions of the LDMG about
                         Services                                     disaster operations are implemented.
                                                                  •   Provide advice and support to the Chair and LDMG
                                                                  •   Activate the LDMP and LDCC when required.
                                                                  •   Represent Noosa LDMG at the Sunshine Coast DDMG.
                         Deputy Local Disaster          Member    •   To undertake the functions of the LDC in the LDC’s absence.
                         Coordinator – Civil &                    •   Provide advice and support to the Chair, LDC and LDMG.
                         Asset Operations Manager
                         Local Recovery                 Member    •   To undertake the functions of the LRC
                         Coordinator - Director                   •   Lead and coordinate recovery operations reporting regularly to the Local Recovery Group about
                         Community Services                           recovery operations, to ensure, as far as practicable, that any strategic decisions of the LDMG
                                                                      about recovery operations are implemented
                                                                  •   Provide advice and support to the Chair and LDMG.
                                                                  •   To activate the Recovery Group and develop an event specific recovery plan when required.
                         Chief Executive Officer        Advisor   •   Provide a link between the LDMG and Council
                         (CEO)
                         Disaster Management            Advisor   •   Support to the LDC & Chair
                         Officer (DMO)
                         Disaster & Disruption          Advisor   •   Support to the LDC & Chair
                         Resilience Officer


Noosa Council 2025 | Local Disaster Management Plan                               Page 21 of 73
                                                                                                                                                                Page 39 of 141

Page 40

  Agency                 Position                       Status    Responsibilities
                         Executive and Business         Advisor   •   Support to the DMO, DRRO, LDC & Chair
                         Support Officer
                         Bushfire Management –          Advisor   •   Fire management support in relation to Council properties to the LDMG
                         Senior Fire Management
                         Officer
                         Evacuation Centres – Noosa     Advisor   •   Operation of evacuation centres.
                         Leisure Centre Coordinator
                         Public Information Officer –   Advisor   •   Preparation and dissemination of public information and warnings during an event
                         Communications &                         •   Responsibilities identified in Public Information and Warnings Plan.
                         Community Engagement
                         Manager
                         Coordination / Emergency       Advisor   •   Response and recovery of Council operational assets
                         Operations Team – Civil
                         Assets Operations Manager
                         Customer Experience            Advisor   •   Customer Service during activation for response and recovery.
                         Manager
                         Community Health Officer –     Advisor   •   Community health during activation for response and recovery.
                         Waste &
                         Environmental Health
                         Manager
                         Information Technology –       Advisor   •   IT support to the LDMG
                         ICT Manager
                         Sustainability & Climate       Advisor   •   Climate Change support to the LDMG
                         Change Coordinator
                         Waste Manager                  Advisor   •   Waste activities during activation for response and recovery.

   Queensland            Officer in Charge (Noosa)      Member    •   Refer to Appendix B of the State Disaster Management Plan
   Ambulance Service                                              •   Liaison between the agency and the LDMG.
   (QAS)
   Queensland Fire       Inspector, Operations          Member    •   Refer to Appendix B of the State Disaster Management Plan
   Department (QFD)      Management & Business                    •   Liaison between the agency and the LDMG.
                         Support Sunshine Coast
                         Inspector/Area Commander       Member
                         (Noosa Command)

   Queensland Police     Officer in Charge (Noosa)      Member    •   Refer to Appendix B of the State Disaster Management Plan
   Service (QPS)
                         District Disaster              Member    •   Liaison between the DDMG and the LDMG
                         Management Group                         •   Provide advice and support to the Chair and LDMG
                         (DDMG) – Executive Officer
                         Local Controller SES           Member    •   Liaison between the agency and the LDMG.
                         (Noosa)

Noosa Council 2025 | Local Disaster Management Plan                               Page 22 of 73
                                                                                                                                                         Page 40 of 141

Page 41

  Agency                 Position                      Status    Responsibilities
                         Emergency Management          Member    •   Liaison between agency and the LDMG
                         Coordinator (EMC)
   Queensland            Department of Local           Member    •   Refer to Appendix B of the State Disaster Management Plan
   Government            Government, Water &                     •
   Departments           Volunteers
                         Department of Environment     Member    •   Refer to Appendix B of the State Disaster Management Plan
                         & Science (QPWS) – Senior               •   Liaison between agency and the LDMG.
                         Ranger
                         Department of Education &     Advisor   •   Refer to Appendix B of the State Disaster Management Plan
                         Training                                •   Liaison between agency and the LDMG.
                         Department of Health –        Member    •   Liaison between agency and the LDMG
                         Disaster Management Team
                         Sunshine Coast Health
                         Department of Transport &     Advisor   •   Refer to Appendix B of the State Disaster Management Plan
                         Main Roads                              •   Liaison between agency and the LDMG.
                         – Manager (Environment
                         Sustainability & Heritage)
                         Department of Transport &     Advisor   •   Liaison between agency and the LDMG
                         Main Roads – Maritime
                         Safety Queensland
                         Queensland Reconstruction     Advisor   •   Refer to Appendix B of the State Disaster Management Plan
                         Authority (QRA)                         •   Liaison between agency and the LDMG.
   Australian Red                                      Advisor   •   Liaison between the agency and the LDMG.
   Cross                                                         •   Liaison in relation to evacuation centres, community support, recovery and other Red Cross
                                                                     services.
   Energex               Network Performance Officer   Member    •   Primary agency for providing, maintaining and restoring power supplies
                         (Sunshine Coast)                        •   Provide advice to the LDMG on power supply issues
                                                                 •   Provide safety information to consumers
                                                                 •   Liaison between the agency and the LDMG.
   CoastGuard                                          Advisor   •   Liaison between the agency and the LDMG.

   Country to Coast      Senior Manager Climate        Advisor   •   Liaison between the agency and the LDMG and Recovery Group
                         Ready Communities
   Kabi Kabi Rangers     Ranger Coordinator            Advisor   •   Liaison between the agency and the LDMG.

   National              Assistant Director,           Advisor   •   Liaison between the agency and the LDMG.
   Emergency             Coordination and Planning
   Management            Qld
   Agency
   NBN Local                                           Advisor   •   Liaison between the agency and the LDMG.


Noosa Council 2025 | Local Disaster Management Plan                              Page 23 of 73
                                                                                                                                                            Page 41 of 141

Page 42

  Agency                 Position                     Status    Responsibilities
   Ramsey Health         Noosa Hospital - Director    Advisor   •   Liaison between agency and the LDMG.
   Care                  Emergency Medicine
   Rescue Medics                                      Advisor   •   Liaison between agency and the LDMG
   Australia
   Rural Fire Service                                 Advisor   •   Liaison between agency and the LDMG.

   SeqWater              Coordinator Incident &       Advisor   •   Refer to Appendix B of the State Disaster Management Plan
                         Security Management                    •   Primary agency for sourcing, treating and supplying bulk drinking water.
                                                                •   Liaison between the agency and the LDMG in relation to Lake MacDonald Dam.
   State MP              Local Member of Parliament   Advisor   •   People’s representative

   Sunshine Coast        Disaster Management          Advisor   •   Liaison between the agency and the LDMG.
   Council               Coordinator
   Surf Lifesaving       Regional Manager             Advisor   •   Refer to Appendix B of the State Disaster Management Plan
   Queensland                                                   •   Liaison between agency and the LDMG.
   Tourism Noosa         General Manager              Advisor   •   Industry advisor

   Unitywater            Planned Services Manager     Advisor   •   Liaison between the agency and the LDMG in relation to water supply and sewage treatment
                                                                    services.
   Volunteer             Commander (Noosa)            Advisor   •   Liaison between the agency and the LDMG.
   Coastguard                                                   •   Liaison in relation to marine search and rescue and other volunteer coastguard support.
   Wireless Institute    Volunteer Representative     Advisor   •   Liaison between the agency and the LDMG in relation to emergency radio communications.
   Civil Emergency
   Network (WICEN)
   Visit Sunshine        Communications Manager       Advisor   •   Liaison between the agency and the LDMG.
   Coast




Noosa Council 2025 | Local Disaster Management Plan                            Page 24 of 73
                                                                                                                                                       Page 42 of 141

Page 43

Section 2.7
2.7    Authority of LDMG Core Members & Advisors
The core members and advisors of the LDMG should have:

   •   The authority to commit their respective organisation to the LDMG’s decisions
   •   The ability to effectively navigate their respective organisations to seek approval for the commitment of
       their organisation resources
   •   A sound understanding of the QDMA and this LDMP.
   •   Only member votes count towards quorum.



Section 2.8
2.8    Authority of LDMG Core Members & Advisors
The structure of the Noosa LDMG is depicted below. The Chair of the LDMG may establish additional temporary
or permanent subgroups to manage the business of the LDMG.



                                                                                Noosa Local Disaster
            LDMG Recovery Group                                               Management Group (LDMG)




            Human-Social               Economic             Environmental             Infrastructure
          Recovery Subgroup        Recovery Subgroup      Recovery Subgroup         Recovery Subgroup




                                       Figure 4: Structure of the Noosa LDMG



2.8.1 LDMG Recovery Group & Subgroups
A single overarching Recovery Group may be formed. Alternatively, the LDMG Recovery Group may decide to
activate one or more of its Recovery Subgroups as follows:
Human-Social Recovery Subgroup
The key function is to address the human-social recovery aspects of a disaster. In Noosa, this is achieved
through the Northern Social Services Network. A Terms of Reference is available.
Economic Subgroup
The key function is to address the economic recovery aspects of a disaster. A Terms of Reference is available.
Environmental Recovery Subgroup
The key function is to address the environmental recovery aspects of a disaster. A Terms of Reference is
available.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 25 of 73       Page 43 of 141

Page 44

Infrastructure Recovery Subgroup
The key function is to address the infrastructure recovery aspects of a disaster. A Terms of Reference is
available.



Section 2.9
2.9    Training & Exercises
In an effort to provide an effective training program, the LDMG works closely with QPS to provide a coordinated
program of training from the Queensland Disaster Management Training Framework (QDMTF).
The QDMTF outlines the core training courses and inductions relevant to the key disaster management
stakeholders to support the effective performance of their role. Exercises will be used to help review the
effectiveness of the LDMP. Exercises can take many forms from simple discussion type exercises to full scale
functional operations.



Section 2.10
2.10 Post Event Processes
Following any exercise or disaster event that impacts the region, a post disaster assessment will be undertaken
by the LDMG. This assessment will consist of “hot” and “post event” debriefs and will culminate in the
development of a post event assessment report. This report should clearly articulate any actions, processes,
equipment, or systems that worked well during an event as well as suggest recommendations for improvement.
Recommendations for improvements identified in post event assessment reports will be tabled for discussion by
the LDMG. Any issue that is identified and not able to be resolved at a local level, will need to be referred to the
Sunshine Coast District Disaster Management Group for advice or resolution. All post disaster review reports
will be forwarded to the DDC as part of standard operating procedure.



Section 2.11
2.11 Continuous Improvement
The LDMG is committed to the practice of continuous improvement which involves disaster management
processes and arrangements being regularly evaluated and improved to ensure they remain relevant, efficient,
effective, and flexible.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 26 of 73     Page 44 of 141

Page 45

        Community
        Profile




                                                      SECTION THREE

Noosa Council 2025 | Local Disaster Management Plan       Page 27 of 73   Page 45 of 141

Page 46

Section 3.1
3.1    Community Profile – Noosa
This section provides an understanding of the community profile which is critical for managing disaster risks.
Understanding of community profile along with natural hazard risks enhances the development of robust
disaster management plans, helping to reduce the impact of disasters on the community.




                                            Figure 6: Noosa Shire Topography




Noosa Council 2025 | Local Disaster Management Plan                                Page 28 of 73    Page 46 of 141

Page 47

Section 3.2
3.2    Environment
3.2.1 Geography
Noosa Shire is in south-east Queensland, approximately 120 kilometres north of the Brisbane CBD.
Noosa Shire is bounded by the Gympie Regional Council area in the north and west, the Coral Sea in the east,
and the Sunshine Coast Council area in the south.
The Noosa Council local government area (LGA) encompasses a total land area of 869.9 km2.
Noosa Council’s office is located at 9 Pelican Street, Tewantin.



3.2.2 Climate & Weather
The region has a mild sub-tropical coastal climate. Temperatures in summer averages a minimum of 17°C and
a maximum of 28°C and in winter from 7°C through to a maximum of 22°C. The highest summer temperature
of 38.7°C was recorded in 2002 and 2008, and the lowest winter temperature of minus 2.8°C was recorded at
Tewantin in 1901. The recorded rainfall average on the coast is approximately 1610 mm per annum and the
highest rainfall occurs from December to May.




                                    Figure 6: Noosa Shire Map




Noosa Council 2025 | Local Disaster Management Plan                           Page 29 of 73    Page 47 of 141

Page 48

Section 3.2
3.2.3 Landscape
Noosa Shire encompasses a range of landscape types including beaches, sand dunes, river systems,
wetlands, heath plains, woodlands, rainforests and ranges.
The Noosa River and its tributaries flow to the east and the Mary River and its tributaries including Six Mile
Creek flow to the north.
Much of the native vegetation of the region has been removed or greatly modified, and the main forms of native
vegetation that remain include tall open eucalypt forests along the western borders and remnants of melaleuca
forest and open heaths along the coast.
Some 28,655 hectares of the Noosa Shire is considered to have outstanding environmental, biodiversity and
natural history values and is managed primarily for conservation. This constitutes almost one third of the
Noosa local government area. A further 30,653 hectares of land is predominantly undeveloped and sustainably
managed through voluntary agreements such as Land for Wildlife. There are 267.6km2 of protected parks,
forests and reserves within the Noosa Shire.




                                  Figure 7: River Catchments in Noosa LGA




Noosa Council 2025 | Local Disaster Management Plan                                Page 30 of 73     Page 48 of 141

Page 49

Section 3.3
3.3    Human-Social
3.3.1 Population
The 2021 Census determined the resident population of the Noosa Council LGA is 56,298 with a density of
65.13 people per square metre. Population growth assumptions indicate the population could grow to 64,999
people by 2041.
Some 60% of the Shire’s population lives in the coastal urban communities of the south-eastern corner of the
Shire, between Peregian Beach and Tewantin. The largest hinterland towns are Cooroy, Pomona and Cooran
which are located along the railway corridor.
Other centres of population are Boreen Point, Federal and Kin Kin and smaller clusters of rural residential
settlement also occur throughout the hinterland.
At the 2021 census, 48.6 of the LGA resident population identified as male and 51.4% as female.
The median age in the region was 50 years old, compared with 37.8 years old as the median age for
Queensland. Children aged 0-14 years made up 14.8% of the population, people aged 65 years and over made
up 25% of the population and the remaining 60.2% of the population were aged between 15 and 64 years old.
The largest represented age group was those between 60 and 64 years old. Like many other coastal
communities in Queensland, the Noosa community has an ageing population. As at December 2021, there
were 7,825 recipients of the age pension in the Noosa LGA. The two communities with higher percentages of
population over the age of 65 are Noosaville (35.4%) and Noosa Heads (30.5%). Therefore, these areas may
need extra assistance in evacuating and recovering.



3.3.2 Cultural Diversity
The Traditional Owners and original custodians of the lands of the Noosa Shire Council area, are the Kabi Kabi
/ Gubbi Gubbi people. At the 2016 Census, 1.7% of the population of the Noosa Shire identified as being of
Aboriginal or Torres Strait Islander descent.
At the 2021 Census, 71.2% of people indicated they were born in Australia. The most common other countries
of birth were England 7.5%, New Zealand 4%, South Africa 1.1%, Germany 0.9% and the USA 0.8%.
At the 2021 Census, 88.5% of households spoke only English at home. There were 7.9% of households where
a non-English language is used. The top five non-English languages spoken at home for the total population of
Noosa LGA were German (0.7%), French (0.6%), Portuguese (0.6%), Spanish (0.5%) and Italian (0.4%).



3.3.3 Families, Households & Dwellings
Data obtained from the 2021 Census indicates there are 16,091 families in Noosa. Of these, 51.4% are couple
families with no children, 34.2% are couple families with children, 13.6% identified as one parent families and
0.7% as other families.
At the 2016 Census, there were 21,847 occupied private dwellings in the Noosa Council area. Of these, 79.5%
were separate, detached houses, 12% were semi-detached row, terrace or town houses, 7.8% were flats, units
or apartments and 0.3% were other dwellings such as caravans, tents and sheds.
The Noosa Council area had a comparatively high proportion of home ownership with 43.7% of occupied
private dwellings owned outright, compared with 29.1% in Queensland and 31% in Australia. A further 31.1% of
Noosa Council households were purchasing their house with a mortgage. The median monthly mortgage
repayment in the region was $1,900, higher than the Queensland median monthly repayment of $1,733.
At the 2021 Census, 20.9% of Noosa Council area households were renting, with a median weekly rent of $460.
This is significantly higher than the $305 weekly median rent for Queensland. The communities that have the



Noosa Council 2025 | Local Disaster Management Plan                               Page 31 of 73     Page 49 of 141

Page 50

highest rental percentages are Sunshine Beach (37.1%), Sunrise Beach (30.5%), Noosa Heads (29.3%) and
Tewantin (28.2%).



3.3.4 Socioeconomic Disadvantage
The Australian Bureau of Statistics Socio-Economic Indexes for Areas (SEIFA) 2016 by LGA includes the Index
of Relative Socio-economic Disadvantage, (IRSD) which is an index that summarises the relative disadvantage
of people and households within an area. The IRSD considers a range of economic and social condition
variables to determine an area’s relative disadvantage score. Indicators which are considered include the
percentage of population who are on low income, unemployed, without internet, have no/low educational
attainment, undertake low skilled employment, have health conditions, no personal transport, poor English, or
are one parent families. A low score is indicative of a relatively greater general disadvantage in the population
when compared with other areas.
In 2016, the Noosa Council area received a relative disadvantage score of 1,014. This was the lowest level of
disadvantage in the Sunshine Coast region. When compared to all of Australia’s suburbs and localities, this
score placed Noosa Shire in the 53rd percentile, meaning that 53% of Australia’s communities are more
disadvantaged than the Noosa Shire, while 47% are considered to have a lower level of disadvantage than
Noosa. The percentage of persons in Noosa in the most disadvantaged quintile was 5.8% with 12.6% in the
least disadvantaged quintile.



3.3.5 Access to Motor Vehicles
Within Noosa 3.5% of people do not have access to a motor vehicle which is lower than the state average of
5.7%. The two communities with areas of very high percentages of dwellings without access to motor vehicles
are Noosaville and Tewantin (6%). Therefore, these areas may need extra assistance in evacuating.



3.3.6 Vulnerable Persons
The Noosa Council area includes people who may be highly vulnerable to the impacts of disasters. At the 2021
Census, 29.6% of the population identified as experiencing one or more long term health conditions.
As at December 2021, there were 1,598 recipients of the disability support pension in the Noosa Shire. The
Department of Communities, Child Safety and Disability Services provides disability services, support and
facilities to people with a disability and their carers living in Noosa.
Wesley Care Tewantin is a specialist disability accommodation option that provides space for up to six people.
There are six aged care facilities located across the region:
   • Blue Care - Sunrise Beach, 4 Grasstree Court, Sunrise Beach
   • Carramar – 186 Cooroy Noosa Road, Tewantin
   • Kabara – 120 Topaz Street, Cooroy
   • Ozcare – 80 Cooyar Street, Noosa Heads
   • Estia – 119 Moorindil Street, Tewantin
   • Arcare – Goodchap Street / Val Crescent, Tewantin
In addition, there are six retirement villages:
    • Noosa Domain – 35 Walter Hay Drive, Noosaville
    • Hibiscus Noosa Outlook – 71 St Andrews Drive, Tewantin
    • Laguna Estate – 21 Lake Weyba Drive, Noosaville
    • Southern Cross Noosa Waters – 39 Lake Weyba Drive, Noosaville
    • Riverlands Retirement Village – 139 Moorindil Street, Tewantin
    • Palm Lake Resort - 19 Trading Post Road, Cooroy.




Noosa Council 2025 | Local Disaster Management Plan                               Page 32 of 73    Page 50 of 141

Page 51

Additional facilities are currently in approval and / or construction stage. Aged care facilities in the region are
generally well connected and resilient and have robust business continuity plans in place.
At the time of the 2016 Census, 110 people in the Noosa LGA were considered homeless.
Within all communities, for any number of reasons, members may be, or become, vulnerable for shorter or
longer terms. Such reasons include a reliance on mechanical life support systems (e.g. dialysis, ventilators), a
culturally or linguistically diverse background, isolation, little social support or high levels of socio-economic
disadvantage, visitors to the region, or chronic or acute health conditions. In 2017-2018 the Australian Bureau
of Statistics found just under half of Australians had one or more chronic health conditions and 1 in 5 reported
having a mental or behavioural condition (ABS, 2017-2018).




Noosa Council 2025 | Local Disaster Management Plan                                   Page 33 of 73     Page 51 of 141

Page 52

 Disaster Risk
 Management




                                                      SECTION FOUR
Noosa Council 2025 | Local Disaster Management Plan      Page 34 of 73
                                                                         Page 52 of 141

Page 53

Section 4.1
4.1    Risk Based Planning                                                    SECTION
                                                                               SECTIONFOUR
                                                                                       FOUR
Risk based planning is a critical element of all phases of PPRR. In Queensland this is achieved through the
Queensland Emergency Risk Management Framework (QERMF) risk assessment process. A QERMF
assessment was completed in 2022 for Noosa Shire by BMT. Six hazard scenarios were chosen for Noosa in
collaboration with QFD which guided the assessment process. The following hazards were considered:

   •   Scenario 1:     Severe Tropical Cyclone
   •   Scenario 2:     Category 2 Cyclone / East Coast Low
   •   Scenario 3:     Severe thunderstorm event
   •   Scenario 4:     Earthquake
   •   Scenario 5:     Bushfire
   •   Scenario 6:     Heatwave
Additionally, a non-natural hazard risk assessment was completed using the QERMF. The 2022 risk
assessment was informed by the Noosa Shire Disaster Risk Assessment undertaken in 2011, updated with the
most recent information from authoritative sources on incident frequency and consequences. The non-natural
hazard risk assessment provided a high-level risk rating, based on assessed likelihood, vulnerability, and
consequence for these hazards for the whole of Noosa Shire.



Section 4.2
4.2    Methodology
The QERMF methodology is depicted below. The QERMF model has four steps to ensuring the identification,
analysis and management of risk. Further detail can be obtained from the QERMF Risk Assessment
Process Handbook.
The QERMF approach was followed for each of the six hazard scenarios identified by QFD, including a
comprehensive GIS assessment of impact on critical infrastructure.
A process to adjust the 2011 risk assessment updated by new hazard likelihood, vulnerability and
consequence data, to the values within the QERMF was completed for hazards identified as plausible outside
of the six scenarios provided by QFD.
Full details of the methodology and results are available in the report: Multi-hazard Risk Assessment of Noosa
Regional Council using Queensland Emergency Risk Management Framework (QERMF).




                             Figure 8: Risk Management Framework Approach to managing risk.




Noosa Council 2025 | Local Disaster Management Plan                                      Page 35 of 73
                                                                                                         Page 53 of 141

Page 54

Section 4.3
4.3    Results
Full results of the QERMF risk assessment are included in the report: Multi-hazard Risk Assessment of Noosa
Regional Council using Queensland Emergency Risk Management Framework (QERMF). A summary of the
high-level risk assessment information to inform PPRR can be found in the Natural Hazard Risks and Non-
Natural Hazard Risks sections below.

4.3.1 Natural Hazard Risks
The Table 3 below provides a summary of the scenario components assessed and likelihood results of the
QERMF risk assessment process in relation to the six event scenarios selected by QFD for assessment.

 Event / scenario      Primary hazards                QFD designated Determined            QERMF
                                                      probability (AEP) probability
                                                                                           Likelihood
                                                                        (AEP)

 Severe Tropical        •   Widespread Severe         < 0.5%            1-10%              Unlikely
 Cyclone                    (Destructive) Wind
 (Cat 3-5)              •   Flooding
                        •   Storm tide
                        •   Coastal Erosion
 Tropical Low /         •   Widespread Severe         5%                1-10%              Possible
 Cyclone                    (Damaging) Wind
 (Low - Cat 2)          •   Flooding
                        •   Storm tide
 Severe                 •   Lightning                 100%              >63%               Almost
 Thunderstorm                                                                              Certain
                        •   Hail
 Event
                        •   Wind gusts
                        •   Localised Severe Wind
                            (Tornado)
                        •   Flash flooding
 Earthquake             •   Earthquake                0.06%             0.1-1%             Rare
                        •   Tsunami
                        •   Landslide
 Bushfire /             •   Bushfire (rural and urban 100%              10-63%             Likely
                            interface)
 Heatwave
                        •   Extreme heatwave

                        Table 3: QERMF Scenario components and likelihood




Noosa Council 2025 | Local Disaster Management Plan                             Page 36 of 73
                                                                                                  Page 54 of 141

Page 55

Section 4.3
Scenario 1: Tropical Cyclone (Category 3 - 5)
The QERMF Severe Tropical Cyclone risk assessment scenario included destructive winds, heavy rainfall
(>500 mm in 24 hours) leading to flash and moderate to major flooding and landslides. The risk assessment
included assessment of storm tide, flooding, coastal erosion, and landslide associated with the cyclone.
The determined QERMF likelihood for Scenario 1 can be found in Table 3 above.
A summary of the residual risk level for Scenario 1 can be found in Table 4 below.
Geographic vulnerability to the effects of scenario 1 modelling is illustrated in Figure 9 below.




         Figure 9: Relative vulnerability of meshblock (small community level boundaries) to Scenario 1




Noosa Council 2025 | Local Disaster Management Plan                                  Page 37 of 73
                                                                                                     Page 55 of 141

Page 56

Section 4.3
Scenario 2: Category 2 Cyclone / East Coast Low
The QERMF Category 2 Cyclone / East Coast Low risk assessment scenario included heavy rainfall with a
resulting 1% AEP flooding event.
The determined QERMF likelihood for Scenario 2 can be found in Table 3 above .
A summary of the residual risk level for Scenario 2 can be found in Table 4 below.
Geographic vulnerability to the effects of scenario 2 modelling is illustrated in Figure 10 below.




      Figure 10: Relative vulnerability of meshblock (small community level boundaries) to Scenario 2




Noosa Council 2025 | Local Disaster Management Plan                                 Page 38 of 73
                                                                                                     Page 56 of 141

Page 57

Section 4.3
Scenario 3: Severe Thunderstorm
The QERMF Severe Thunderstorm risk assessment scenario included strong winds, damaging hail, flooding
and lightning.
The determined QERMF likelihood for Scenario 3 can be found in Table 3 above.
A summary of the residual risk level for Scenario 3 can be found in Table 4 below.
Geographic vulnerability to the effects of scenario 3 modelling is illustrated in Figure 11 below.




         Figure 11: Relative vulnerability of meshblock (small community level boundaries) to Scenario 3




Noosa Council 2025 | Local Disaster Management Plan                                  Page 39 of 73
                                                                                                     Page 57 of 141

Page 58

Section 4.3
Scenario 4: Earthquake
The QERMF Earthquake risk assessment scenario also included tsunami risk.
The determined QERMF likelihood for Scenario 4 can be found in Table 3 above. A summary of the residual
risk level for Scenario 4 can be found in Table 4 below.
Geographic vulnerability to the effects of scenario 4 modelling is illustrated in Figure 12 below.




        Figure 12: Relative vulnerability of meshblock (small community level boundaries) to Scenario 4




Noosa Council 2025 | Local Disaster Management Plan                                 Page 40 of 73
                                                                                                     Page 58 of 141

Page 59

Section 4.3
Scenario 5: Bushfire
The QERMF Bushfire risk assessment assessed risk of bushfire from all causes.
The determined QERMF likelihood for Scenario 5 can be found in Table 3 above.
A summary of the residual risk level for Scenario 5 can be found in Table 4 below.

Geographic vulnerability to the effects of Scenario 5 modelling is illustrated in Figure 13 below.




         Figure 13: Relative vulnerability of meshblock (small community level boundaries) to Scenario 5




Noosa Council 2025 | Local Disaster Management Plan                                 Page 41 of 73
                                                                                                     Page 59 of 141

Page 60

Section 4.3

Scenario 6: Heatwave
The QERMF Heatwave risk assessment scenario also considered the long-term effects of heat such as
drought. Drought is not considered a disaster in Queensland and is not managed using the QDMA.
A Drought Relief Assistance Scheme for primary producers is available from the State Government.
The determined QERMF likelihood for Scenario 6 can be found in Table 3 above.
A summary of the residual risk level for Scenario 6 can be found in Table 4 below.
Geographic vulnerability to the effects of Scenario 6 modelling is illustrated in Figure 14 below




      Figure 14: Relative vulnerability of meshblock (small community level boundaries) to Scenario 6




Noosa Council 2025 | Local Disaster Management Plan                                 Page 42 of 73
                                                                                                    Page 60 of 141

Page 61

Section 4.3
Table 4 below provides a summary of the key high-risk assets in the Noosa Shire with an identified residual risk
rating for each of the six QERMF hazard scenarios that were selected by QFD for assessment.




                            Table 4: A summary of key high-risk assets for Noosa Shire


 Asset category                                                   Residual risk rating

                                      Severe    East coast      Severe      Bushfire     Earthquake      Heatwave
                                      cyclone      low       thunderstorm
 Critical services

 Communication                          H             H           H             H            H              M

 Power                                  H             H           L             M            H              L

 Fuel Infrastructure (Bulk fuel)        H             H           L             L            M              M

 Water treatment / supply               M             M           M             H            H              M



 Wastewater treatment                   M             M           M             M            H              M

 Waste                                  M             M           H             M            M              M

 Access and resupply

 Roads                                  M             M           H             M            H              M

 Bridges                                M             M           M             L            H              M

 Community and social

 Schools                                H             H           H             H            H              H

 Population centre                      H             H           H             H            H              E

 Emergency shelters                     H             M           H             H            H              H

 Emergency services                      L            L           M             L            L              M

 Socio-economically disadvantaged       H             H           H             H            H              E
 / other vulnerable people


 Medical

 Hospitals                              M             M           H             M            M              H

 Aged care facilities                   M             M           M             H            H              E
Significant industry

 Agriculture / industry                 M             M           H             M            M              H




Noosa Council 2025 | Local Disaster Management Plan                                      Page 43 of 73
                                                                                                         Page 61 of 141

Page 62

Section 4.3
4.3.2 Non-Natural Hazard Risks
QERMF process has been used to reassess non-natural hazard events that may impact the Noosa
community. A summary of the results including residual risk ratings can be found in Table 5 below: Further
detail can be found in the Multi-hazard Risk Assessment of Noosa Regional Council using Queensland
Emergency Risk Management Fram Framework (QERMF).


             Table 5: Non-Natural and Biological Hazards Summary Table (QERMF Assessment)

 Hazard                  Likelihood             Vulnerability      Consequence             Residual Risk
                                                                                           Rating (VL 1 –
                                                                                           E13)
 Pandemic                Rare                   High               Catastrophic            Medium (8)
 Major Fire (Urban)      Almost Certain         Low                Moderate                Medium (8)
 Terrorism               Possible               Moderate           Major                   Medium (8)
 Dam Failure             Rare                   Moderate           Catastrophic            Medium (7)
 Black Swan              Rare                   Moderate           Catastrophic            Medium (7)
 Hazardous Material      Unlikely               Moderate           Major                   Medium (7)
 Accident (Land
 Transport)
 Hazardous Material      Unlikely               Moderate           Moderate                Low (6)
 Accident (Marine)
 Hazardous Material      Unlikely               Low                Major                   Low (6)
 Accident (Industrial
 Site)
 Major Passenger         Rare                   Low                Catastrophic            Low (6)
 Transport Accident
 Biosecurity Hazard      Possible               Low                Moderate                Low (6)
 Cyber Security / IT     Possible               Moderate           Minor                   Low (6)
 Failure
 Essential Service       Unlikely               Low                Moderate                Low (5)
 Failure
 Major Air Transport     Rare                   Very Low           Major                   Low (4)
 Accident




Noosa Council 2025 | Local Disaster Management Plan                               Page 44 of 73
                                                                                                  Page 62 of 141

Page 63

Section 4.4
4.4      Residual Risks
The LDMG recognises its treatment options will not always be adequate and residual risk will remain. Residual
risks are the risks which remain after the LDMG has applied the risk mitigation strategies within their capacity,
but those strategies have not sufficiently reduced or eliminated the risk.
The following is a list of identified risks identified using the QERMF methodology that are not within the
capacity of the LDMG to address and are therefore deemed to be Residual Risks to be escalated to the
DDMG.
                             Table 6: Summary of Residual Risks for Noosa Shire

 Issue                        Current Capacity                   Residual Risk            Can Council
                                                                                          assist?
 Evacuation of entire         Limited capacity exists to         Request to District      Limited
 community                    evacuate the whole                 for assistance
                              community.
 Multiple houses              There is a risk that emergency     Request to District      Limited
 damaged especially           services response to any           for assistance
 those involving multi-       disaster event will be severely
 casualty scenarios           compromised as a result of
                              insufficient response capacity.
 Asbestos contamination       The community has limited          Request to District      Limited
 from damaged buildings       personnel trained in or            for assistance
                              equipped for asbestos
                              removal. External expertise will
                              be required.
 Managing multiple            Limited capacity exists to         Request to District      Limited
 Evacuation Centre            manage and staff evacuation        for Assistance
 Facilities                   centre facilities.
 Various Public Health        The community has a small          Request to District      Limited
 Risks                        team of EHO’s. In a major          for assistance
                              event, professional EHO
                              assistance will be required for
                              a range of public
                              health/environmental health
                              issues.
 Significant Terrorist        While Queensland Police            Request to District      Limited
 Attack or other Attack on    would escalate through their       (and likely further
 the State                    own channels, the requirement      to the State) for
                              for community support and          assistance
                              recovery resources could be
                              large.




Noosa Council 2025 | Local Disaster Management Plan                                    Page 45 of 73
                                                                                                       Page 63 of 141

Page 64

 Prevention




                                                      SECTION FIVE
Noosa Council 2025 | Local Disaster Management Plan     Page 46 of 73
                                                                        Page 64 of 141

Page 65

Section 5.1
5.1    Prevention
Prevention includes those measures to eliminate, mitigate or reduce the likelihood of a disaster event
occurring, or the severity of an event should it eventuate.
Hazard mitigation is the action taken in advance of a disaster, aimed at eliminating or reducing the impact on
communities, the economy, infrastructure and the environment.
The implementation of appropriate and targeted mitigation initiatives can offer more sustainable cost savings
to communities and government in the event of a disaster and result in safer, more resilient and sustainable
communities.



Section 5.2
5.2    Land Use Planning
Prevention includes use planning in areas that are exposed to natural hazards can significantly reduce
disaster risk, the impact of hazards should they arise and enhance the resilience of existing and future
communities. Regulating the use and development of land is a key strategy to avoid risk to life, property and
environmental systems and reduce damage and disruption to the community within the Noosa Council area.
The Noosa Plan 2020 provides a framework under the Sustainable Planning Act 2009 for managing
development within the region over the next 20 years. The Planning Scheme uses a series of overlays as a
means of influencing development to mitigate or reduce the effects of hazards:

   •   Bushfire Hazard Overlay
   •   Flood Hazard Overlay
   •   Landslide Hazard Overlay.



Section 5.3
5.3    Building Codes, Regulations & Legislation
Prevention application of building codes and building use regulations aims to ensure that buildings and
infrastructure are designed and constructed to standards that reduce the likelihood of damage and injury in an
event. Standards and codes should be referred to and enforced particularly for the design and construction of
major infrastructure and components of essential services.



Section 5.4
5.4    Design
Design improvements to infrastructure or services can be engineered to provide a greater level of resilience.
Design improvements can be applied to new infrastructure or to harden existing infrastructure or when
considering betterment works during the reconstruction phase. Ensuring the reliability of critical infrastructure
and services supports the communities social and economic wellbeing.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 47 of 73
                                                                                                    Page 65 of 141

Page 66

Section 5.5
5.5    Hazard Reduction
Each agency of the LDMG is responsible for implementing appropriate hazard reduction programs for risks
under their control. As an example, QFD, Noosa Council and various landowners undertake an annual hazard
reduction program for bushfires. This includes a fire management program of fuel reduction and back-burning,
maintenance and development of fire breaks and land management practices. Noosa Council plays an active
role on the Area Bushfire Management Committee (ABMC) which provides strategic fire mitigation programs,
operational preparedness and response, risk identification and hazard reduction burning for the Noosa Council
area. The LDMG adopts the multi-agency Bushfire Risk Management Plan prepared by QFD in collaboration
with the ABMC.



Section 5.6
5.6    Climate Change
Southeast Queensland has been identified as one of several high-vulnerability climate change hot spots in
Australia. The frequency and severity of hazards including major storm events, droughts, heatwaves,
bushfires, and flooding across the region are expected to increase as the climate continues to change.
Noosa Council accepts the latest science on climate change provided by the Intergovernmental Panel on
Climate Change and acknowledges that the Noosa Shire is vulnerable to the impacts of climate change
including heat waves, more intense storms and sea level rise all of which is likely to adversely affect the Noosa
natural and human environment.
In recognition of the risks posed by a rapidly changing climate, Council declared a climate emergency in
order to drive the urgent and sustained response needed to both mitigate and adapt to climate change.
Council’s Climate Change Response Plan sets out desired outcomes and actions for both reducing
emissions and implementing adaptation measures.
Adaptative measures should be considered to manage future climate risks. A Queensland Government
Emergency Management Sector Adaptation Plan for Climate Change is available.



Section 5.7
5.7    Coastal Hazards Adaptation Plan
Council has developed a Coastal Hazards Adaptation Plan (CHAP) that addresses sea level rise-driven
risks in the coastal zone as a result of coastal erosion and shoreline recession, storm tide inundation and
permanent inundation.



Section 5.8
5.8    Disaster Risk Reduction
Disaster risk and its reduction are recognized as global priorities under the United Nations Office for Disaster
Risk Reduction’s Sendai Framework for Disaster Risk Reduction 2015–2030, to which Australia is a signatory.
In alignment with this framework, the Queensland Government has implemented the Queensland Emergency
Risk Management Framework (QERMF). Further analysis of disaster risk reduction strategies and mitigation
options is provided in the report: Multi-Hazard Risk Assessment of Noosa Regional Council using the
Queensland Emergency Risk Management Framework (QERMF).




Noosa Council 2025 | Local Disaster Management Plan                                Page 48 of 73
                                                                                                   Page 66 of 141

Page 67

 Preparation




                                                      SECTION SIX
Noosa Council 2025 | Local Disaster Management Plan   Page 49 of 73
                                                                      Page 67 of 141

Page 68

Section 6.1
6.1    LDMG Preparedness & Capacity Building
LDMG preparedness and capacity relates to having arrangements and plans in place to ensure that, should a
disaster occur, all the agencies, resources and services which are needed to cope with the effects can be
efficiently mobilised and deployed within the framework of the Queensland Disaster Management
Arrangements.
Capacity building occurs across the phases of prevention and preparation and is built through activities that
reduce the level of risk or the effects of disaster and result in ongoing
improvement of the disaster management arrangements. The implementation and delivery of the Queensland
Emergency Risk Management Framework as well as ongoing LDMG meetings, planning, workshops, training
and exercises are critical elements in the continuous improvement of disaster management capacity building.



Section 6.2
6.2    Community Preparedness & Capacity Building
Section 30 of the Disaster Management Act requires the LDMG to ensure that the community is aware of ways
of mitigating the adverse effects of an event and preparing for, responding to and recovering from a disaster.
Effective disaster response and recovery activities begin with preparedness and awareness raising activities
that are conducted on an ongoing basis, in advance of any potential disaster to ensure that if an event occurs,
communities and their resources and services can cope with its effects.
In recognition of the size and diversity of the Shire, the LDMG proactively works with community organisations,
local business groups and others to prepare disaster, emergency and business continuity plans and strategies
for particular high-risk localities and demographic groups with the Noosa Shire.
The LDMG uses the Get Ready Queensland resources to focus on creating resilient communities through
education and awareness raising and building capacity. Resilient communities are those that understand the
risks they face, how to prepare themselves, their home and their community for the possibility of a disaster
event to minimise impacts, can adapt to the circumstances, recover quickly and emerge stronger than their
pre-disaster state.

6.2.1 Community Profiles & Plans
The LDMG recognises that local knowledge is invaluable to the disaster planning process and that the
community plays a key role in contributing to its own safety. The LDMG advocates that everyone can prepare
for disasters in ways that can reduce the impact on themselves, their home, family, friends, pets and
community. Being prepared in advance can make emergencies less stressful and save precious time.
A community profile has been prepared for each community in the Noosa Council area identifying local
demographics, local hazards and risks as well as information on how to prevent, prepare, respond and recover
from disasters.
Some communities in the Noosa Council area have determined that they would like to develop and maintain
their own community disaster plan – refer section 1.6.4.

6.2.2 Community National Strategy for Disaster Resilience
The National Strategy for Disaster Resilience identifies common characteristics of disaster resilient
individuals, communities and organisations. These characteristics are functioning well while under stress,
successful adaptation, self-reliance and social capacity.
The strategy identifies that community members can work together, using their knowledge and resources to
prepare for and deal with disasters. These actions will create self-reliance and build social capacity within the
community so that it can function effectively under stress in responding to and recovering from a disaster
event.


Noosa Council 2025 | Local Disaster Management Plan                                 Page 50 of 73
                                                                                                    Page 68 of 141

Page 69

The key to achieving a resilient community is for government, community and business to share in the
responsibility for preparing for, responding to and recovering from a disaster.

6.2.3 Community Profiles & Plans Queensland Strategy for Disaster Resilience
Queensland is the most disaster impacted state in Australia. By necessity, Queenslanders are renowned for
their resilience and ability to adapt, with a strong community spirit that supports those in need to withstand and
recover from disasters.
The preparedness and resilience of individuals and communities is a shared responsibility of all sectors,
including all levels of government, business, NGO’s and individuals. Disaster resilience is significantly
increased by proactive planning and preparation for the protection of life, property and the environment
through an awareness of hazards, associated risks and local disaster management arrangements. The
Queensland Strategy for Disaster Resilience is the guiding instrument for realising the vision to make
Queensland the most disaster resilient state in Australia and is underpinned by four key objectives:

   •   Queenslanders understand their disaster risk
   •   Strengthened disaster risk management
   •   Queenslanders are invested in disaster risk reduction
   •   Continuous improvement in disaster preparedness.

6.2.4 Get Ready Queensland Initiative
The LDMG has undertaken a series of community forums, presentations, displays and community awareness
days as part of promoting the annual Get Ready Program in the Noosa Shire Council area.
These community engagement programs aim to build resilience in preparation for seasonal hazards (e.g.
severe storms, bushfires, floods). These programs are aimed at empowering individuals and the community to
understand their local risks and take pre-emptive action to prepare themselves, their families, homes and
businesses in the event of disaster. The Get Ready Queensland program promotes three steps to Get Ready
– understand your risk, prepare your
home and pack an emergency kit. Additionally, the Get Ready Queensland team provide funding, resources
and support for local government ‘Get Ready’ initiatives.



Section 6.3
6.3    Noosa Emergency Action Guide
The Noosa Emergency Action Guide has been developed to assist residents of the Noosa Shire to prepare
for, respond to and recover from disasters that affect the local area. The guide is designed to assist residents
understand the risk and likelihood of disasters in their communities as well as how to prepare an emergency
plan and emergency kit, prepare homes, yards and pets and where to find information during a disaster.



Section 6.4
6.4    Disaster Dashboard & Noosa Alert
The Noosa Disaster Dashboard provides a one stop shop site for the community to access BoM weather
warnings, up-to-date information on road closures, power outages, evacuation centres, helpful contacts and links
to other useful disaster-related information and social media.
The LDMG uses Noosa ALERT to send text messages (SMS) and emails out in relation to local disasters, severe
weather and emergency events. This is an opt-in service that requires registration.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 51 of 73
                                                                                                    Page 69 of 141

Page 70

Section 6.5
6.5    Insurance
There is significant risk to the community in recovering from a disaster due to under-insured and non-insured
residential properties and businesses. While this is of concern to the LDMG, it is considered that this is an issue
for the insurance industry and the State Government with input from the LDMG through its members.




Noosa Council 2025 | Local Disaster Management Plan                                  Page 52 of 73
                                                                                                      Page 70 of 141

Page 71

 Response




                                                      SECTION SEVEN

Noosa Council 2025 | Local Disaster Management Plan      Page 53 of 73
                                                                         Page 71 of 141

Page 72

Section 7.1
7.1    Initial Response
The majority of emergency incidents will be dealt with by the relevant lead agency using its own frontline
response capabilities. An Incident Control Centre (ICC) may be established by the lead agency to focus on the
immediate response to reduce the threat of the hazard. It is up to each lead agency to determine the
circumstances and triggers which require notification to, and additional support from, the LDMG.



Section 7.2
7.2    Activation of LDMG
Timely activation of the LDMG is critical. The LDMG will activate in response to an actual or perceived threat of a
disaster event which will likely have significant community consequences and requires a coordinated response
and / or recovery effort.
The decision to activate is based upon defined triggers and the perceived level of threat.
The authority to activate the LDMG is at the discretion of the LDMG Chair in consultation with the Local Disaster
Coordinator (LDC) based on the nature and scale of the event. The LDMG Chair will consult with the full
membership where time permits.
The LDC is responsible for managing disaster operations and implementing the strategic direction set by the
LDMG.



Section 7.3
7.3    Activation Criteria
Timely disaster management system at a local level, involving the LDMG, may be activated for any number of
reasons. The following decision criteria should be employed (if yes is answered to any of the following the
LDMG should be activated):

   •   Is there a perceived need relative to an impending hazard impact which requires multi-agency
       coordination?
   •   Has there been a request from a response agency, to provide resource support and coordination in
       support of operations?
   •   Has there has been a request / direction from the DDC to activate the LDMG?
   •   Has there been a sudden impact event which requires involvement of the LDMG in one or more
       phases of PPRR?



Section 7.4
7.4    Activation of Field Command Centre
Timely frontline of disaster operations in the Noosa Council area is the Field Command Centre (FCC). The FCC
is used in coordinating and managing resources within the Noosa Council Infrastructure Services Department
during a disaster or emergency. The FCC is tasked by the Local Disaster Coordination Centre (LDCC) and
provides situational reporting as required. A plan for the activation and operation of the FCC is maintained by
Infrastructure Services along with defined trigger points and agreed actions for Council Depots.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 54 of 73
                                                                                                     Page 72 of 141

Page 73

Section 7.5
7.5    Activation of LDMP and Sub Plans
The LDMP will be activated automatically whenever the LDMG activates. The LDC is responsible for activating
approved Sub Plans as required by the nature and circumstances of the event.


Section 7.6
7.6    Notification Process & Flowchart
The LDMG Chair & LDC will maintain situational awareness in relation to events that have the potential to require
the activation of the disaster management system.
When a decision is made to activate the LDMG, the appropriate activation level will be determined and
communicated to LDMG members. The initial LDMG meeting will be scheduled, and further meetings agreed
where necessary.
The DDC will be advised verbally and in writing that the LDMG has activated.
This LDMP will be automatically invoked and the LDC will invoke associated Sub Plans as required by the nature
and scale of the event.




                                Figure 15: Noosa LDMG Response Notification Flowchart




Noosa Council 2025 | Local Disaster Management Plan                                     Page 55 of 73
                                                                                                        Page 73 of 141

Page 74

Section 7.7
7.7    Activation Levels

                                     Table 7: Noosa LDMG Activation Levels
                             Triggers                     Actions                         Communications

 ALERT                       A heightened level of        Monitor situation closely –     Chair and LDC
                             vigilance due to the         watching brief.                 communicating remotely.
                             possibility of an event.
                                                          Initial advice to
                                                          s takeholders.
                                                          Refer LDC checklist.
 LEAN FORWARD                Operational state prior toEnsure relevant facilities         Chair, LDC and LDMG
                             stand up.                 are set up and rosters             members on mobile
                                                       developed as required              and monitoring email
                             Heightened level of       (e.g. LDCC and                     remotely.
                             situational awareness and evacuation centres)
                             a state of operational                                       Ad-hoc reporting.
                             readiness.                Formal briefing of LDMG.
                                                          Public information and
                                                          warnings initiated.
                                                          Refer LDC checklist.




 STAND UP                    Threat is imminent.          Activate staff and facilities   Formal SITREP
                             Community has been or        as needed (e.g. LDCC and        reporting.
                             will be impacted.            evacuation centres).
                             Resources are mobilised,     Manage disaster operations.
                             personnel are activated,
                             and operational activities
                             commence.



 STAND DOWN                  Transition from              Implement plan to transition    Final response
                             responding to an             to recovery.                    SITREP to DDC.
                             event to normal core
                             business and/or recovery     Debriefing and identification
                             operations.                  of lessons.




Noosa Council 2025 | Local Disaster Management Plan                                       Page 56 of 73
                                                                                                              Page 74 of 141

Page 75

Section 7.8
7.8     Response Priorities
The response phase involves the taking of appropriate measures to respond to an event, including action taken
and measures planned in anticipation of, during, and immediately after an event to ensure that its effects are
minimised and that persons affected by the event are given immediate relief and support.
The following priorities apply to any response:

    •   Protection of life
    •   Protection of critical infrastructure
    •   Protection of property, livelihoods and the economy
    •   Protection of the environment.



Section 7.9
7.9     Response Principles
The LDMG will:

    •   Activate early to prepare and to plan for the response and coordination of disaster operations
    •   Work closely with the responsible lead agency and the DDMG to manage and coordinate disaster
        operations
    •   Provide warnings, alerts and public information early and consistently to the community or those who
        need it
    •   Ensure disaster response and recovery operations are coordinated
    •   Ensure resources are accessed and used effectively
    •   Provide support to meet community needs
    •   Provide situational reporting.
The LDMG will ensure the responsible lead agency is supported by the disaster management system during
their response to an event. The responsible lead agencies for each hazard can be found in the State Disaster
Management Plan – Appendix B.



Section 7.10
7.10 Disaster Declaration
In accordance with section 64(1) of the Act, the DDC may, with the approval of the Minister, declare a disaster
situation for the district, or a part of it if satisfied that a disaster has happened, is happening or is likely to happen,
in the disaster district and it is necessary, or reasonably likely to be necessary, for the DDC or a declared disaster
officer to exercise declared disaster powers to prevent or minimise any of the following:

    •   Loss of human life
    •   Illness or injury to humans
    •   Property loss or damage
    •   Damage to the environment
Before declaring a disaster situation, the DDC is to take reasonable steps to consult with each local government
in, or partly in, the proposed declared area. As outlined in section 75 to 78 of the Act, the declaration confers
extra powers on particular groups to perform actions, give directions and control movements within the declared
area.
It is important to note that the declaration of a disaster situation relates to the situational requirement for
additional powers and is not linked to the activation of particular disaster management groups under the QDMA
or the activation of disaster financial assistance arrangements. All three actions are independent processes and


Noosa Council 2025 | Local Disaster Management Plan                                       Page 57 of 73
                                                                                                           Page 75 of 141

Page 76

are not interlinked or conditional, although some or all may occur for the same event. The declaration of a
disaster situation does not impact the requirements of a local government under the Act to manage disaster
operations in their area.



Section 7.11
7.11 Guardian Information Management System
The LDMG Guardian Information Management System (IMS) is an electronic workflow for managing disaster
events. The spatially integrated solution holds plans and preparation documents, creates a chronological record
of events and a fully auditable trail of actions, as well as details on the allocation and management of tasks,
bulletins, evacuation centres, road closures and reports using official and custom-built templates.
Situation Reports (SITREPS) will need to be prepared on a regular basis. SITREPS will be created and stored
within Guardian IMS, so they are accessible to all LDMG agencies.



7.12 Activation of the Local Disaster Coordination Centre
The LDCC is where the multi-agency response to the event is coordinated from. The primary LDCC is located at
the Noosaville Depot in the Local Disaster Coordination Centre Building. For further information refer to the
LDCC Sub Plan.



7.12.1 Community National Strategy for Disaster Resilience
When an event is imminent, it is essential the public are warned of the danger and provided with information
about the event and advice on recommended actions. The key objective is to deliver accurate, clear, timely
information and advice to the public, so they feel confident, safe and well informed and are aware of any
recommended actions. Refer Public Information & Warnings Sub Plan.




Noosa Council 2025 | Local Disaster Management Plan                               Page 58 of 73
                                                                                                  Page 76 of 141

Page 77

Section 7.12
7.12.2 Evacuation
The safety of residents is the primary driver for evacuation. Evacuation carries risks to both those being
evacuated and to emergency personnel managing the evacuation. Consideration must be given to the risks
associated with the conduct of any evacuation. Under some circumstances, sheltering in place may provide
greater levels of safety for the community. For further information refer to the Evacuation Sub Plan.



7.12.3 Financial Management
Operational expenditure needs to be tracked using work order numbers established specifically for the event.
At the conclusion of the disaster event, all expenditure needs to be finalised. Invoices need to be collated,
payments made, and Disaster Recovery Funding Arrangements (DRFA) claims need to be completed - refer to
Financial Management Sub Plan.



7.12.4 Public Health
A major disaster event may cause significant disruption to the community. Water supplies, sewage treatment,
refuse disposal, and access to safe food may be compromised – refer to Public Health Sub Plan.



7.12.5 Logistics
Timely acquisition and deployment of services and supplies is critical to the efficient response to and recovery
from a disaster event. When all local resources have been exhausted or are inadequate, requests for
assistance outside the Noosa Shire Council area shall be directed to the DDC. All external assistance requests
shall be coordinated by the LDC on behalf of the LDMG – refer Logistics Sub Plan



7.12.6 Damage Assessment
Following the impact of a disaster, measures will need to be implemented to undertake damage assessments
to determine the extent of the area affected, damage to homes, infrastructure and essential services and the
level of hardship being experienced in the community. QFD have a responsibility for undertaking damage
assessment of structures impacted. However, all agencies are able to contribute to damage assessments
through operational reporting (i.e. dam owners will report on storage levels, QPS will report on missing people,
Queensland Health will report on people requiring hospitalisation / medical treatment and Noosa Shire Council
will report on damage to Council owned infrastructure and the environment).




Noosa Council 2025 | Local Disaster Management Plan                               Page 59 of 73
                                                                                                  Page 77 of 141

Page 78

    Recovery




                                                      SECTION EIGHT

Noosa Council 2025 | Local Disaster Management Plan      Page 60 of 73
                                                                         Page 78 of 141

Page 79

Section 8.1
8.1    Definition of Recovery
In accordance with the Queensland Recovery Plan, disaster recovery is defined as the coordinated process
of supporting disaster-affected communities’ psychosocial (emotional and social), and physical well-being;
reconstruction of physical infrastructure; and economic and environmental restoration (including regeneration
of the natural environment, associated infrastructure and heritage sites and structures and the management of
pollution and contamination).



Section 8.2
8.2    Context for Recovery
The need for recovery may arise from a range of natural and non- natural disaster events, often providing an
opportunity to rebuild a stronger, more resilient community.
Recovery begins shortly after the response phase has begun and the impact has been identified. Recovery
can be a long, challenging and complex process and is often considered the most resource intensive and
protracted element within the context of the Prevention, Preparedness, Response and Recovery (PPRR)
framework.
Recovery is both a remedial and developmental process that focuses on building a recovered and more
resilient community. Recovery planning and operations must be sufficiently flexible to deal with the needs of
the impacted community, regardless of the nature of the disaster.
Whilst funded recovery programs under the joint Commonwealth/ Queensland-funded Disaster Recovery
Funding Arrangements have a two-year life span, it is recognised that the time it takes for a community to be
recovered will vary based on the impact of the event and the individuals in the community.



Section 8.3
8.3    Appointment of Local Recovery Coordinator
Appropriately qualified and authorised persons have been appointed by the CEO of Noosa Shire Council to
take the role of Local Recovery Coordinator (LRC) to coordinate and facilitate local recovery operations should
the need arise. The LRC and the LDC should liaise regularly to ensure that response operations support the
recovery effort and the LRC has good situational awareness to ensure their disaster recovery planning is
relevant to the community. Indicative duties of the LRC include:

   •   Working with identified agencies and the community to develop the local event-specific recovery plan.
   •   Coordinating the short to medium-term recovery to address the immediate effects of the disaster and
       develop longer-term measures as appropriate.
   •   Ensuring the local event-specific recovery plan addresses all relevant functional areas of recovery –
       human and social, economic, environment, building, and roads and transport.
   •   Performing the role of conduit between community and government
   •   Developing and implementing effective strategies for community participation and partnership in the
       recovery process.
   •   Liaising with with functional lead agency representatives at the local and district levels.
   •   Liaising with the District Disaster Management Group (DDMG) and State Recovery Coordinator
       throughout the recovery process.
   •   Providing advice to state government on the needs and responses of the affected individuals,
       communities and other sectors.
   •   Undertaking a post-operation debrief and providing a final report to the LDMG at the conclusion of
       recovery operations.



Noosa Council 2025 | Local Disaster Management Plan                               Page 61 of 73
                                                                                                  Page 79 of 141

Page 80

   •   Providing or delegating the responsibility for ongoing recovery reporting on the progress of the event-
       specific recovery plan.
A checklist for the Local Recovery Coordinator is available in Guardian IMS.



Section 8.4
8.4    Activation of LDMG Recovery Group
During the response phase, the LDMG will consider the impact of the disaster. If the event is of sufficient
magnitude, the LDMG may decide to activate its Recovery Group to coordinate recovery operations.
The Recovery Group is likely to be activated in the following circumstances:

   •   An event where significant loss or damage is sustained impacting the community, economy,
       environment and / or the infrastructure of the Noosa Shire Council area.
   •   An event that creates significant disruption to the communities’ connectedness or overwhelms local
       resources or the capacity of the community to cope or recover independently.
   •   An event that the LDMG determines has ongoing impacts and requires a coordinated and collaborative
       multi-agency approach to recovery.
   •   If requested to activate by the DDMG.


Section 8.5
8.5    LDMG Recovery Group Chairperson
The Recovery Group Chairperson is responsible for chairing the LDMG Recovery Group and for supporting
the Local Recovery Coordinators to ensure recovery efforts and activities are effectively coordinated and
implemented across the region.
A Terms of Reference is available that can be adapted to the specific circumstances of the event. 8.5
Activation Levels, Triggers & Communications
Recovery activation levels follow closely behind the response activation levels. This means that recovery
actions are triggered early in the event cycle before the disaster has occurred. The table below identifies the
recovery activation levels, triggers and communications. All public information will be undertaken in
accordance with the LDMG Public Information & Warnings Sub Plan.




Noosa Council 2025 | Local Disaster Management Plan                                Page 62 of 73
                                                                                                   Page 80 of 141

Page 81

Section 8.5
Table 8: Activation Levels, Triggers and Communications for Noosa LDMG
                                                    Triggers                                            Actions                                               Communications

                                       •   Response phase at ‘lean          •   Appointment of LRC as appropriate                        •   LDC and LRC maintain communication
                                           forward’ level of Activation     •   Potential actions and risks identified                   •   LRC and Recovery Group members on mobile remotely
  Response          Recovery                                                •   Information sharing commences
  LEAN FORWARD      ALERT                                                   •   LRC in contact with LDCC/LDC
                                                                            •   Initial advice to all recovery stakeholders

                                       •   Response phase at ‘stand         •   Monitoring of response arrangements                      •   LRC and Recovery Group members on mobile
                                           up’ level of activation          •   Analysis of hazard impact or potential impact                and monitoring email remotely
                                       •   LDCC assesses event              •   Relief and recovery planning commences                   •   Liaise with QRA and Department of Communities
                                           impact and determines if                                                                          regarding support and funding assistance
                                           Recovery Group is needed         •   Deployments for immediate relief commenced by
                                                                                recovery functional agencies                             •   Recovery Group will commence meeting for
                                       •   Immediate relief                                                                                  planning purposes
  Response          Recovery               arrangements are required        •   Recovery Group and Subgroup structures finalised along
                                                                                                                                         •   More regular reporting as required by the LRC and by
                                           during response phase                withreporting requirements                                   the Disaster District and QDMC
  STAND UP          LEAN FORWARD
                                                                                                                                         •   Community engagement and communication
                                                                                                                                             strategy developed
                                                                                                                                         •   Refer: LDMG Public Information & Warnings Sub Plan



                                       •   Immediate relief                 •   Recovery Group activated at LDCC or alternate location   •   Delivery of community engagement and
                                           arrangements continue            •   Recovery plan activated                                      community strategy
                                       •   Response phase moves to          •   Community information strategy employed                  •   LRC and LRG members involved in medium term
                                           ‘stand down’ level of                                                                             recovery continue as required
                                           activation.                      •   Participate in response debrief
                                                                                                                                         •   Functional lead agencies report to LRC/ LRG as required
                                       •   Medium term recovery             •   Transition arrangements from ‘response and recovery’
  Response          Recovery                                                    to ‘recovery’ activated including handover from LDC to
                                           commences.                           LRC
  STAND DOWN        STAND UP
                                       •   LRG arrangements are             •   Action plans for five functions of recovery continue
                                           finalised. Community returns
                                           to normal activities with        •   Community information strategies continue
                                           ongoing support as required.


                                       •   Recovery Group arrangements      •   Consolidate financial records                            •   LRC and Recovery Group members resume
                                           are finalised                    •   Reporting requirements finalised                             standard business arrangements
                                                                            •   Participate in recovery debrief                          •   Communicate extended recovery arrangements as per
                                       •   Community returns to normal                                                                       the Communications and Engagement Plan.
                                           activities with ongoing long     •   Participate in post event debrief
  Response          Recovery               term recovery support provided   •   Post event review and evaluation
                                           as required under pre-agreed
  ALERT             STAND DOWN             arrangements and processes.      •   Long term recovery arrangements transferred to
                                                                                functional lead agencies
                                                                            •   Return to core business




      Noosa Council 2025 | Local Disaster Management Plan                                                  Page 63 of 73                                                              Page 81 of 141

Page 82

Section 8.6
8.6    Recovery Group Membership
The Local Recovery Group may be comprised of the following members. Membership will be tailored relevant
to each event.


                              Table 9: Noosa Local Recovery Group Membership

          Recovery Group                                        Organisation
               Position
       Chair Deputy                  LDMG Chairperson - Councillor, Noosa Shire Council

       Local Recovery                Director Community Services, Noosa Shire Council
       Coordinator
       Secretary                     Community Services Administration Officer

       Core Members                  Coordinator Human-Social Subgroup – Community Development
                                     Manager
                                     Coordinator Infrastructure Subgroup – Project Manager
                                     Infrastructure Delivery
                                     Coordinator Economic Subgroup – Economic Development Manager
                                     Coordinator Environment Subgroup – Environmental Services
                                     Manager Communications – Community Engagement Manager
                                     Volunteer Coordinator – Libraries & Galleries Manager


       Supporting                    Department of Communities, Housing & Digital Economy
       Members /
       Advisors                      Department of State Development, Infrastructure, Local Government
                                     and Planning
                                     Department of Environment & Science

                                     Department of Transport & Main Roads

                                     Department of Energy & Public Works
                                     Other representatives appointed on an as needs basis (e.g.
                                     community representatives, business and industry representatives,
                                     etc.




Noosa Council 2025 | Local Disaster Management Plan                               Page 64 of 73
                                                                                                  Page 82 of 141

Page 83

Section 8.7
8.7    Functional Lines of Recovery
The Depending on the nature of the disaster, one or more of these five functional lines of recovery may be the
focus of recovery operations. The responsible State Lead Agencies identified below will be invited to
participate in the LDMG Recovery Group which will consider all five functional lines of recovery when planning
and undertaking recovery operations:
                              Table 10: Queensland functional lines of recovery

 Functional line of            Description                                     State Lead Agency
 recovery
 Human and Social              Focuses on supporting the emotional,            Department of Communities,
 recovery                      social, physical and psychological health       Housing & Digital Economy
                               and wellbeing of individuals, families and
                               communities following a disaster.

 Economic recovery             Focuses on rectifying the direct and indirect   Department of State
                               impacts on the economy as a result of a         Development,
                               disaster.                                       Infrastructure, Local
                                                                               Government & Planning


 Building & Assets recovery Focuses on rectifying damage and disruption        Department of Energy &
                            which inhibits the capacity of essential           Public Works
                            services and the building sector, including
                            housing, accommodation, education and
                            health facilities.
 Environmental recovery     Focuses on rectifying the impacts on the           Department          of
                            natural environment as a direct result of a        Environment & Science
                            disaster or through a secondary impact or
                            consequence.
                               Impacts to the environment may include
                               damage or loss of flora and fauna, poor air
                               quality, reduced water quality,
                               accumulation of synthetic debris on
                               beaches, land degradation and
                               contamination, as
                               well as cultural and built heritage listed place
                               issues.
 Roads and Transport           Focuses on rectifying the effects of a           Department of Transport &
 recovery                      disaster on transport networks, including        Main Roads
                               road, rail, aviation and maritime normally
                               result in difficulty accessing
                               communities and disruption to critical supply
                               chains (both in and out of the impacted
                               area). Restoration of these networks, or the
                               identification of alternatives, is a priority in
                               disaster recovery.




Noosa Council 2025 | Local Disaster Management Plan                                Page 65 of 73
                                                                                                   Page 83 of 141

Page 84

Section 8.8
8.8    Recovery Subgroups
Often a disaster will be of such a scale that all functions need to be addressed to effect recovery. To assist with
managing capacity and resourcing issues and to reflect other areas of infrastructure that Noosa Council is
responsible for i.e., water, wastewater, and waste, the Local Disaster Recovery Group (LDRG) will likely
organise itself with four Functional Recovery Subgroups to address the five lines of recovery as follows:

   •   Human and Social
   •   Economic
   •   Infrastructure
   •   Environment; and
   •   Waste
This structure is depicted in section 2.8 of this plan.
The need to establish one or all of the Subgroups is the responsibility of the LDRG and will depend wholly
upon the scale of the event and the complexity of the recovery effort.




Noosa Council 2025 | Local Disaster Management Plan                                 Page 66 of 73
                                                                                                     Page 84 of 141

Page 85

Section 8.9
8.9    Proposed Recovery Subgroup Membership
Membership will be determined in response to each event. The table below is to be used as a guide to ensure the State government functional lead agencies
for recovery as well as relevant local government elected officials and officers and non- governmental, business and community representatives are
considered as applicable to each event.

                                      Supporting Member Agencies (may be modified depending on disaster)
                   HUMAN-SOCIAL                ECONOMIC                ENVIRONMENT                       INFRASTRUCTURE
  Chairperson      Community Development       Councillor / Officer    Councillor / Officer              Councillor / Officer
                   Coordinator, Noosa Council

  State            •   DFSDSCS(Functional             •   DSDILGP (Functional    •    DETSI (Functional lead           •   DEPW (Functional lead agency)
  Government           lead agency – not                  lead agency)                agency)                          •   DTMR (Functional lead agency)
                       represented in BAU)            •   DRDMW                  •    DPI                              •   DSDILGP
                                                      •   Queensland Treasury    •    NRMMRRD                          •   Department of Education
                                                      •   DPI                    •    QHealth                          •   DFSDSCS
                                                      •   DETSI                  •    DWATSIPM                         •   QRA
                                                      •   QRA                    •    QRA
                                                      •   QRIDA                  •    DSDILGP
                                                                                 •    DTMR
  Non-             •   Australian Red Cross           •   Insurance Council of   •    Natural Resource                 •   Queensland Building
  government       •   GIVIT                              Australia                   Management bodies                    and Construction
  / Business       •   Lifeline                       •   Chamber of commerce    •    Environment and conservation         Commission
  representativ    •   Uniting Care                   •   Primary producer            organisations                    •   Insurance Council of Australia
  es               •   St Vincent de Paul                 groups                 •    Wildlife and animal protection   •   Utility owners/ operators
                   •   Local community and            •   Industry                    groups                           •   Private infrastructure
                       welfare groups                     representatives        •    Traditional owners               •   Owners
                   •   RSPCA (companion               •   Tourism Association    •    River Improvement Trusts         •   Ergon
                       animals)                       •   Agforce                •    Rural and primary producers      •   Telstra
                   •   Insurance Council of           •   Queensland Farmers     •    Water and waste service          •   Transport operators
                       Australia                          Federation                  providers
                   •   Volunteering Queensland        •   Telstra                •    Chemical and hazardous
                   •   Pomona Community                                               substance advisors.
                       House
                   •   Salvation Army




Noosa Council 2025 | Local Disaster Management Plan                                  Page 67 of 73                                                 Page 85 of 141

Page 86

Section 8.10
8.10 National Principles
The LDMG Recovery Groups will use the National Principles for Disaster Recovery to guide recovery planning,
approach, decision-making and efforts. The principles are:
                              Table 12: National Principles for Disaster Recovery

                     Principle                                                 Definition
 Understand the context                                 Successful recovery is based on an understanding of
                                                        the community context, with each community having
                                                        its own history, values and dynamics.
 Recognise complexity                                   Successful recovery is responsive to the complex
                                                        and dynamic nature of both emergencies and the
                                                        community.
 Use community-led approaches                           Successful recovery is locally led, community-
                                                        centred, responsive and flexible, engaging with
                                                        community and supporting them to move forward.
 Coordinate all activities                              Successful recovery requires a planned, coordinated
                                                        and adaptive approach, between community and
                                                        partner agencies, based on continuing assessment
                                                        of impacts and needs.
 Communicate effectively                                Successful recovery is built on effective
                                                        communication between the affected community and
                                                        other partners.
 Recognise and build capacity                           Successful recovery recognises, supports, and
                                                        builds on individual, community and organisational
                                                        capacity and resilience.




Section 8.11
8.11 Queensland Government Roles and Responsibilities
The Queensland Recovery Plan – refer pg. 14-20 identifies the role and responsibilities of the DDMG and
numerous State government stakeholders in recovery operations as follows:

   •   Queensland Disaster Management Committee (QDMC)
   •   Minister
   •   Leadership Board Sub-Committee (Recovery)
   •   State Recovery Policy & Planning Coordinator
   •   State Recovery Coordinator
   •   State Functional Recovery Groups
   •   Queensland Reconstruction Authority.




Noosa Council 2025 | Local Disaster Management Plan                            Page 68 of 73
                                                                                               Page 86 of 141

Page 87

Section 8.12
8.12 Recovery Phases
The disaster recovery process can generally be categorised into three phases (immediate, short-to-medium
term recovery and long-term recovery). The phases of recovery are depicted in Figure 16 below.




                                          Figure 16: Phases of recovery



8.12.1 Stage 1: Immediate recovery (post-impact relief and emergency)
The recovery aims to address and support the immediate needs of individuals, businesses and the community
affected by an event. This phase of recovery is challenging as it often coincides simultaneously with response
operations. It is the period after a disaster when initial “relief” services are offered to the affected community
whilst the full recovery framework is established. It is also the period when detailed recovery planning,
including damage and needs analysis is undertaken.
The likely recovery activities conducted during this phase include:
   • Impact and needs assessments commenced
   • Provision of Evacuation Centres
   • Provision of assistance to meet basic human needs
   • Restoration of power, water and communication commenced
   • Emergency funding, shelter, clothing and food distribution
   • Roads re-open
   • Psychological first aid, and personal support provided
   • Consideration of Recovery Hubs
   • Consideration of managing spontaneous volunteers and goods and services donations – refer Logistics
        Sub Plan.
The transition from the response and short-term relief operations to the next phase of recovery needs to be
carefully managed by the LDC and LRC working together. The transition will be characterised by the approval
of the Recovery Event Action Plan that will be prepared in Guardian IMS for approval by the Chairperson of
the LDMG Recovery Group.



Noosa Council 2025 | Local Disaster Management Plan                                 Page 69 of 73
                                                                                                    Page 87 of 141

Page 88

The Community Liaison Role working in the LDCC also supports short term relief and recovery – refer LDCC
Sub Plan.



8.12.2 Stage 2: Short-to-medium term recovery (re-establishment, rehabilitation
and reconstruction)
The phase of recovery continues the coordinated process of supporting affected communities in the
reconstruction of physical infrastructure, re-establishment of the economy and rehabilitation of the
environment. During this phase, support for the emotional, social, and physical wellbeing of those affected
continues. The recovery activities at this stage will assist the affected community to return to a state of
normality, although the community may experience significant change resulting from the event.
The likely recovery activities conducted during this phase include:

   •   Impact and needs assessments finalised
   •   Essential service repaired and restored
   •   Key transport routes are operational
   •   Roads repairs underway
   •   Supply chains are returning to normal
   •   Schools reopen
   •   Funding to support recovery identified
   •   Insurance assessments underway
   •   Community support mechanisms operational
   •   Community development programs underway to reunite community
   •   Environmental restoration and biosecurity
   •   programs identified and underway
   •   Support for business is available
   •   Development of exit strategies.



8.12.3 Stage 3: Long-term recovery (restoration, rebuilding, reshaping and
sustainability)
The term recovery is characterised by the ongoing restoration and rebuilding of physical infrastructure,
restoration of the economy and of the environment, and reshaping to support sustainability of recovery
measures in the longer term. During the transition phase, specialist recovery workers leave affected
communities and systems start to wind down as normal community development and business as usual
processes return. Long term recovery may last many months and in some cases many years after the event.
The likely recovery activities conducted during this phase include:

   •   Assets are restored, improved and operational
   •   Rebuilding phase finalised
   •   Longer term psycho-social support strategies for individuals, families and communities are established
       and operational
   •   Event anniversaries are acknowledged
   •   appropriately
   •   Key milestone achievements are acknowledged and celebrated
   •   Exit strategies are implemented.




Noosa Council 2025 | Local Disaster Management Plan                               Page 70 of 73
                                                                                                  Page 88 of 141

Page 89

Section 8.13
8.13 Monitoring & Evaluating Framework
The National Monitoring and Evaluation Framework for Disaster Recovery Programs provides a
consistent approach to evaluating individual recovery programs for their effectiveness in achieving desired
outcomes and providing valuable learnings to improve the design and delivery of subsequent programs.



Section 8.14
8.14 Communication & Reporting
All public information released as part of recovery operations will be managed in accordance with the LDMG
public Information & Warnings Sub Plan and Noosa Council’s media policy.
Internal reporting will take place as per Noosa Council’s standard operating arrangements e.g. reports to
Council.
Regular situational reporting will take place across Queensland’s Disaster Management Arrangements
throughout recovery operations. The schedule of SITREP reporting will be determined by the LDMG Recovery
Group Chairperson in negotiation with the District and State Recovery Groups. A Recovery SITREP template
is available in Guardian IMS.
Requests for resources will be escalated via the District Disaster Management Group (DDMG). Refer to the
Logistics Sub Plan.



Section 8.15
8.15 Finance
Financial management during recovery operations will be in accordance with the LDMG Financial
Management Sub Plan.



Section 8.16
8.16 Event Specific Recovery Plan
The Queensland Reconstruction Authority (QRA) have developed a process to develop an event-specific Local
Recovery Plan. Local recovery templates can be found on QRA’s website.
The LRC is responsible for working with the LDMG Recovery Group (where activated) to develop the plan and
then for obtaining endorsement for the event-specific recovery plan from the LDMG. If developed, an event-
specific Recovery Plan should be adopted by Noosa Shire Council.
Following adoption, the plan should be uploaded to the Council website and promoted to the local community
on a regular basis. The LRC is responsible for working with the LDMG Recovery Group (where activated) to
develop the plan and then for obtaining endorsement for the event-specific recovery plan from the LDMG.
If developed, an event-specific Recovery Plan should be adopted by Noosa Shire Council. Following adoption,
the plan should be uploaded to the Council website and promoted to the local community on a regular basis.




Noosa Council 2025 | Local Disaster Management Plan                               Page 71 of 73
                                                                                                  Page 89 of 141

Page 90

Section 8.17
8.17 Recovery Hubs
Recovery Hubs are established to provide a range of services to facilitate recovery including welfare, support,
financial and emotional recovery services. Recovery Hubs are typically managed by the Department of
Communities, Housing & Digital Economy with support from the LDMG where necessary.
Recovery Hubs may be centralised or may need to be mobilised and conducted in a ‘Pop Up’ fashion to suit
the need of local communities and the disaster.
Recovery Hub agencies will vary dependent on the type of event and impacts experienced. Agencies may
include but are not limited to:

   •   Department of Families, Seniors, Disability Services and Child Safety
   •   Noosa Council Community Development or Customer Service Team Member
   •   Noosa Council Infrastructure Services team member
   •   Lifeline
   •   Red Cross
   •   Insurance Council of Australia
   •   Local Service providers.




Noosa Council 2025 | Local Disaster Management Plan                               Page 72 of 73
                                                                                                  Page 90 of 141

Page 91

                                                  9 Pelican Street, Tewantin
                                                  PO Box 141, Tewantin QLD 4565
                                                  (07) 5329 6500
                                                  Noosa.qld.gov.au




                                                  9 Pelican Street, Tewantin
                                                  PO Box 141, Tewantin QLD 4565
                                                  (07) 5329 6500
                                                  Noosa.qld.gov.au
Noosa Council 2025 | Local Disaster Management Plan                               Page 73 of 73
                                                                                                  Page 91 of 141

Page 92

GENERAL COMMITTEE MEETING                                                           19 JANUARY 2026


8.2          RESPONSE TO NOTICE OF MOTION - TRIAL OF REMOTE RESCUE
             TUBES/LIFE RINGS AT UNPATROLLED BEACHES


Author             Acting Local Laws and Environmental Health Manager, Clint Irwin
                   Local Laws | Development and Regulation Department
Index              35.01 Management of Lifeguard Contract/ 46.15 Use of Council Land/ 46.16
                   Use of State Land
Attachments        1.   Attachment 1 Notice of Motion


EXECUTIVE SUMMARY
Following a Notice of Motion tabled at the September 2024 Ordinary Meeting, Council requested a
report on the feasibility of installing remote rescue tubes and life rings at unpatrolled beach locations,
to determine whether a trial should be conducted.
Public rescue devices have been promoted as an effective intervention to reduce drowning risk by
providing flotation until help arrives. Several NSW Councils have implemented similar programs and
Surf Lifesaving Queensland, as the State’s peak coastal safety authority, has commenced a
statewide rollout. Community groups have also advocated for similar installations within Noosa Shire.
While trials elsewhere have 'demonstrated lifesaving potential', it should be acknowledged
installation of this equipment by Council gives rise to consideration of duty of care, liability exposure,
precedent, cost implications of program expansion, risk appetite and tolerance, and reputational risk.
While the likelihood of a serious incident such as a bystander death is low, the potential
consequences for Council should a serious incident occur are significant. Proceeding with a trial
would require Council to accept a higher risk appetite and tolerance than its current policy position
and a broader roll out would involve significant cost.
Given Surf Lifesaving Queensland’s statewide roll out and the trial currently underway in the Noosa
National Park, it is recommended Council defer operating its own trial to facilitate monitoring and
assessment of existing trials and support SLSQ and surf clubs with their funded and managed
initiatives in accordance with Option 2 of the report.
This approach mitigates immediate legal, financial, and operational risks, aligns with Council’s zero-
tolerance position on health and safety and minimal tolerance for legal compliance risks, and
supports the principles of evidence-based decision making and good governance.


RECOMMENDATION
That Council
A. Note the report by the Acting Local Laws and Environmental Health Manager to the General
   Committee dated 19 January 2026
B. Support Surf Lifesaving Queensland as the State’s peak coastal safety authority and Surf
   Lifesaving Clubs with their funded and managed roll out programs; and
C. Defer the implementation of a Council managed trial of remote rescue tubes and life rings at
   unpatrolled beach locations until:
        1.      The risks associated with current trials and any emerging issues at Noosa National
        Park, as well as programs elsewhere in Australia and overseas, have been critically evaluated
        by Council; and
        2.      An appropriate evidence-based management strategy has been developed to
        manage those risks and issues (detailed as Option 2 in the report).




                                                                                                   Page 92 of 141

Page 93

GENERAL COMMITTEE MEETING                                                            19 JANUARY 2026



REPORT
The purpose of this report is to investigate the feasibility of Council installing remote rescue tube/life
rings to determine whether a trial should be conducted.
1. Background
A Notice of Motion (NoM) was tabled at the September 2024 Ordinary Meeting, requesting an
investigation into the feasibility of installing remote rescue tubes and life rings at selected unpatrolled
beach locations. The proposal included the possibility of conducting a single-site trial prior to any
broader implementation, see Attachment 1.
The NoM sought to address the risk of drowning incidents in unpatrolled areas or outside of patrolled
areas by introducing self-service rescue tubes. It referenced a successful trial in northern NSW and
requested:
Review of the existing trial that was conducted in NSW, identification of potential sites, an analysis
of the potential cost, a comprehensive breakdown of all identified risks and a review of potential
stakeholders and partners.
Council requests the CEO to:
•   Report on Feasibility: Report back on the feasibility of conducting a remote rescue tube/life ring
    trial at unpatrolled locations with high visitation. This report should include data on visitation
    numbers at these locations, particularly at Sunrise Beach and North Peregian Beach.
•   Consult Insurers: Consult with Council’s insurers to ensure support for the initiative and confirm
    that no additional liability would be incurred should the units be damaged, stolen, or an incident
    occur while using the rescue tubes.
•   Seek Expert Insights: Contact Greg Hackfath, Team Leader of Lifeguard Services at Coff’s
    Harbour, who pioneered a similar project, for insights and guidance.
•   Explore Emergency Beacons: Explore using Surf Lifesaving Queensland’s (SLSQ) emergency
    beacons with the rescue tubes/life rings. This would allow beachgoers to contact emergency
    response by pressing a button, and the tubes/life rings would have clear location markings,
    including access numbers, to assist emergency responders.
The NoM provides the following background information to support consideration of a trial:
•   Rescue tubes are used widely across Australia, Europe, central and northern NSW, Hawaii, New
    Zealand, Zambia, Denmark and Germany.
•   The global adoption of rescue tubes and life rings highlights the need for Queensland to
    implement similar measures for unpatrolled and remote areas.
•   The initiative has strong support from ocean affiliated community organisations Noosa
    Boardriders Club, Noosa Malibu Club, Noosa World Surfing Reserve (NWSR), Noosa Surf
    Club.
Since the commencement of the Coffs Harbour remote rescue tube trial in 2019, the program has
received strong support, and no incidents of vandalism or bystander drownings have occurred.
See Figure 1 for typical installation:




                                                                                                    Page 93 of 141

Page 94

GENERAL COMMITTEE MEETING                                                         19 JANUARY 2026




Figure 1 – City of Coffs Harbour Remote Rescue Tube Installation




Figure 2 – Ballina Shire Installation

2. Evidence supporting public rescue equipment
•   Between 2004 and 2022, there were 80 deaths of bystanders attempting to rescue someone on
    the coast, an average of five deaths each year. Most rescuers were male (83%), 40-54 years old
    (41%), and were rescuing a family member or loved one, usually a child under the age of 18. Rip
    currents were a significant factor in three-quarters of fatal bystander incidents (73%). 97% did
    not use a flotation device when they attempted the rescue. Providing a flotation device (i.e.,
    something that floats – e.g., a surfboard, bodyboard, angel ring, rescue tube, esky lid) to a
    drowning patient is a priority intervention that interrupts the drowning process and is crucial for
    mitigating effects on rescuer safety – Source https://beachsafe.org.au/surf-safety/bystander-
    rescue
•   The key to returning safely from a bystander rescue is bringing a flotation device. There have
    been no bystander rescue drownings when a flotation device has been used. On the flip side,
    every person who died in a rescue attempt between 2012 and 2022 did not have a flotation
    device,   according     to    the   Water    Safety    New     Zealand      Drown     Base   -
    Source https://www.rnz.co.nz/news/top/535829/hey-dad-don-t-drown-saving-your-kid-this-
    summer




                                                                                                Page 94 of 141

Page 95

GENERAL COMMITTEE MEETING                                                       19 JANUARY 2026


•   SLSQ is leading the implementation of standard public rescue tube boxes as an approach to
    drowning prevention in Queensland. The installation of publicly accessible rescue equipment
    aims to bridge this gap by giving bystanders a simple flotation aid that can be deployed in the
    critical minutes before emergency services arrive. International examples have demonstrated
    the value of this approach. Hawaii has led the way, with more than 200 rescue tube stations
    installed across the islands, directly credited with saving over 150 lives – Source - Coast Safe
    Report 2024/2025, page 32.
3. Noosa National Park trial
On 20 May 2025, Council was notified by SLSQ that QPWS had provided written approval to NWSR
to trial 4 rescue tubes in the Noosa National Park. The locations are proposed between Granite Bay
and First Point.
4. Noosa Shire Lifesaving Services
Noosa Council works closely with SLSQ and affiliated surf lifesaving clubs to deliver lifesaving
services to the community. SLSQ is recognised as the State’s peak coastal safety and rescue
authority. An overview of services provided to the community is provided below:
Surf Lifesaving Clubs – Three lifesaving clubs operate within Noosa Shire which include Noosa
Heads, Sunshine Beach and Peregian Beach. These clubs operate on a seasonal basis between
the September school holidays through to the May long weekend.
Lifeguard Services – SLSQ provide year-round services at Noosa Main Beach, Noosa Main Beach
West, Sunshine Beach and Peregian Beach as well as seasonal services at Peregian and Sunrise
Beach via formal agreement.
Support Services – SLSQ enhances coastal safety through additional resources, including:
     •   State Operations Communication Centre – Centralised coordination and monitoring.
     •   Waverunner Patrols – Proactive patrols and rapid response capability for in-water incidents.
     •   Westpac Helicopter Rescue Service – Routine patrols and aerial support for emergency
         situations.
Beach Signage – There are 67 formal beach access points within Noosa Shire, spanning from the
northern Noosa North Shore boundary to southern Peregian Beach. Each access point features
SLSQ endorsed safety signage to inform and protect beach users.


Cameras and Emergency Beacons
•   SLSQ has implemented the Coastal Safety Network (CSN) to reduce incident risk through
    strategic installation of cameras and emergency response beacons at high-priority locations.
    Current installations include:
    a) Noosa North Shore Campground – Camera and emergency response beacon
    b) Alexandria Bay – Emergency response beacon.
•   A dedicated CCTV network, monitored 7 days a week by the State Operations Communication
    Centre, provides real-time surveillance and facilitates rapid emergency response.


5. Current SLSQ and Surf Club Approaches to Rescue Tubes
The NoM highlights the need for Queensland to implement similar measures for unpatrolled and
remote areas.
Response: SLSQ has confirmed plans to roll out 30 public rescue tube boxes on Queensland
beaches. Planned installation sites include:
•   Alexandra Headland




                                                                                              Page 95 of 141

Page 96

GENERAL COMMITTEE MEETING                                                       19 JANUARY 2026


•   Kings Beach
•   Mooloolaba
•   Kurrawa
•   Northcliffe
•   Burleigh
•   Currumbin
•   North Stradbroke Island (Frenchmans Beach)
•   Etty Bay
•   Hervey Bay
•   Bundaberg; and
•   Tannum Sands.
These installations will complement existing sites at Noosa Main Beach, Tallebudgera Creek and
Marcoola Beach.
6. Feasibility of Trial at Unpatrolled Locations with High Visitation
The NoM requests a report on the feasibility of conducting a remote rescue tube/life ring trial at
unpatrolled locations with high visitation. This report should include data on visitation numbers at
these locations, particularly Sunrise Beach and North Peregian Beach.
Response: The findings presented in this report collectively inform the feasibility of the proposed
rescue tube/life ring trial. However, accurate visitation statistics for unpatrolled locations are
generally not available, due to the absence of monitoring technology and consistent patrolling
presence to record visitation. Further discussion will be undertaken with SLSQ to progress
unpatrolled locations monitoring and in particular for Sunrise Beach and North Peregian Beach.
7. Expert Insights – City of Coffs Harbour
The NoM requests Council officers contact Greg Hackfath, Team Leader of Lifeguard Services at
Coffs Harbour, who pioneered a similar project, for insights and guidance.
Response: Mr Hackfath is no longer employed by the City of Coffs Harbour, however discussions
were held with the Section Team Leader, Community Facilities who provided the following insights:
     •   Safety Record: No reported drownings or injuries involving use of rescue tube equipment.
     •   Deployment: 86 rescue tube boxes installed across 36 beaches, supported by a funding
         partnership with Rotary.
     •   Maintenance: No dedicated maintenance budget or asset renewal plan currently in place;
         officers intend to develop these frameworks.
     •   Inspection Program: A formal inspection schedule is proposed for future implementation.
     •   Management: Equipment is currently monitored through community reporting.
     •   Durability: No incidents of vandalism or theft; boxes have proven resilient to environmental
         conditions.
     •   Environmental Impact: Severe dune erosion has required repositioning of some units.
     •   Community Response: Initiative has been positively received by the local community.
     •   Risk Management: The risk profile has been accepted by the NSW Statewide Mutual
         Insurance Program.




                                                                                              Page 96 of 141

Page 97

GENERAL COMMITTEE MEETING                                                          19 JANUARY 2026




8. Integration of Emergency Beacons with Rescue Tubes/Rings
The NoM requests Council explore the possibility of using SLSQ’s emergency beacons with rescue
tubes/rings. This would allow beachgoers to contact emergency response by pressing a button, and
the tubes/life rings would have clear location markings, including access numbers, to assist
emergency responders.
Response: SLSQ has advised the planned upgrade of the Alexandria Bay emergency beacon will
incorporate a rescue tube box mounted on the beacon pole as a combined unit. Furthermore, SLSQ
is investigating additional integration opportunities across Queensland.
9. Legal and Insurance Considerations
Legal
The NoM rationale for the rescue tube program is clear but the program would create a liability risk
for Council if not undertaken with care and diligence. The starting point of consideration for potential
liability is identification of Council’s duty of care. Council owes a duty of care to those individuals
“closely and directly affected” by Council’s actions including:
     •   Persons for whose benefit rescue tubes are provided (swimmers in distress).
     •   Persons who may use the equipment (bystanders/Good Samaritans).
In essence, Council must take reasonable steps to:
     •   Ensure equipment is fit for purpose - Meets Australian Standards (e.g., buoyancy, tensile
         strength, durability).
     •   Provide clear instructions and warnings - How to use and how not to use the devices and
         warnings of dangers inherent in rescue attempts and site-specific hazards (e.g., rips,
         submerged obstacles).
     •   Educate users - Signage at the site and supplementary information (e.g., website videos,
         public awareness campaigns).
     •   Maintain infrastructure - Regular monitoring of cabinets, signage, and equipment to prevent
         misuse, vandalism, or absence of rescue gear.
No general legal duty exists for bystanders to rescue a person in Australia (except NT Criminal
Code). However, once a rescue attempt begins, the rescuer owes a duty of care to the person in
distress and take reasonable care in the attempt. Council should also warn that attempting a rescue
creates legal and personal risk.

Insurance and Liability
The NoM requests consultation with Council’s insurers to ensure support for the initiative and confirm
that no additional liability would be incurred should the unit be damaged, or stolen, or an incident
occur while using the rescue tubes
Response: Council's liability for compensation arising from Council's involvement in Council
activities and functions (including the supply and installation of rescue tubes) is covered under the
liability cover provided pursuant to Council's LGM Liability membership subject to the Scheme Rules
and relevant Wording.

Condition 5.7 of the Protection Wording notes that Council must take all reasonable precautions to
prevent personal injury and damage to property and the onus is on Council to take reasonable
precautions and a robust risk assessment is noted as a critical risk control measure. A more detailed
risk management analysis is discussed later in this report.




                                                                                                 Page 97 of 141

Page 98

GENERAL COMMITTEE MEETING                                                           19 JANUARY 2026


10. Measures of Success and Failure
There are numerous references in Australia and internationally indicating that rescue tubes play a
critical role in breaking the “chain of drowning” and contributing to “successful trials.” However, there
are currently no widely accepted or readily available benchmarks for measuring success or failure
of such trials. To address this gap, the following proposed measures could be used by Council to
evaluate a trial:
Measures of success
•   Number of lives saved during the trial period
•   No bystander drownings or injuries associated with equipment use.
•   Positive feedback from the community, beachgoers and community groups
•   Equipment remains in place without incidents of vandalism or theft
•   Maintenance costs remain within allocated budget
•   No insurances claims or litigation against Council
Measures of failure
•   A rescuer is injured or dies during an attempted rescue.
•   Reputational damage to Council resulting from injury or loss of life
•   Equipment fails during a rescue attempt.
•   Equipment is vandalised, stolen, or subject to frequent misuse.
•   High maintenance costs or logistical challenges in monitoring and upkeep.
•   Council incurs legal liability due to incidents involving rescue tubes.
•   Negative feedback from stakeholders or the public.
•   Perception that Council acted prematurely or irresponsibly.
•   Media or public criticism following an incident or perceived failure.
•   Trial deemed ineffective or poorly managed.
A trial assessment should also incorporate further empirical evidence and this could include the
following:
     1. Was there evidence of cabinets encouraging swimming outside patrolled areas, creating a
        false sense of security?
     2. Did the remote rescue tubes dilute life-saving authorities long standing message: ‘Swim
        between the Flags?’
     3. Did the trial involve bystanders retrieving a rescue tube and flippers, securing the victim and
        bringing them to shore?
     4. Were rescues performed in varying surf conditions and at what distance from the shore?
     5. Who performed the rescues that occurred - off duty lifesavers, lifeguards, surfers or others?
     6. How many rescues were performed by random individuals and were those individuals
        strong swimmers?
     7. Did the rescuer perform the rescue alone or with assistance from others?
     8. Did the availability of a rescue tube embolden individuals to attempt the rescue when they
        might otherwise have stayed out of the surf?




                                                                                                  Page 98 of 141

Page 99

GENERAL COMMITTEE MEETING                                                        19 JANUARY 2026




11. Enterprise Risk and Opportunity Management Policy
At its September 2024 Ordinary Meeting, Council adopted the Enterprise Risk and Opportunity
Management Policy. This Policy articulates Council’s overarching approach to managing risks and
identifying opportunities. It forms part of a broader framework of Risk and Opportunity Management
documents designed to support informed decision-making and strategic planning.
A key feature of the Policy is the concept of Risk Appetite, which refers to the amount and type of
risk Council is willing to accept, absorb, or retain in pursuit of its objectives and when making both
strategic and operational decisions. The Policy includes a series of categorised Risk Appetite
Statements and corresponding Risk Tolerance Statements, which serve as tools and guides for
decision-making and planning.

Council’s risk appetite approach seeks to minimise exposure across all risk categories. Specifically:
Health and Safety Risk Appetite Statement
Council has no appetite to take risks that do not adequately prioritise the safety of our workforce,
volunteers, contractors and/or members of the community
Health and Safety Risk Tolerance Statement
Council will not tolerate activities that result in reasonably foreseeable and preventable injuries or
illnesses to our community or employees
Legal and Compliance Risk Appetite Statement
Council will continue to develop, implement, maintain and review a strong governance framework.
Council will make decisions that align to its corporate goals, policies and/or strategies
Legal and Compliance Risk Tolerance Statement
Council will not tolerate failure to consider expert/professional legal advice


12.       Employees Responsibility Under the Policy
Council officers have a number of responsibilities under the Policy which include:
      •   Adhering to the Enterprise Risk and Opportunity Management Policy,
      •   Maintaining an awareness of their operational environment as well as current and potential
          risks and opportunities, particularly in their area of expertise and industry,
      •   Identifying new and emerging risks and applying the risk and opportunity management
          process in their area of work, including regular review, ownership, monitoring, escalation
          and reporting, and
      •   If an employee is identified as a risk owner, then they are required to manage and monitor
          the risk.
13. Residual Risk Rating.
Using Table 1 below, Council’s risk assessment procedure includes determining the residual risk
rating:


Table 1 – Residual Risk Rating Calculator




                                                                                               Page 99 of 141

Page 100

GENERAL COMMITTEE MEETING                                                                    19 JANUARY 2026




14.       Risk Assessment
Council’s risk assessment procedure includes undertaking a risk assessment of identified risks using
the calculator above. Some of the key risks are included in Table 2 below:
Table 2 – Risk Assessment of Identified Key Risks
 Risk                 Risk Categories        Control             Likelihood   Consequence   Appetite
 Description                                 Measures            Rating
                                                                                            Compliance
 Bystander            - Reputational         - Ensure tubes      Rare         High          ☐Y ☒ N
 fatality or injury                          are   fit   for
 as a result of       -   Health       and   purpose
 using Council        Safety
 supplied                                    -        Provide
 equipment                                   proper
                                             instruction on
                                             how to use the
                                             tubes
                                             - Warnings on
                                             rescue     box
                                             indicating that
                                             you must be a
                                             strong
                                             swimmer      to
                                             use equipment
 Litigation           -  Legal         and   -Insurance          Possible     High          ☐Y ☒ N
 against Council      Compliance             coverage for
                                             activities within
                      - Finance              Council scope
                      - Reputational         and          risk
                                             appetite
 Damaged,             -   Health       and   -Regular            Possible     High          ☐Y ☒ N
 missing rescue       Safety                 inspection
 equipment                                   regime        to
                                             ensure
                                             equipment      is




                                                                                                         Page 100 of 141

Page 101

GENERAL COMMITTEE MEETING                                                            19 JANUARY 2026


 Risk               Risk Categories   Control         Likelihood   Consequence     Appetite
 Description                          Measures        Rating
                                                                                   Compliance
                                      available and
                                      functional



Discussion
The risk assessment indicates each identified risk falls outside Council’s current risk appetite. While
the likelihood of these risks occurring ranges from Rare to Possible, the potential consequences are
assessed as High and could arguably be considered Extreme in the event of a bystander fatality,
noting if the likelihood was assessed as Likely, the overall rating could escalate to Extreme.
As discussed, Council’s adopted position for risk appetite and tolerance is as follows:
      •    Zero tolerance for health and safety impacting the community; and
      •    Zero to minimal tolerance for legal and compliance risks.
If Council were to adopt a higher risk tolerance position, this would require a formal adjustment to its
risk appetite and tolerance levels. Such a shift must be supported by comprehensive mitigation
strategies, robust governance and accountability frameworks and enhanced monitoring and
reporting systems.
These measures are essential to ensure that any increase in risk appetite does not compromise
community safety or expose Council to unacceptable legal, financial, or reputational consequences.

15.       Options
Option 1: Not installing rescue tubes/life rings now or into the future
Council does not install rescue tubes/life rings now or into the future.
This option involves Council not installing rescue tubes/life rings for a trial period or at any time in
               the future on Council owned or managed land
Opportunities
      a. Avoids installation of infrastructure that may carry legal, operational, or reputational risks for
         Council.
      b. Reinforces the long-standing “swim between the flags” message, which is supported by Surf
         Life Saving Queensland and widely recognised as the safest strategy to protect beachgoers.
      c. Addresses insurance and liability risks and exposure to liability associated with bystander
         rescues, equipment misuse, or failure given there is no installed equipment.
      d. Avoids rate payer funded capital and operational expenditure on equipment purchase,
         installation, maintenance, monitoring and replacement of damaged or stolen equipment.
      e. Aligns with the position adopted in Council’s Enterprise Risk and Opportunity Management
         Policy.
Risks
      a. Creates a perception Council is overly risk adverse and not doing enough to protect lives.
      b. Potential reputational risk to Council if preventable risk occurs and lives are lost.
      c. A drowning or serious injury could occur at an unpatrolled location where rescue equipment
         might have made a difference.
      d. Support from community organisations and residents may lead to increased lobbying and
         criticism of Council’s decision.




                                                                                                  Page 101 of 141

Page 102

GENERAL COMMITTEE MEETING                                                         19 JANUARY 2026


    e. Council may miss the opportunity to be seen as a leader in beach safety innovation and
       community responsiveness.
    f.   The community may interpret Council’s decision as a lack of responsiveness, hiding behind
         ‘red tape’ and an unwillingness to trial new ideas.
    g. A firm decision to decline installation now and into the future may limit Council’s ability to
       respond to changing conditions, new technologies, evolving community expectations and
       legal considerations.
    h. Declining the initiative may reduce opportunities to collaborate with local surf clubs and
       SLSQ.
Option 2: Council does not install rescue tubes/life rings to allow further review of trials at
other locations and supports rescue tube installations by surf clubs and SLSQ
Council does not install rescue tubes/life rings on Council owned or managed land and monitors
trials elsewhere while supporting surf clubs and SLSQ equipment roll outs.
This option involves Council not installing rescue tubes/life rings on Council owned or managed land
to allow further review of the effectiveness of rescue tube installations within Noosa National Park
and other locations and supporting the roll out of rescue tubes by surf clubs and SLSQ
Opportunities
    a. Allows Council to adopt a precautionary approach to implementing rescue tubes/life rings.
    b. Allows Council to monitor and assess trial outcomes in Noosa National Park, City of Coffs
       Harbour, and other jurisdictions to inform future decisions.
    c. Supports an evidence based and informed decision-making approach.
    d. Does not impede surf clubs or SLSQ from installing rescue tubes and enhancing emergency
       response capabilities in unpatrolled areas.
    e. Reduces Council’s exposure to liability associated with bystander rescues, equipment
       misuse, or failure as installations are not owned or managed by Council.
    f.   Avoids rate payer funded capital and operational expenditure for equipment purchase,
         installation, maintenance, monitoring and replacement.
    g. Prevents ad-hoc responses to community requests by requiring observation and
       assessment of trial results before action.
    h. Aligns with the position adopted in Council’s Enterprise Risk and Opportunity Management
       Policy.
Risks
    a. Delaying action may result in missed opportunities to prevent drownings or serious incidents
       at unpatrolled beaches where a rescue tube might have been situated.
    b. Council may be seen as abnegating its responsibilities and taking a reactive rather than a
       proactive approach to water safety.
    c. Community groups and surf clubs that have expressed strong support may feel ignored,
       potentially eroding trust and collaboration.
    d. By not participating in early trials, Council could be seen as a laggard and miss opportunities
       to influence regional or state-level coastal safety initiatives.
    e. If a drowning occurs during the review period, Council may face criticism for not acting
       sooner.
    f.   Delaying a local trial means missing the chance to gather site-specific data that could inform
         better future decisions.




                                                                                               Page 102 of 141

Page 103

GENERAL COMMITTEE MEETING                                                           19 JANUARY 2026


      g. Although surf clubs and SLSQ will manage their equipment, Council may still bear legal
         responsibility or reputational risk due to lease arrangements, perceived oversight
         responsibilities and duty of care - especially if equipment fails or contributes to injury or
         death.
      h. Community groups may push for installations beyond surf clubs, leading to increased
         lobbying and potential criticism if Council is seen as limiting access to life-saving tools - as
         seen in Clarence Valley, Source https://arr.news/2024/05/29/rescue-tubes-at-popular-
         swimming-spots/
Option 3: Council undertakes a trial at a single unpatrolled/remote location and supports
            community requests for expansion
This option involves Council undertaking its own trial at a remote, unpatrolled location and if
              successful approving future requests for more rescue tube installations.
Opportunities
     a. May help to reduce drowning incidents.
      b. Responds positively to requests from community groups
      c. Demonstrates Council’s commitment to mitigating risk of surf drownings.
      d. Enables Council to collect its own site specific data.
      e. Provides an opportunity to enhance public awareness through signage, surf safety
         messaging, instructions and an incident reporting system.
      f.   A single-site trial allows for close monitoring, refinement of procedures, and lessons learned
           before considering broader implementation.
      g. Positions Council as a proactive leader in coastal safety, potentially influencing regional or
         state-level approaches.
      h. May identify gaps in signage, public awareness, or emergency response coordination,
         leading to broader safety improvements.
      i.   A well-managed trial could generate positive media coverage and reinforce Council’s
           commitment to public safety.
Risks
      a. There is currently no industry recognised framework for evaluating the success or failure of
         a trial (refer to Measures of Success and Failure).
      b. Without clear site selection criteria, Council may face pressure from community groups to
         expand the program to unsuitable or random locations.
      c. Conducting a trial without underpinning empirical evidence, a robust risk assessment and
         satisfactory mitigation measures may expose Council to liability if equipment is misused,
         fails during an emergency, or if a bystander is injured or killed while attempting a rescue.
      d. If the trial is perceived as poorly planned, inadequately monitored, or results in a negative
         outcome, Council’s reputation for responsible public safety management could be
         damaged.
      e. Ongoing monitoring, maintenance, and evaluation of trial sites will require dedicated
         resources. If the program expands, this could place a significant burden on Council staff
         and budgets (refer to Finance section for potential impacts).

16.        Conclusion
Public rescue devices have been recognised within the aquatic safety industry as an effective
intervention to ‘break the chain of drowning’ by providing flotation until help arrives. SLSQ, as the
State’s peak coastal safety authority, has commenced a statewide roll out of rescue tube boxes and
community groups have advocated for similar installations within Noosa Shire.



                                                                                                 Page 103 of 141

Page 104

GENERAL COMMITTEE MEETING                                                        19 JANUARY 2026


While there has been some community support for the roll out of this equipment, installation and
management of this equipment by Council enlivens issues such as duty of care and liability
exposure, precedent and cost implications if the program expands, Council’s adopted risk appetite
and tolerance, and reputational risk.

A Council managed trial requires Council to accept a higher risk appetite and tolerance than its
current adopted position which makes it essential to adopt robust mitigation measures. While the
likelihood of a bystander drowning in a rescue attempt is low, the potential consequences of such
an event would be significant for Council.
Deferring installation on Council-managed land while supporting SLSQ and surf clubs in their funded
rollout provides a balanced and prudent approach. This strategy enables Council to monitor
outcomes from existing trials and gather empirical evidence before committing resources to a rescue
tube program. It also mitigates immediate legal, financial, and operational risks and aligns with
Council’s zero tolerance position on health and safety and zero to minimal tolerance for legal
compliance risks and preserves flexibility for future decisions based on proven effectiveness.
Although this approach carries potential reputational risk if a drowning occurs where a rescue tube
might have been situated, it ensures decisions remain informed, evidence-based, and consistent
with Council’s Enterprise Risk and Opportunity Management Policy.
In summary, it is recommended Council continue to monitor trials and programs elsewhere and
support SLSQ and surf clubs in their funded rescue tube rollout initiatives, as detailed in Option 2
of this report.


Link to Corporate Plan
Theme No. 2 - Liveability
Objective 2.8 – Provide opportunities to enhance the health, wellbeing and safety of our
communities.
Departments consulted:




Previous Council Consideration
Ordinary Meeting Minutes dated 19 September 2024
TRIAL OF REMOTE RESCUE TUBES/LIFE RINGS AT UNPATROLLED BEACHES
That Council request the CEO to provide a report to Council that investigates the opportunity to
install Remote Rescue Tubes/Life Rings at selected unpatrolled beach locations with the possibility
of conducting a trial of a single site prior to any further action.


Finance
The 2024/2025 Coast Safe report (page 32) states the advantages of rescue tube boxes lie in their
simplicity, affordability and potential impact.. and they are low cost compared to the societal and
economic burden of a single fatality. Table 3 identifies the cost to manage a rescue tube trial at a
single location. Rescue tubes are housed in a rescue tube box which includes a rescue tube,
adjustable set of fins, bleeding kit and resuscitation mask. Monitoring costs are not included given
singular site. The figures include the following assumptions:
•   3% CPI annual indexation.
•   Capital costs included purchase of box in year 1 and replacement in years 4, 7 and 10.
•   Equipment in each box includes rescue tube, adjustable set of fins, bleeding kit and resuscitation
    mask.




                                                                                              Page 104 of 141

Page 105

GENERAL COMMITTEE MEETING                                                          19 JANUARY 2026


•   Monitoring of rescue box is proposed to be undertaken on a minimum weekly basis.
Table 3 – 10 Year Cost Summary for Rescue Tube Boxes – Single Location




Table 4 identifies the cost of a broader scale roll out and is notionally based on 30 locations out of a
total of 67 formal beach accesses. The figures include the following assumptions:
•   3% CPI annual indexation
•   Capital costs include purchases of 10 boxes in Years 1, 2, and 3.
•   Equipment in each box includes rescue tube, adjustable set of fins, bleeding kit and resuscitation
    mask.
•   3 yearly box replacement schedule (10 per year)
•   Maintenance, monitoring, and vandalism costs are indexed annually at 3% CPI.
•   Monitoring of rescue boxes is proposed to be undertaken weekly at 30 locations between
    Sunshine Beach and Peregian to ensure each unit is serviceable and readily available.
•   Monitoring cost includes labour and all-terrain vehicle annual charge
Table 4 – 10 year Cost Summary for Rescue Tube Boxes (30 locations)




Commentary
The capital cost to replace the boxes and equipment over a 10 year period for 30 locations is
projected to be $229,277.59. Council’s net operating cost to establish, maintain and monitor the
equipment over a 10 year period is projected to be $731,425.08.


Risk & Opportunities
This item has been collectively discussed within the report.




                                                                                                Page 105 of 141

Page 106

GENERAL COMMITTEE MEETING                                                            19 JANUARY 2026


Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.


Consultation
External Consultation - Community & Stakeholder
King & Co. Solicitors
Surf Lifesaving Queensland Inc.
QLD Local Government Mutual Scheme / JLT Risk Solutions Pty Ltd.
Internal Consultation
Departments consulted:
     Office of the CEO, Mayor &             Community Services               Corporate Services
             Councillors
      Mayor & Councillors                 Director                        Director
      Chief Executive Officer             Community Development       x   Financial Services
      Executive Officers                  Sport & Active Lifestyles       Fleet
      Community Engagement                Arts & Culture                  Revenue Services
      People & Culture                    Community Connection            ICT
 x    Governance                          Customer Experience             Procurement

                                                                          Commercial Property

      Strategy & Environment              Development & Regulation        Infrastructure Services
      Director                        x   Director                        Director
      Strategy & Sustainability           Development Assessment          Infrastructure Planning, Design
                                                                          and Delivery
      Economic Development        &       Local Laws                      Civil and Asset operations
      Destination Management
      Environmental Services              Environmental Health            Waste
      Innovation & Digital Hub            Building & Plumbing             Building & Facilities
                                      x   Property / Permits              Disaster Management




                                                                                                    Page 106 of 141

Page 107

ATTACHMENT 1




               Page 107 of 141

— QO w YY S254. -gS oc He eu 6 oO o235 a £o cg aa ® Sas > S338 ° SS eos Be zs ~ 9 Sei =P Sas <gS2 Ee ¢ a,0O - &§ QF nh 5	1	1	1	6	3	905	243	25	21	51	8
5	1	1	1	6	4	991	235	142	50	0	Baz
5	1	1	1	6	5	1185	254	88	47	66	=o
5	1	1	1	6	6	1325	262	183	55	0	GoRo
5	1	1	1	6	7	1570	275	183	61	0	S2Ds
5	1	1	1	6	8	1807	316	33	26	51	=
5	1	1	1	6	9	2022	326	25	22	57	5
5	1	1	1	6	10	2310	340	130	49	19	22o
5	1	1	1	6	11	2493	365	35	32	51	°
5	1	1	1	6	12	2622	368	78	25	40	o<
5	1	1	1	6	13	2831	385	112	36	50	ra
5	1	1	1	6	14	3223	403	145	76	54	Og
4	1	1	1	7	0	539	237	2404	209	-1	
5	1	1	1	7	1	539	237	7	6	17	:
5	1	1	1	7	2	905	269	25	20	36	e
5	1	1	1	7	3	1045	273	25	23	70	@
5	1	1	1	7	4	1185	287	79	32	17	oY
5	1	1	1	7	5	1325	288	191	57	0	PoTOS
5	1	1	1	7	6	1570	327	77	26	57	oa
5	1	1	1	7	7	1668	312	26	51	0	og
5	1	1	1	7	8	1814	328	14	52	44	oO
5	1	1	1	7	9	2028	345	11	41	34	oO
5	1	1	1	7	10	2310	378	130	34	10	sso
5	1	1	1	7	11	2613	396	87	38	52	S5
5	1	1	1	7	12	2909	421	34	25	80	m
4	1	1	1	8	0	905	295	2361	208	-1	
5	1	1	1	8	1	905	295	25	20	42	SS
5	1	1	1	8	2	991	299	79	21	47	oS
5	1	1	1	8	3	1098	309	26	12	56	=
5	1	1	1	8	4	1185	312	78	30	57	Oo
5	1	1	1	8	5	1378	321	24	22	35	@
5	1	1	1	8	6	1483	325	36	43	44	cs
5	1	1	1	8	7	1622	338	218	54	20	ee)
5	1	1	1	8	8	2022	379	34	20	96	=
5	1	1	1	8	9	2310	403	131	35	19	S35
5	1	1	1	8	10	2674	438	26	25	44	°
5	1	1	1	8	11	2831	438	112	41	89	=o
5	1	1	1	8	12	3223	460	43	43	28	0
4	1	1	1	9	0	634	284	2003	188	-1	
5	1	1	1	9	1	634	284	21	30	34	—_—
5	1	1	1	9	2	680	300	22	4	74	—
5	1	1	1	9	3	1045	339	34	4	82	+
5	1	1	1	9	4	1099	317	17	32	52	@O
5	1	1	1	9	5	1622	378	34	5	93	=
5	1	1	1	9	6	1728	376	25	14	83	=
5	1	1	1	9	7	2022	405	34	7	89	—
5	1	1	1	9	8	2310	426	33	10	86	=:
5	1	1	1	9	9	2629	442	8	30	0	—_
4	1	1	1	10	0	346	297	3031	289	-1	
5	1	1	1	10	1	346	297	141	42	28	$89
5	1	1	1	10	2	539	299	35	28	72	2
5	1	1	1	10	3	626	301	140	54	0	§8F
5	1	1	1	10	4	819	300	120	58	26	82
5	1	1	1	10	5	991	324	133	72	49	553
5	1	1	1	10	6	1176	352	87	38	54	8
5	1	1	1	10	7	1377	347	131	61	12	ES:
5	1	1	1	10	8	1569	370	271	76	0	gage
5	1	1	1	10	9	1787	357	158	111	0	ec]
5	1	1	1	10	10	2022	417	25	43	75	3
5	1	1	1	10	11	2301	435	227	69	0	eg
5	1	1	1	10	12	2622	464	87	44	43	38
5	1	1	1	10	13	2831	477	111	54	49	Ao
5	1	1	1	10	14	3223	490	154	96	69	50
4	1	1	1	11	0	346	336	2519	224	-1	
5	1	1	1	11	1	346	336	132	42	50	PSs
5	1	1	1	11	2	539	361	26	22	61	§
5	1	1	1	11	3	626	357	131	47	50	226
5	1	1	1	11	4	819	385	24	25	54	8
5	1	1	1	11	5	905	390	25	22	7	@
5	1	1	1	11	6	991	399	140	27	36	o¥%4
5	1	1	1	11	7	1185	416	87	20	51	6s
5	1	1	1	11	8	1377	433	34	19	50	>
5	1	1	1	11	9	1430	423	25	22	34	2
5	1	1	1	11	10	1569	434	25	20	84	Q
5	1	1	1	11	11	1802	441	29	58	57	Oo
5	1	1	1	11	12	2310	500	131	33	0	%l53
5	1	1	1	11	13	2494	503	34	37	88	=
5	1	1	1	11	14	2831	535	34	25	67	4
4	1	1	1	12	0	400	370	2465	205	-1	
5	1	1	1	12	1	400	370	34	14	91	=
5	1	1	1	12	2	626	396	87	5	36	ae
5	1	1	1	12	3	991	411	25	22	70	Q
5	1	1	1	12	4	1035	395	34	65	53	&.
5	1	1	1	12	5	1430	450	87	28	47	FZ
5	1	1	1	12	6	1569	456	184	43	48	CMO,
5	1	1	1	12	7	2223	519	14	9	35	.
5	1	1	1	12	8	2363	519	33	30	0	%
5	1	1	1	12	9	2622	540	78	35	72	Do
5	1	1	1	12	10	2831	564	34	7	79	=
4	1	1	1	13	0	347	376	2596	224	-1	
5	1	1	1	13	1	347	376	131	25	65	S=Q
5	1	1	1	13	2	531	360	15	58	32	OB
5	1	1	1	13	3	680	405	24	22	85	5
5	1	1	1	13	4	896	416	34	20	63	2
5	1	1	1	13	5	1044	431	34	11	91	=
5	1	1	1	13	6	1185	440	25	21	49	o
5	1	1	1	13	7	1238	440	32	31	86	D
5	1	1	1	13	8	1377	457	25	22	47	3
5	1	1	1	13	9	1622	483	25	13	2	S
5	1	1	1	13	10	1812	467	30	58	0	7)
5	1	1	1	13	11	2310	538	131	12	29	saa
5	1	1	1	13	12	2494	541	34	33	88	6
5	1	1	1	13	13	2909	572	34	28	0	°
4	1	1	1	14	0	346	390	2935	279	-1	
5	1	1	1	14	1	346	390	786	114	0	Seah
5	1	1	1	14	2	602	386	185	130	0	Gag
5	1	1	1	14	3	786	386	163	130	17	ge
5	1	1	1	14	4	959	386	185	130	39	igs
5	1	1	1	14	5	1185	466	78	46	29	85
5	1	1	1	14	6	1378	481	139	72	28	S52
5	1	1	1	14	7	1569	481	184	80	81	2825
5	1	1	1	14	8	1806	531	32	28	79	2
5	1	1	1	14	9	2310	548	217	87	34	Sena
5	1	1	1	14	10	2613	567	96	78	26	#3
5	1	1	1	14	11	2831	578	34	63	60	8
5	1	1	1	14	12	2908	604	35	65	75	8
5	1	1	1	14	13	3225	632	56	33	52	=
4	1	1	1	15	0	346	439	2509	215	-1	
5	1	1	1	15	1	346	439	79	40	48	2s
5	1	1	1	15	2	539	452	34	15	48	7
5	1	1	1	15	3	620	481	11	5	39	8
5	1	1	1	15	4	733	479	25	21	51	»
5	1	1	1	15	5	905	492	25	20	79	n
5	1	1	1	15	6	1039	495	11	5	3	»
5	1	1	1	15	7	1098	500	35	4	29	.
5	1	1	1	15	8	1190	491	73	49	27	O08
5	1	1	1	15	9	1633	542	9	36	48	”n
5	1	1	1	15	10	1675	542	18	36	51	Oo
5	1	1	1	15	11	1809	555	23	44	48	Oo
5	1	1	1	15	12	2310	600	130	34	40	~2G
5	1	1	1	15	13	2831	648	24	6	4	.
4	1	1	1	16	0	347	462	2595	240	-1	
5	1	1	1	16	1	347	462	24	20	60	c
5	1	1	1	16	2	453	466	34	35	42	>
5	1	1	1	16	3	539	483	34	6	88	=
5	1	1	1	16	4	819	489	25	23	13	s
5	1	1	1	16	5	911	503	23	43	34	oe
5	1	1	1	16	6	991	507	79	35	21	Tg
5	1	1	1	16	7	1087	503	44	43	37	_.
5	1	1	1	16	8	1185	529	78	30	81	as
5	1	1	1	16	9	1377	539	78	23	40	+O
5	1	1	1	16	10	1569	558	34	21	43	a
5	1	1	1	16	11	1681	561	22	42	8	-—
5	1	1	1	16	12	2319	616	68	42	12	eof
5	1	1	1	16	13	2622	636	77	36	52	3<
5	1	1	1	16	14	2908	675	34	27	57	z
4	1	1	1	17	0	346	464	2363	235	-1	
5	1	1	1	17	1	346	487	25	22	86	@
5	1	1	1	17	2	391	464	25	49	41	Oo
5	1	1	1	17	3	548	487	28	54	39	Ss
5	1	1	1	17	4	634	487	14	54	15	bo
5	1	1	1	17	5	680	497	78	40	15	EO
5	1	1	1	17	6	819	530	33	22	55	1
5	1	1	1	17	7	905	528	25	19	74	8
5	1	1	1	17	8	982	535	34	20	52	o
5	1	1	1	17	9	1045	538	79	29	30	25
5	1	1	1	17	10	1377	563	131	28	37	ofp
5	1	1	1	17	11	1569	583	184	31	18	Sofa
5	1	1	1	17	12	1806	600	34	32	42	s
5	1	1	1	17	13	2309	649	78	22	55	+o
5	1	1	1	17	14	2493	648	34	32	33	a
5	1	1	1	17	15	2702	692	7	7	19	;
4	1	1	1	18	0	400	506	2299	195	-1	
5	1	1	1	18	1	400	506	78	22	48	CO
5	1	1	1	18	2	539	523	26	21	70	%
5	1	1	1	18	3	680	529	86	18	34	=
5	1	1	1	18	4	991	558	25	22	46	3
5	1	1	1	18	5	1098	563	26	20	78	2
5	1	1	1	18	6	1185	566	87	35	73	So
5	1	1	1	18	7	1422	578	40	43	68	ct
5	1	1	1	18	8	1675	599	65	43	57	345
5	1	1	1	18	9	2414	657	33	43	44	St
5	1	1	1	18	10	2622	677	33	24	0	o
5	1	1	1	18	11	2674	692	25	7	39	=
4	1	1	1	19	0	346	524	2596	224	-1	
5	1	1	1	19	1	346	524	141	50	34	S29
5	1	1	1	19	2	539	549	26	22	0	§
5	1	1	1	19	3	626	531	132	58	83	250
5	1	1	1	19	4	819	555	25	48	7	g
5	1	1	1	19	5	905	562	33	35	74	=
5	1	1	1	19	6	991	583	141	36	33	B38
5	1	1	1	19	7	1185	580	78	49	55	=O
5	1	1	1	19	8	1377	602	139	46	65	36g
5	1	1	1	19	9	1675	633	165	40	26	Boz
5	1	1	1	19	10	2309	675	218	66	0	os
5	1	1	1	19	11	2495	671	100	79	46	mM”
5	1	1	1	19	12	2622	704	85	42	59	8s
5	1	1	1	19	13	2909	707	33	41	40	2
4	1	1	1	20	0	347	564	2590	264	-1	
5	1	1	1	20	1	347	564	131	46	25	eafeo
5	1	1	1	20	2	539	577	26	39	31	3g
5	1	1	1	20	3	626	585	131	34	0	Ss
5	1	1	1	20	4	819	606	24	23	0	”
5	1	1	1	20	5	905	602	24	22	48	©
5	1	1	1	20	6	991	614	79	46	77	35
5	1	1	1	20	7	1097	621	32	48	77	2
5	1	1	1	20	8	1185	632	78	47	34	ao
5	1	1	1	20	9	1377	644	86	41	84	<o
5	1	1	1	20	10	1483	648	33	32	62	2
5	1	1	1	20	11	1622	672	139	23	35	5,
5	1	1	1	20	12	1806	678	33	57	42	0
5	1	1	1	20	13	2309	714	140	68	57	S56
5	1	1	1	20	14	2493	745	34	30	74	6
5	1	1	1	20	15	2633	747	66	49	26	eS
5	1	1	1	20	16	2897	751	40	77	26	rc
4	1	1	1	21	0	457	600	1295	123	-1	
5	1	1	1	21	1	457	600	9	34	44	Cc
5	1	1	1	21	2	627	614	19	35	64	Cc
5	1	1	1	21	3	680	625	33	5	80	=
5	1	1	1	21	4	819	634	33	7	53	=
5	1	1	1	21	5	990	644	42	34	24	ao
5	1	1	1	21	6	1385	671	9	36	41	oO
5	1	1	1	21	7	1622	699	78	21	60	a7
5	1	1	1	21	8	1727	710	25	13	61	s
4	1	1	1	22	0	347	605	2584	254	-1	
5	1	1	1	22	1	347	605	131	45	57	HOS
5	1	1	1	22	2	539	620	26	39	46	a
5	1	1	1	22	3	626	634	140	47	78	aes
5	1	1	1	22	4	818	647	35	35	18	&
5	1	1	1	22	5	905	641	34	61	63	a
5	1	1	1	22	6	991	672	79	24	75	O<
5	1	1	1	22	7	1097	692	26	22	35	4
5	1	1	1	22	8	1184	669	79	57	50	05
5	1	1	1	22	9	1377	713	34	22	80	o
5	1	1	1	22	10	1429	689	87	58	54	OF
5	1	1	1	22	11	1622	724	130	22	29	S50
5	1	1	1	22	12	1806	740	33	26	66	S
5	1	1	1	22	13	2300	763	207	55	0	a2enmnc¢c
5	1	1	1	22	14	2622	786	87	47	42	os
5	1	1	1	22	15	2917	806	14	53	41	oO
4	1	1	1	23	0	400	655	3013	260	-1	
5	1	1	1	23	1	400	655	164	28	68	a2 &§50 = — Oi. a ooo Q@BR3 o8o Mm ho rt Zz > qo= <<s— € OO oS Qe Oo @ nO + i 4 3 a 4 fe 225 5
5	1	1	1	25	4	990	744	133	54	0	8O3
5	1	1	1	25	5	1184	756	86	50	71	§5
5	1	1	1	25	6	1377	780	139	56	47	73S
5	1	1	1	25	7	1621	793	139	60	41	288
5	1	1	1	25	8	2309	846	138	57	11	ges
5	1	1	1	25	9	2674	898	33	14	47	o
5	1	1	1	25	10	3069	910	56	52	33	o
5	1	1	1	25	11	3378	947	35	29	90	>
4	1	1	1	26	0	400	746	3013	268	-1	
5	1	1	1	26	1	400	746	86	36	23	os
5	1	1	1	26	2	637	757	120	60	9	Do.
5	1	1	1	26	3	905	795	24	5	0	“
5	1	1	1	26	4	991	784	141	51	41	975
5	1	1	1	26	5	1184	797	83	61	80	2.0
5	1	1	1	26	6	1376	826	131	43	29	256
5	1	1	1	26	7	1621	843	140	47	13	TOG
5	1	1	1	26	8	2310	888	32	62	21	eo
5	1	1	1	26	9	2362	914	77	31	17	as
5	1	1	1	26	10	2454	888	32	62	57	OC
5	1	1	1	26	11	2674	915	25	25	55	©
5	1	1	1	26	12	3070	944	55	70	60	—|
5	1	1	1	26	13	3378	977	35	33	93	>
4	1	1	1	27	0	400	781	3013	297	-1	
5	1	1	1	27	1	400	781	77	44	30	22
5	1	1	1	27	2	626	792	140	51	10	of
5	1	1	1	27	3	990	832	133	51	2	S35
5	1	1	1	27	4	1184	849	87	30	23	52
5	1	1	1	27	5	1376	865	131	35	0	Fs
5	1	1	1	27	6	1621	872	131	50	21	88g
5	1	1	1	27	7	2300	927	227	77	30	823m
5	1	1	1	27	8	2674	959	25	36	56	5
5	1	1	1	27	9	3070	1017	54	11	68	=
5	1	1	1	27	10	3377	1012	36	66	1	G
4	1	1	1	28	0	688	829	1654	153	-1	
5	1	1	1	28	1	688	829	27	40	65	oO:
5	1	1	1	28	2	721	829	45	40	87	=:
5	1	1	1	28	3	995	855	19	35	65	oO
5	1	1	1	28	4	1197	872	8	30	52	Ss
5	1	1	1	28	5	1237	883	33	12	0	=
5	1	1	1	28	6	1383	885	10	35	43	oO
5	1	1	1	28	7	1482	905	25	19	84	c
5	1	1	1	28	8	1674	920	5	5	0	“
5	1	1	1	28	9	1729	911	9	34	24	Oa
5	1	1	1	28	10	2309	971	33	11	85	=.
4	1	1	1	29	0	400	824	3013	296	-1	
5	1	1	1	29	1	400	824	77	59	44	sg
5	1	1	1	29	2	626	849	25	37	44	2
5	1	1	1	29	3	679	860	86	43	31	3s
5	1	1	1	29	4	990	886	142	52	4	eB
5	1	1	1	29	5	1184	898	87	43	19	3°
5	1	1	1	29	6	1376	918	140	58	69	Bes
5	1	1	1	29	7	1621	926	140	66	40	348
5	1	1	1	29	8	2309	982	139	67	48	Ses
5	1	1	1	29	9	2492	1002	35	42	56	8
5	1	1	1	29	10	2673	1000	25	52	81	8
5	1	1	1	29	11	3069	1037	56	47	33	O
5	1	1	1	29	12	3378	1086	35	34	51	3
4	1	1	1	30	0	400	871	2299	206	-1	
5	1	1	1	30	1	400	871	77	33	26	SO
5	1	1	1	30	2	637	884	12	45	34	an
5	1	1	1	30	3	1043	927	87	27	83	Qe
5	1	1	1	30	4	1175	922	26	51	6	¢&
5	1	1	1	30	5	1621	967	87	45	2	cz.
5	1	1	1	30	6	2308	1035	33	13	65	>
5	1	1	1	30	7	2492	1047	34	14	81	>
5	1	1	1	30	8	2673	1054	26	23	16	®
4	1	1	1	31	0	419	897	2994	258	-1	
5	1	1	1	31	1	419	897	14	30	0	9
5	1	1	1	31	2	636	906	117	45	23	®oo4do
5	1	1	1	31	3	990	936	141	45	19	Onts
5	1	1	1	31	4	1237	961	25	37	46	a
5	1	1	1	31	5	1384	964	120	48	0	QBceo
5	1	1	1	31	6	1621	994	131	46	46	ga?
5	1	1	1	31	7	2308	1041	131	54	36	of8o
5	1	1	1	31	8	2493	1061	32	30	79	F
5	1	1	1	31	9	2676	1066	24	46	6	~~.
5	1	1	1	31	10	3075	1089	28	55	31	mM
5	1	1	1	31	11	3378	1128	35	27	82	m
4	1	1	1	32	0	399	920	3014	269	-1	
5	1	1	1	32	1	399	920	86	35	85	ao
5	1	1	1	32	2	626	944	87	43	46	we
5	1	1	1	32	3	990	993	25	22	81	»
5	1	1	1	32	4	1044	966	25	47	73	5
5	1	1	1	32	5	1097	982	21	22	2	o
5	1	1	1	32	6	1184	986	34	48	50	>
5	1	1	1	32	7	1228	1002	34	21	61	2
5	1	1	1	32	8	1376	1005	78	48	14	=o
5	1	1	1	32	9	1621	1018	140	50	8	on?
5	1	1	1	32	10	2308	1087	25	23	0	9
5	1	1	1	32	11	2362	1094	77	25	0	yo
5	1	1	1	32	12	2488	1073	28	54	58	Mm
5	1	1	1	32	13	2674	1112	33	22	94	>
5	1	1	1	32	14	3378	1161	35	28	80	Z
4	1	1	1	33	0	399	969	3014	254	-1	
5	1	1	1	33	1	399	969	33	12	29	a
5	1	1	1	33	2	679	979	78	21	29	“9
5	1	1	1	33	3	1043	1017	35	20	29	+o
5	1	1	1	33	4	1184	1029	78	20	91	Qe
5	1	1	1	33	5	1633	1044	16	61	21	D9
5	1	1	1	33	6	1674	1059	78	34	21	O5
5	1	1	1	33	7	2308	1112	78	31	51	SO
5	1	1	1	33	8	2421	1104	11	64	51	x
5	1	1	1	33	9	2492	1132	34	32	66	y
5	1	1	1	33	10	2673	1138	25	22	86	®
5	1	1	1	33	11	2907	1161	35	28	0	°
5	1	1	1	33	12	3086	1157	16	63	32	oO
5	1	1	1	33	13	3378	1194	35	29	84	4
4	1	1	1	34	0	400	973	3013	291	-1	
5	1	1	1	34	1	400	973	77	47	18	33
5	1	1	1	34	2	626	990	131	60	49	828
5	1	1	1	34	3	990	1020	132	53	0	ac2
5	1	1	1	34	4	1184	1050	78	26	51	95
5	1	1	1	34	5	1376	1051	139	55	54	o8F
5	1	1	1	34	6	1621	1085	78	22	34	23
5	1	1	1	34	7	2299	1136	227	42	0	aes
5	1	1	1	34	8	2673	1178	34	16	30	8
5	1	1	1	34	9	2830	1161	103	51	0	e.g
5	1	1	1	34	10	3378	1242	35	22	0	-
4	1	1	1	35	0	399	1009	2724	254	-1	
5	1	1	1	35	1	399	1009	78	35	44	OG
5	1	1	1	35	2	629	1022	23	45	49	Oo
5	1	1	1	35	3	682	1022	12	45	29	Oo
5	1	1	1	35	4	1044	1068	87	13	25	~~
5	1	1	1	35	5	1186	1062	76	41	64	320
5	1	1	1	35	6	1429	1096	34	5	38	>
5	1	1	1	35	7	1634	1106	126	42	34	2307
5	1	1	1	35	8	2308	1173	218	38	7	fot
5	1	1	1	35	9	2488	1167	24	48	61	Ss
5	1	1	1	35	10	2673	1194	25	24	55	°
5	1	1	1	35	11	2829	1214	34	23	84	a
5	1	1	1	35	12	3061	1217	62	46	74	Tl Q n + oa_73 5 © ~ > Zo Oo < — = s§ 5 Os aos i¢ ses) 688 = $23 9 g a 3 =o #338 28a 32 SOR B28 9] NS aor oD 2 835 2 nD - = = os S4a fog =m S83 = 2 wy o| ee a = O Oo Zo n © on Oo > ° tf Oo oe 8=
5	1	1	1	43	4	1183	1261	79	32	82	By
5	1	1	1	43	5	1367	1283	86	29	23	DO
5	1	1	1	43	6	1644	1298	116	29	15	22
5	1	1	1	43	7	2119	1331	41	37	44	2
5	1	1	1	43	8	2308	1357	130	31	62	=29
5	1	1	1	43	9	2491	1366	34	32	91	¢
5	1	1	1	43	10	2829	1403	25	23	67	©
5	1	1	1	43	11	3069	1405	55	44	33	=
4	1	1	1	44	0	399	1220	2725	265	-1	
5	1	1	1	44	1	399	1220	86	58	32	Pa
5	1	1	1	44	2	625	1252	131	47	39	353
5	1	1	1	44	3	1043	1268	88	59	0	2g
5	1	1	1	44	4	1183	1286	79	64	0	gs
5	1	1	1	44	5	1376	1307	139	50	33	oS
5	1	1	1	44	6	1611	1325	138	70	54	S54
5	1	1	1	44	7	2127	1369	26	61	47	a
5	1	1	1	44	8	2307	1383	218	79	0	Seeye-
5	1	1	1	44	9	2672	1398	26	66	64	73
5	1	1	1	44	10	2829	1416	103	69	80	23
5	1	1	1	44	11	3069	1456	55	11	84	=
4	1	1	1	45	0	679	1315	2184	164	-1	
5	1	1	1	45	1	679	1315	33	4	70	_.
5	1	1	1	45	2	1096	1330	26	22	51	©
5	1	1	1	45	3	1428	1353	78	32	18	+O
5	1	1	1	45	4	2307	1443	5	5	49	>
5	1	1	1	45	5	2360	1437	32	11	77	=
5	1	1	1	45	6	2829	1472	34	7	74	=
4	1	1	1	46	0	399	1271	2725	307	-1	
5	1	1	1	46	1	399	1271	87	58	54	BS
5	1	1	1	46	2	625	1303	131	60	26	Bae
5	1	1	1	46	3	1034	1333	236	78	27	Beg
5	1	1	1	46	4	1375	1356	131	48	42	Sof
5	1	1	1	46	5	1620	1391	140	62	67	295
5	1	1	1	46	6	2127	1436	34	47	0	s
5	1	1	1	46	7	2360	1444	165	64	76	825
5	1	1	1	46	8	2659	1432	30	115	18	#8
5	1	1	1	46	9	2820	1485	120	49	60	Fé
5	1	1	1	46	10	3069	1475	55	103	86	=
4	1	1	1	47	0	390	1333	2542	220	-1	
5	1	1	1	47	1	390	1333	34	22	28	a
5	1	1	1	47	2	625	1344	118	47	1	@Qex
5	1	1	1	47	3	1096	1387	26	33	95	=
5	1	1	1	47	4	1375	1419	78	25	66	=o
5	1	1	1	47	5	1481	1418	25	23	53	o
5	1	1	1	47	6	1620	1437	87	27	9	oa
5	1	1	1	47	7	2127	1488	25	12	53	=
5	1	1	1	47	8	2422	1491	21	40	18	oc
5	1	1	1	47	9	2672	1524	26	22	76	5
5	1	1	1	47	10	2822	1539	14	7	34	=
5	1	1	1	47	11	2907	1531	25	22	73	n
4	1	1	1	48	0	399	1376	2533	236	-1	
5	1	1	1	48	1	399	1376	86	47	43	So
5	1	1	1	48	2	616	1390	140	48	15	ge
5	1	1	1	48	3	1043	1422	79	52	38	So
5	1	1	1	48	4	1183	1434	87	52	33	5
5	1	1	1	48	5	1375	1459	131	49	28	=S$
5	1	1	1	48	6	1620	1486	131	41	54	cfg
5	1	1	1	48	7	2127	1513	33	47	46	S
5	1	1	1	48	8	2360	1542	85	38	36	22
5	1	1	1	48	9	2491	1557	34	33	85	6
5	1	1	1	48	10	2672	1565	33	39	23	2
5	1	1	1	48	11	2829	1566	103	46	75	65
4	1	1	1	49	0	393	1414	1992	181	-1	
5	1	1	1	49	1	393	1414	11	5	5	*
5	1	1	1	49	2	625	1437	78	22	69	=O
5	1	1	1	49	3	731	1440	25	22	42	O
5	1	1	1	49	4	1183	1485	34	5	46	=
5	1	1	1	49	5	1477	1485	26	52	1	on
5	1	1	1	49	6	1620	1510	25	19	43	n
5	1	1	1	49	7	2360	1573	25	22	48	©
4	1	1	1	50	0	399	1435	2447	250	-1	
5	1	1	1	50	1	399	1439	29	58	0	&
5	1	1	1	50	2	444	1435	33	66	20	2.
5	1	1	1	50	3	625	1480	87	22	60	sa
5	1	1	1	50	4	731	1465	25	43	28	Z
5	1	1	1	50	5	1043	1502	79	32	69	<0
5	1	1	1	50	6	1183	1507	78	44	61	Ge
5	1	1	1	50	7	1375	1522	130	45	42	ae
5	1	1	1	50	8	1673	1552	77	41	63	os
5	1	1	1	50	9	2127	1589	33	24	0	&
5	1	1	1	50	10	2361	1595	164	65	0	S$3r
5	1	1	1	50	11	2675	1630	22	43	68	=>
5	1	1	1	50	12	2834	1642	12	43	38	oO
4	1	1	1	51	0	444	1474	1261	123	-1	
5	1	1	1	51	1	444	1474	45	41	0	roasl
5	1	1	1	51	2	1428	1559	24	21	37	©
5	1	1	1	51	3	1620	1576	85	21	42	Os
4	1	1	1	52	0	399	1501	2462	224	-1	
5	1	1	1	52	1	399	1501	78	30	35	25
5	1	1	1	52	2	625	1507	131	59	36	gee
5	1	1	1	52	3	1043	1533	87	50	11	ca
5	1	1	1	52	4	1183	1554	87	47	53	22
5	1	1	1	52	5	1375	1571	138	50	48	$55
5	1	1	1	52	6	1620	1597	138	49	39	253
5	1	1	1	52	7	2360	1647	165	63	0	sg35
5	1	1	1	52	8	2672	1665	25	22	78	2
5	1	1	1	52	9	2810	1638	24	91	18	8g
4	1	1	1	53	0	393	1534	2460	257	-1	
5	1	1	1	53	1	393	1534	92	44	48	es
5	1	1	1	53	2	519	1529	59	87	62	6
5	1	1	1	53	3	625	1547	138	65	0	gh
5	1	1	1	53	4	708	1529	29	87	0	e
5	1	1	1	53	5	1043	1576	78	60	74	35
5	1	1	1	53	6	1183	1606	86	51	33	a8
5	1	1	1	53	7	1375	1605	139	65	84	385
5	1	1	1	53	8	1620	1632	130	58	0	32°
5	1	1	1	53	9	2359	1696	165	60	37	Som
5	1	1	1	53	10	2672	1707	34	53	75	9
5	1	1	1	53	11	2828	1727	25	64	53	5
4	1	1	1	54	0	399	1580	2463	240	-1	
5	1	1	1	54	1	399	1580	77	60	31	ca
5	1	1	1	54	2	625	1598	139	66	26	6386
5	1	1	1	54	3	1043	1636	86	50	43	qa
5	1	1	1	54	4	1183	1655	87	51	54	ge
5	1	1	1	54	5	1375	1667	130	30	21	oes
5	1	1	1	54	6	1619	1673	131	69	23	S38
5	1	1	1	54	7	2359	1728	165	64	37	chm
5	1	1	1	54	8	2672	1761	34	37	7	g¢
5	1	1	1	54	9	2828	1796	34	24	85	3
4	1	1	1	55	0	625	1647	2228	198	-1	
5	1	1	1	55	1	625	1647	5	5	76	:
5	1	1	1	55	2	1084	1662	50	45	46	fom
5	1	1	1	55	3	1427	1702	25	22	0	®
5	1	1	1	55	4	1725	1747	34	5	43	c
5	1	1	1	55	5	2412	1781	33	13	84	o
5	1	1	1	55	6	2491	1787	33	31	84	b
5	1	1	1	55	7	2672	1804	25	22	19	s
5	1	1	1	55	8	2828	1823	25	22	11	®
4	1	1	1	56	0	399	1638	2038	179	-1	
5	1	1	1	56	1	399	1638	25	22	46	9
5	1	1	1	56	2	452	1645	17	20	72	5
5	1	1	1	56	3	678	1659	87	28	38	<8
5	1	1	1	56	4	1042	1688	35	22	37	a
5	1	1	1	56	5	1375	1706	24	33	96	3
5	1	1	1	56	6	1480	1714	25	22	3	°
5	1	1	1	56	7	1619	1736	33	12	11	o
5	1	1	1	56	8	2360	1794	24	23	77	3
5	1	1	1	56	9	2412	1795	25	22	62	0
4	1	1	1	57	0	399	1665	2462	234	-1	
5	1	1	1	57	1	399	1665	86	25	49	58
5	1	1	1	57	2	704	1683	60	53	0	=
5	1	1	1	57	3	1042	1715	88	57	91	25
5	1	1	1	57	4	1183	1707	78	57	26	gS
5	1	1	1	57	5	1375	1729	139	47	66	g38
5	1	1	1	57	6	1619	1747	131	50	0	ooo
5	1	1	1	57	7	2359	1820	78	21	60	22
5	1	1	1	57	8	2441	1805	84	86	30	58
5	1	1	1	57	9	2663	1830	34	65	75	5
5	1	1	1	57	10	2829	1849	32	50	0	-
4	1	1	1	58	0	399	1703	2038	180	-1	
5	1	1	1	58	1	399	1703	34	5	10	_-
5	1	1	1	58	2	678	1717	34	4	32	=
5	1	1	1	58	3	1366	1770	94	22	54	<e
5	1	1	1	58	4	1481	1782	20	5	94	=
5	1	1	1	58	5	1619	1794	140	25	44	Ces
5	1	1	1	58	6	2420	1852	17	31	26	os
4	1	1	1	59	0	399	1710	2451	250	-1	
5	1	1	1	59	1	399	1710	77	50	77	a5
5	1	1	1	59	2	678	1725	32	51	26	o
5	1	1	1	59	3	1043	1776	87	28	44	5Z
5	1	1	1	59	4	1183	1769	86	46	60	acd
5	1	1	1	59	5	1375	1790	139	61	58	ToS
5	1	1	1	59	6	1610	1808	138	63	38	54.
5	1	1	1	59	7	2359	1856	87	64	40	S3
5	1	1	1	59	8	2476	1852	48	97	57	hh
5	1	1	1	59	9	2672	1915	33	31	96	=
5	1	1	1	59	10	2834	1899	16	61	0	Sp
4	1	1	1	60	0	399	1751	2453	233	-1	
5	1	1	1	60	1	399	1764	34	4	47	a
5	1	1	1	60	2	454	1751	11	42	13	DS
5	1	1	1	60	3	678	1780	78	25	68	OD
5	1	1	1	60	4	1043	1809	87	29	65	oM
5	1	1	1	60	5	1177	1805	23	46	30	¢€
5	1	1	1	60	6	1230	1821	40	19	60	KH.
5	1	1	1	60	7	1381	1827	11	42	44	oO
5	1	1	1	60	8	1480	1846	34	19	68	=.
5	1	1	1	60	9	2359	1911	34	22	87	>
5	1	1	1	60	10	2831	1942	21	42	49	BB
4	1	1	1	61	0	399	1825	2306	200	-1	
5	1	1	1	61	1	399	1825	77	32	79	33
5	1	1	1	61	2	678	1851	85	29	36	so
5	1	1	1	61	3	1042	1870	59	31	0	2- @° Qo 2 ao 8 oS > a cD =-a 3 QS off a Q a se 0CiS a 8 Tso Soe 38 Q 2 > # ® 5 © aos 3 oa 7 ae Oo * aS © an) Sag Q 3. 9 7 a S == 5S 4 a oS oF uU sO os = 9 So zs 2 a® =< @O 9 = 2 29 a2. g Fo 2. ons So 2. 3 0a =o =. 9 > BSG o85 ea So D a SRE PSs S = nO o= xO o o> ° = 5 non oO an = e =h oD oa = oO ~~ oO ~N 2 s AK s

Page 108

Page 108 of 141

3. Seek Expert Insights: Contact Greg Hackfath, Team Leader of Lifeguard Services at Coffs Harbour, who pioneered a similar project, for insights and guidance. 4. Explore Emergency Beacons: Explore using Surf Life Saving Queensland's (SLSQ) emergency beacons with the rescue tubes/life rings. This would allow beachgoers to contact emergency response by pressing a button, and the tubes/life rings would have clear location markings, including access numbers, to assist emergency responders. Background: Rescue tubes and life rings are widely used across Australia, Europe, and the United States as essential public rescue equipment, yet Queensland is lagging in adopting these life-saving measures. Coffs Harbour has implemented a successful remote rescue tube project across the Central and Northern Coastlines of New South Wales, and similar initiatives are prevalent in places like Hawaii, New Zealand, and Zambia. From Escambia County in Florida to the beaches of Denmark and Germany, these devices have proven effective in preventing drowning incidents. The global adoption of rescue tubes and life rings highlights the need for Queensland to implement similar measures for unpatrolled and remote areas. This initiative is supported by community organizations such as the Noosa Boardriders Club, Noosa Malibu Club, NWSR, NSCA, and NBFA. Two near-drowning incidents in the past 12 months at North Sunshine Beach and A Bay highlight the need for better water safety measures in remote areas, despite long-standing requests for rescue tubes at Boiling Pot, Tea Tree Bay, Granite Bay, and Alexandria Bay, a recent Surf Life Saving Queensland safety audit did not prioritize these devices, focusing instead on relocating defibrillators and installing emergency access numbering. Coffs Harbour City Council's 2019 remote rescue tube trial saw strong community support, no incidents of vandalism, and demonstrated life-saving potential. Since its implementation, no bystander drownings have been reported. This trial is a compelling precedent for Noosa’s unpatrolled and remote beach areas. Conclusion: Noosa Council has the opportunity to enhance beach safety with a remote rescue tube/life ring trial. Drawing on the success of Coffs Harbour’s initiative, this project could offer a cost-effective, community-supported solution to prevent drownings. The trial’s expansion can be carefully evaluated with key stakeholders, ensuring a safer environment for residents and visitors. Supporting Documentation: e Coffs Harbour Remote Rescue Tube Project e Courier Mail article: Sunshine Beach rescue / ABC News article: Argentina lifequard Noosa surfers rescue / https://www.abc.net.au/news/2023-10-13/argentina-lifequard-noosa-surfers- rescue-nude-swimmers-rip/102973488 e [NSRI Pink Rescue Buoys in Zambia](https:/Avww.nsri.org.za/water-safety/pink-rescue buoys/) e Central Coast Rescue Tube Boxes - Central Coast has them: https://coastcommunitynews.com.au/central-coast/news/2024/05/rescue-tube-boxes-aim-to- reduce-beach-drownings/ e Illawarra Surf Rescue Stations - Illawarra has them: htps://regionillawara.com.au/manyana- inspiration-surf-rescue-stations-planned-for-lake-conjola-following-drowning/17514 e Hawaiian Rescue Tube Foundation / Study on Rescue Rings in Kauai - Study published on the rescue rings in Kauai: https://www.beachsafetresearch.com/blog/evauating-public-rescue-tube- deployment-in-hawaii e Surf lifesaving NZ public rescue equipment guide: https://noosatoday.com.au/news/15-01- 2022/surf -rescues-simple-solution/ e Ballina Beach Rescue Devices - Ballina has them: ballina.nsw.gov.au/beach-rescue-devices e ILS Public Information on Rescue Tubes in Europe - Europe has them - Denmark and Germany: https://europe.ilsf.org/wp- content/uploads/sites/3/2020/07/202007 Public Information PRT EN.pdf e _https:/Awww.couriermail.com.au/news/queensland/sunshine-coast/christine-logan-saves- woman-from-rip-at-sunshine-beach/news-story/f843ef31c4ae1c23f165c9037f4a2144 Page 108 of 141

Page 109

Page 109 of 141

a- + e ee e e ; o|\ BES | : =. | qg & Rey bos ee ® a ic a|I>zZz\5 az © ‘Lee Slo isa sa QRB) alo O50 : o%lp aoalB/}2 sie a 3 3 & fee 22BEEskes Ps ot ‘eee ta <— atlliePaoasxs 3 |o ONY ) BF 8 oD |G sa [6 § ns Oo = , 1 S10 o |A Dic Re + = Pe ZFO|PISO, lols oe =z . 3m Q e COM BCLSE69 685 DN \ of F Po CkeMEOS Boo 8 a i ® ca , rs sD oO |® = O—s SO gy . TSReNso Blea = a we S S9<IC2 8? ola = | ‘ 9 3/5 an o ee o | R25 | 2 1/3 lenmoes oleo o Nag ZSOWVPER |, CllsoFs an: ko G C2 |o 8 2 AR Io 3b 3 5 DO lee |O Li- | lay a an ; OD ld |G 5 |B lg 3 | oO 9 ; 9 5 |=|> =(2 |S |= [5 i 3.0 Q rie Pec CoSINE i —_ > 9 Ti 5 ln = | Ss O ~ oy 1% 1D | 20M a 2 “ aan : 7s ND — | Tz 1 lee OS O VSS} EH FT Me 9 Tlo |? 3 3j® Dip |= + > a ee LBL oO |si2=”0o =oO|5 | 3 <2B6 5236 8 . - 7 3° om h S ; = FF & 8 Sie Go |w = Y —_= 8ao se zl 5 7 nD a ef4crezrS$|S 2 jae x B2S0eshaes Oo oe {fy Oo ae 00 2 M16 cH |O > poy #. ! ® >») mS Fi =O|s O/6 @ Sls. 0 : 3 @ EST rea T ay ; “ ° ad e = es a o- A cece tt. Me ‘4 = ZT +S al olor + = 3 Saud AN ; fat} Daly 2l@ ok fo Oo | ioe a) Fr =19 < |S o > i oO © ome a i = oO = = oO ao fay} —_ a er a por ie = S Q ol > IO [5 y o © oe S ® [FE|E 8 (9 a |e ~~ o Ss) ie oO o ia! Sae” 3 > \ > | > yi = bs ois 3 3/0 5 o 7 # ° rio ff. 01. & = nv = = So KSI off Kis ~ 5 a ~ = 3s /@egee SR » c ta ON Oo > BER ZE Sls o 5	1	1	1	51	3	1912	1633	42	36	82	@
5	1	1	1	51	4	1978	1633	9	36	24	4s
5	1	1	1	51	5	2070	1634	65	46	0	 *®
5	1	1	1	51	6	2277	1651	12	19	17	ee
5	1	1	1	51	7	2361	1650	20	26	23	8
5	1	1	1	51	8	2459	1637	47	34	7	—_e
5	1	1	1	51	9	2759	1638	26	20	77	>
5	1	1	1	51	10	2869	1653	26	21	24	a
5	1	1	1	51	11	2900	1641	56	42	0	10'
5	1	1	1	51	12	2977	1645	6	6	40	|
5	1	1	1	51	13	3036	1637	12	44	27	oO
5	1	1	1	51	14	3054	1641	48	36	67	|4
5	1	1	1	51	15	3195	1636	88	27	0	No
4	1	1	1	52	0	736	1686	2547	48	-1	
5	1	1	1	52	1	690	1687	49	23	0	Q,
5	1	1	1	52	2	1987	1693	168	20	14	ef
5	1	1	1	52	3	2139	1680	19	37	55	|
5	1	1	1	52	4	2305	1688	45	25	66	>.
5	1	1	1	52	5	2433	1686	36	48	58	~<
5	1	1	1	52	6	2759	1686	26	32	82	=
5	1	1	1	52	7	2869	1689	58	23	4	oo
5	1	1	1	52	8	2977	1705	35	13	6	&
5	1	1	1	52	9	3085	1692	20	38	45	Oo
5	1	1	1	52	10	3249	1691	34	24	12	a
4	1	1	1	53	0	1037	1701	2246	63	-1	
5	1	1	1	53	1	1037	1701	25	44	8	o
5	1	1	1	53	2	1658	1707	35	35	32	a
5	1	1	1	53	3	1831	1721	18	22	2	ee
5	1	1	1	53	4	2133	1703	28	26	52	ec
5	1	1	1	53	5	2289	1713	75	26	0	_~
5	1	1	1	53	6	2760	1720	25	29	30	+
5	1	1	1	53	7	2869	1716	79	46	45	ile
5	1	1	1	53	8	3087	1729	26	33	86	3
5	1	1	1	53	9	3195	1713	88	51	67	Ig
4	1	1	1	54	0	1955	1744	831	46	-1	
5	1	1	1	54	1	1955	1745	75	22	40	M@
5	1	1	1	54	2	2145	1748	4	4	54	>
5	1	1	1	54	3	2293	1744	27	28	23	Fy
5	1	1	1	54	4	2451	1751	54	39	49	2
5	1	1	1	54	5	2760	1750	26	22	28	O
4	1	1	1	55	0	690	1745	2594	62	-1	
5	1	1	1	55	1	690	1766	3	30	18	:
5	1	1	1	55	2	1037	1759	33	35	0	o
5	1	1	1	55	3	1657	1745	35	31	0	c
5	1	1	1	55	4	1843	1769	219	32	0	SDR
5	1	1	1	55	5	2266	1752	21	36	0	Ne
5	1	1	1	55	6	2760	1775	26	20	54	n
5	1	1	1	55	7	2869	1775	26	21	69	=
5	1	1	1	55	8	2901	1759	44	48	72	|=
5	1	1	1	55	9	3087	1767	34	21	33	a
5	1	1	1	55	10	3248	1765	36	36	39	oO
4	1	1	1	56	0	1037	1783	2228	49	-1	
5	1	1	1	56	1	1037	1805	32	12	30	3
5	1	1	1	56	2	1657	1783	50	32	57	>
5	1	1	1	56	3	2144	1798	58	5	67	—
5	1	1	1	56	4	2451	1792	42	40	75	°
5	1	1	1	56	5	2760	1797	168	24	29	gist
5	1	1	1	56	6	3087	1790	178	40	35	an
4	1	1	1	57	0	683	1833	2591	47	-1	
5	1	1	1	57	1	683	1833	59	47	0	™
5	1	1	1	57	2	1037	1844	23	22	0	g
5	1	1	1	57	3	2452	1837	40	36	23	S
5	1	1	1	57	4	2760	1845	26	23	68	2
5	1	1	1	57	5	2869	1844	26	21	65	B
5	1	1	1	57	6	3097	1853	5	14	0	;
5	1	1	1	57	7	3249	1845	25	20	35	is
4	1	1	1	58	0	2770	1859	514	31	-1	
5	1	1	1	58	1	2770	1870	5	14	81	1
5	1	1	1	58	2	2891	1859	57	31	33	|<
5	1	1	1	58	3	3087	1869	26	20	25	n
5	1	1	1	58	4	3249	1870	35	5	74	=
4	1	1	1	59	0	1038	1867	2245	54	-1	
5	1	1	1	59	1	1038	1880	34	32	74	O
5	1	1	1	59	2	1659	1867	45	36	46	=
5	1	1	1	59	3	2453	1881	40	37	68	=
5	1	1	1	59	4	2760	1885	33	36	39	¢
5	1	1	1	59	5	2870	1893	78	25	3	|Elo
5	1	1	1	59	6	3087	1892	26	22	53	a
5	1	1	1	59	7	3249	1879	34	22	16	o
4	1	1	1	60	0	1670	1899	1605	60	-1	
5	1	1	1	60	1	1670	1899	19	37	73	=|
5	1	1	1	60	2	1854	1910	189	25	13	Teh
5	1	1	1	60	3	1971	1900	44	43	5	ts
5	1	1	1	60	4	2032	1900	137	43	40	edit)
5	1	1	1	60	5	2168	1914	70	15	0	st
5	1	1	1	60	6	2240	1900	23	43	35	ae
5	1	1	1	60	7	2305	1900	29	43	36	ek
5	1	1	1	60	8	2462	1903	14	56	31	oO
5	1	1	1	60	9	2760	1926	35	22	40	o
5	1	1	1	60	10	2922	1923	26	21	83	c
5	1	1	1	60	11	3090	1918	23	22	14	<
5	1	1	1	60	12	3249	1905	26	39	0	”
4	1	1	1	61	0	691	1927	2584	60	-1	
5	1	1	1	61	1	691	1933	2	32	93	i
5	1	1	1	61	2	1034	1927	38	40	72	Q.
5	1	1	1	61	3	1654	1927	40	56	17	o)
5	1	1	1	61	4	1826	1944	9	17	0	t
5	1	1	1	61	5	2112	1941	8	1	68	:
5	1	1	1	61	6	2190	1939	79	8	4	—
5	1	1	1	61	7	2453	1960	54	13	4	—°
5	1	1	1	61	8	2767	1947	10	35	32	oO
5	1	1	1	61	9	2869	1936	27	39	40	©
5	1	1	1	61	10	2897	1932	60	55	69	I>
5	1	1	1	61	11	3087	1941	26	24	7	@
5	1	1	1	61	12	3252	1942	23	45	57	oO
4	1	1	1	62	0	1038	1994	2075	45	-1	
5	1	1	1	62	1	1038	1994	25	39	16	D
5	1	1	1	62	2	1853	2004	9	18	0	.
5	1	1	1	62	3	2171	2027	26	3	40	Eb
5	1	1	1	62	4	2204	2027	48	2	29	fas
5	1	1	1	62	5	2771	2000	15	29	13	oy
5	1	1	1	62	6	2870	1998	78	41	75	216
5	1	1	1	62	7	3088	2003	25	22	57	<
4	1	1	1	63	0	1029	2012	2246	56	-1	
5	1	1	1	63	1	1029	2034	34	22	77	<
5	1	1	1	63	2	2251	2012	84	56	29	=a,
5	1	1	1	63	3	2761	2028	33	34	58	aH
5	1	1	1	63	4	2870	2024	78	35	36	|o\2
5	1	1	1	63	5	3088	2026	26	23	17	o
5	1	1	1	63	6	3250	2028	25	20	83	=
4	1	1	1	64	0	1038	2050	2247	50	-1	
5	1	1	1	64	1	1038	2069	34	31	76	=
5	1	1	1	64	2	1892	2084	3	2	29	7
5	1	1	1	64	3	2761	2064	26	23	80	s
5	1	1	1	64	4	2870	2050	86	44	39	ge
5	1	1	1	64	5	3088	2051	26	38	8	i
4	1	1	1	65	0	50	2086	3225	55	-1	
5	1	1	1	65	1	50	2095	31	46	15	a
5	1	1	1	65	2	1038	2106	25	22	14	5
5	1	1	1	65	3	2341	2086	27	52	4	FF
5	1	1	1	65	4	2760	2101	35	31	71	o
5	1	1	1	65	5	2870	2098	35	40	54	|F
5	1	1	1	65	6	3250	2099	25	35	5	i
4	1	1	1	66	0	42	2131	2854	50	-1	
5	1	1	1	66	1	42	2144	31	20	76	Q
5	1	1	1	66	2	1038	2131	34	43	23	=
5	1	1	1	66	3	2111	2145	21	3	49	©
5	1	1	1	66	4	2169	2142	22	39	45	i
5	1	1	1	66	5	2760	2135	35	38	0	c
5	1	1	1	66	6	2870	2141	26	39	20	|
4	1	1	1	67	0	50	2167	1013	32	-1	
5	1	1	1	67	1	50	2167	23	21	60	©
5	1	1	1	67	2	1038	2180	25	19	67	5
5	1	1	1	67	3	2162	2179	29	23	20	Fs
4	1	1	1	68	0	51	2204	2136	20	-1	
5	1	1	1	68	1	51	2205	30	12	36	o
5	1	1	1	68	2	1029	2204	34	20	84	a
5	1	1	1	68	3	2164	2204	23	11	11	i
4	1	1	1	69	0	50	2226	31	19	-1	
5	1	1	1	69	1	50	2226	31	19	0	°
4	1	1	1	70	0	50	2250	31	20	-1	
5	1	1	1	70	1	50	2250	31	20	34	©
4	1	1	1	71	0	50	2283	23	21	-1	
5	1	1	1	71	1	50	2283	23	21	80	°
4	1	1	1	72	0	51	2305	31	13	-1	
5	1	1	1	72	1	51	2305	31	13	0	o
4	1	1	1	73	0	51	2333	30	12	-1	
5	1	1	1	73	1	51	2333	30	12	8	s
4	1	1	1	74	0	51	2352	30	21	-1	
5	1	1	1	74	1	51	2352	30	21	62	K
4	1	1	1	75	0	51	2379	30	12	-1	
5	1	1	1	75	1	51	2379	30	12	8	s

Page 110

GENERAL COMMITTEE MEETING                                                       19 JANUARY 2026


 8.3        PLANNING APPLICATIONS DECIDED BY DELEGATED AUTHORITY –
            NOVEMBER 2025


Author            Development Assessment Manager, Patrick Murphy
                  Development & Regulation Department
Index             ECM/Subject/All Applications
Attachments       1.   ATTACHMENT 1 - Delegated Report - November 2025


EXECUTIVE SUMMARY
Attachment 1 lists applications that are decided by delegated authority during the month of
November 2025 (excluding applications seeking to remove a tree(s) adjacent to a building or
structure). Included in Attachment 1 is a table providing a snapshot of the total applications
determined for the month of November 2025.

RECOMMENDATION
That Council note the report by the Development Assessment Manager to the General Committee
Meeting on 19 January 2026 regarding applications that have been decided by delegated authority
for November 2025 as provided at Attachment 1 to the Report.


REPORT
The Local Government Act 2009 allows, by resolution, a local government to delegate its powers to
the Mayor, CEO, a standing committee or a joint standing committee and the CEO to delegate those
powers to another employee of Council.

Under the current delegations for the Planning Act 2016 the ability to manage, assess and decide a
range of development applications are delegated to officers with the exception of the following which
are reported to Council for a decision:
a. An application for a variation request mentioned in section 61 of the Planning Act 2016 to vary
   the effect of the Planning Scheme;
b. An application which is for an inconsistent use as defined in the Planning Scheme;
c. An application for a proposed development where more than 30 submissions have been received
   during the notification part objecting to the proposed development;
d. An extension of an approval that was made under a superseded Planning Scheme (i.e. pre-
   Noosa Plan 2020) and/or where there is a resolution of Council to amend the Planning Scheme
   in a way that is relevant to the approval;
e. An impact assessable application involving the clearing of vegetation which is mapped as being
   in an area of biodiversity significance on the Biodiversity, Waterways and Wetlands Overlay Map
   and containing an endangered regional ecosystem, except in circumstances where the clearing
   is exempt clearing;
f.   The removal or demolition of a structure or place identified within the Planning Scheme’s
     Heritage and Character Overlay Map;
It should be noted though that due to the strict time frames of the Planning Act 2016, officers under
the current delegations have the ability to decide an application where the application has the
potential for ‘deemed approval’.




                                                                                             Page 110 of 141

Page 111

GENERAL COMMITTEE MEETING                                                      19 JANUARY 2026


In accordance with the current delegations, a wide range of development applications are decided
by Council officers each month, with a limited number of applications reported to Council for a
decision.


Link to Corporate Plan
Theme No 1 - Environment
Focus areas include the natural environment, built environment, waterways and coasts and
conservation and heritage.
Objective 1.8 Reinforce Noosa Design Principles to shape the look and feel of our distinctive built
environment to ensure it responds to our climate, environment and unique character.

Theme No. 2 - Liveability
Liveability encompasses housing, facilities and services, transport, health and wellbeing to enable
an inclusive, connected and vibrant community.
Objective 2.1 Facilitate greater housing choice which meets the changing needs of the community,
improves liability and affordability and includes partnering to increase provision of social and
affordable housing.




Previous Council Consideration
Nil.


Finance
Nil.



Risk & Opportunities
Nil.



Human Rights
Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with
Council’s Human Rights Policy.


Consultation
External Consultation - Community & Stakeholder
Nil.
Internal Consultation
Departments consulted:



                                                                                           Page 111 of 141

Page 112

GENERAL COMMITTEE MEETING                                                      19 JANUARY 2026


   Office of the CEO, Mayor &             Community Services           Corporate Services
           Councillors
    Mayor & Councillors                 Director                    Director
    Chief Executive Officer             Community Development       Financial Services
    Executive Officers                  Sport & Active Lifestyles   Fleet
    Community Engagement                Arts & Culture              Revenue Services
    People & Culture                    Community Connection        ICT
    Governance                          Customer Experience         Procurement

                                                                    Commercial Property

    Strategy & Environment              Development & Regulation    Infrastructure Services
    Director                        x   Director                    Director
    Strategy & Sustainability       x   Development Assessment      Infrastructure Planning, Design
                                                                    and Delivery
    Economic Development        &       Local Laws                  Civil and Asset operations
    Destination Management
    Environmental Services              Environmental Health        Waste
    Innovation & Digital Hub            Building & Plumbing         Building & Facilities
                                        Property / Permits          Disaster Management




                                                                                              Page 112 of 141

Page 113

                                                          ATTACHMENT 1
                                            Decision Issued Under Delegated Authority
                                  Development Applications Decided - November 2025                                Approved         Refused
Material Change of Use                                                                                                 5               0

Building Work Assessable Against the Planning Scheme                                                                   5               0

Exemption Certificate                                                                                                  1               0

Operational Works                                                                                                     10               0
Reconfiguring a Lot                                                                                                    1               0
Referral Agency Response                                                                                               4               0

Minor Change                                                                                                          10               1

Other Change                                                                                                           0               0

TOTAL - APPLICATIONS DETERMINED UNDER DELEGATION                                                                      36               1

TOTAL - APPLICATIONS DETERMINED BY COUNCIL                                                                             1               0


                                      Primary
Application ID        Primary Group                                          Full Details                        Stage/Decision   Decision Made
                                      Category

                                                        7 Noosa Parade Noosa Heads - Dwelling House (Basement)
MCU25/0053              NP20MCU        Code                                                                        Approved        21/11/2025
                                                                    COMBINED WITH OPW25/0074


                                                               30 Cooran Ct NOOSA HEADS - Land & Jetty
MCU25/0083              NP20MCU        Code                                                                        Approved        11/11/2025
                                                              COMBINED APPLICATION WITH OPW25/0125


                                                                                                                                  Page 113 of 141

Page 114

                                 Primary
Application ID   Primary Group                                                  Full Details                                      Stage/Decision   Decision Made
                                 Category
                                                                 5 Lake Street Tewantin - Dual Occupancy
MCU25/0096         NP20MCU        Code                                                                                              Approved        11/11/2025
                                                                      COMBINED WITH OPW25/0146

                                            115 Eumundi Noosa Road Noosaville - Adds to Existing Educational Establishment (3 x
MCU25/0099         NP20MCU        Code                                                                                              Approved        17/11/2025
                                                                     Sheds & Acoustic Fencing)

                                                              18 The Peninsula NOOSAVILLE - Landing & Jetty
MCU25/0122         NP20MCU        Code                                                                                              Approved        19/11/2025
                                                               COMBINED APPLICATION WITH OPW25/0172


DBW25/0113        NP20DBW         Code         19 Dwyer Street Sunshine Beach - Dwelling House (Roof Terrace) & Demolition          Approved        18/11/2025



                                            6 Mary River Road Cooroy - Amenities Block in Recreation & Open Space Zone within
DBW25/0116        NP20DBW         Code                                                                                              Approved        20/11/2025
                                                                             Flood Overlay

                                                      68 Butler Street Tewantin - Dwelling House (Roof Pitch & Eaves)
DBW25/0128        NP20DBW         Code                                                                                              Approved        27/11/2025
                                                                      COMBINED WITH RAP25/0041


                                            42 Lukes Road Cooroy Mountain - Adds to Dwelling House (Secondary Dwelling over
DBW25/0134        NP20DBW         Code                                                                                              Approved        20/11/2025
                                                                                65 m)



                                             19 Ponderosa Drive Cooroy - Adds to Dwelling House (Shed in Riparian Buffer Area)
DBW25/0139        NP20DBW         Code                                                                                              Approved        17/11/2025
                                                                      COMBINED WITH RAP25/0043



                                                                                                                                                   Page 114 of 141

Page 115

                                  Primary
Application ID   Primary Group                                                      Full Details                                     Stage/Decision   Decision Made
                                  Category
                                 Planning Act   135 Outlook Drive Tewantin - Exemption from Code Assessment for Front Fence over
 EXE25/0040        Planning                                                                                                            Approved        28/11/2025
                                   Request                                           1.8m
                                                          7 Noosa Parade Noosa Heads - Op Works - Earthworks (> 10m³)
OPW25/0074         NP20OPW          Code                                                                                               Approved        21/11/2025
                                                                          COMBINED WITH MCU25/0053

OPW25/0101         NP20OPW          Code                  51 Seaview Terrace SUNSHINE BEACH - Op Works - Stormwater                    Approved        11/11/2025


OPW25/0116        NP20OPW           Code          15 Olivine St COOROY - Roadwork, Stormwater, Landscaping, Vehicle Crossover          Approved        5/11/2025


OPW25/0121         NP20OPW          Code           33a Pavilion St POMONA - Road work, Drainage work, Stormwater, Earthworks           Approved        28/11/2025

                                                                    30 Cooran Ct NOOSA HEADS - Land & Jetty
OPW25/0125        NP20OPW           Code                                                                                               Approved        11/11/2025
                                                                   COMBINED APPLICATION WITH MCU25/0083

OPW25/0139         NP20OPW          Code                        3 Ferguson St SUNSHINE BEACH - Vehicle Crossover                       Approved        24/11/2025

                                                5 Lake Street Tewantin - Stormwater, Drainage, Earthworks, Landscaping & Crossover
OPW25/0146         NP20OPW          Code                                                                                               Approved        11/11/2025
                                                                          COMBINED WITH MCU25/0096

OPW25/0156         NP20OPW          Code                      27 Orealla Crescent SUNRISE BEACH - Vehicle Crossover                    Approved        25/11/2025

                                                                  18 The Peninsula NOOSAVILLE - Landing & Jetty
OPW25/0172        NP20OPW           Code                                                                                               Approved        19/11/2025
                                                                   COMBINED APPLICATION WITH MCU25/0122
OPW25/0174         NP20OPW          Code                       22 Arakoon Cres SUNSHINE BEACH - Vehicle Crossover                      Approved        11/11/2025

                                                  149 Black Mountain Range Road Black Mountain - Reconfiguration of a Lot - 1 Lot
 RAL25/0014        NP20RAL          Code                                                                                               Approved        7/11/2025
                                                                                   into 2 Lots



                                                                                                                                                      Page 115 of 141

Page 116

                                    Primary
Application ID   Primary Group                                                        Full Details                                       Stage/Decision   Decision Made
                                    Category

                                 Referral Agency         68 Butler Street Tewantin - Dwelling House (Setbacks & Garage Height)
 RAP25/0041        NP20RAP         Response -                                                                                              Approved        27/11/2025
                                    Planning                                COMBINED WITH DBW25/0128


                                 Referral Agency            19 Ponderosa Drive Cooroy - Adds to Dwelling House (Setbacks)
 RAP25/0043        NP20RAP         Response -                                                                                              Approved        17/11/2025
                                    Planning                                COMBINED WITH DBW25/0139

                                  Early Referral
                                                   30 Oasis Drive Noosa Heads - Adds to Dwelling House - Pool Enclosure (Site Cover &
 ERR25/0004        NP20RAP         Response -                                                                                              Approved        18/11/2025
                                                                                       Setbacks)
                                    Planning
                                  Early Referral
                                                      27 The Anchorage Noosaville - Adds to Dwelling House (Stairs within 4.5m of
 ERR25/0010        NP20RAP         Response -                                                                                              Approved        28/11/2025
                                                                                  Revetment Wall)
                                    Planning
                                 Minor Change       11 Crusoe Court Castaways Beach - Change to DA - Change to Plans (Additions to
DBW19/0003.03     NP20DBW                                                                                                                   Refused        21/11/2025
                                  to Approval                            Detached House (Coastal Protection)

                                 Minor Change        35 Cooran Court Noosa Heads - Change to DA - Change to Conditions (Dwelling
DBW22/0186.01     NP20DBW                                                                                                                  Approved        26/11/2025
                                  to Approval                           House (Excavation exceeding 100 m³)


                                 Minor Change 83 Coachwood Terrace Black Mountain - Change to DA - Extension of Currency Period
DBW23/0084.01     NP20DBW                                                                                                                  Approved        6/11/2025
                                  to Approval  (Dwelling House & Convert Studio to Secondary Dwelling (Within 200m of Ag Land)


                                 Minor Change
132004.4029.02     NP20MCU                         04/4029 - 6 Martin Street Peregian Beach - Change to DA - Alts & Adds to Unit 1 & 2     Approved        26/11/2025
                                  to Approval

                                 Minor Change          TPC 808 - 2/61 Noosa Parade Noosa Heads - Change to DA - Adds to Unit 2
51901.4147.05      NP20MCU                                                                                                                 Approved        20/11/2025
                                  to Approval                              (MULTIPLE DWELLING 3 UNITS)



                                                                                                                                                          Page 116 of 141

Page 117

                                   Primary
Application ID   Primary Group                                                   Full Details                                    Stage/Decision   Decision Made
                                   Category
                                 Minor Change    3B-259 - 11 Eumundi Noosa Road Noosaville - Change to DA - Revised Design of
 51992.213.03      NP20MCU                                                                                                         Approved        20/11/2025
                                  to Approval                    Ablution Building (SPECIAL USES - SCOUTS)

                                                 245 David Low Way Peregian Beach - Change to DA - Amendments to Align with
                                 Minor Change                       Approval (Dual Occupancy & Office)
MCU21/0228.02      NP20MCU                                                                                                         Approved        20/11/2025
                                  to Approval
                                                                      COMBINED WITH OPW21/0364.02

                                                37 Bottlebrush Avenue Noosa Heads - Change to DA - Changes to Layout (Multiple
                                 Minor Change                                Dwelling (3 units)
MCU22/0087.01      NP20MCU                                                                                                         Approved        17/11/2025
                                  to Approval
                                                                      COMBINED WITH OPW22/0140.01

                                 Minor Change    33 Seaview Terrace Sunshine Beach - Generally in Accordance (Dwelling House
RAP21/0043.02      NP20RAP                                                                                                         Approved        3/11/2025
                                  to Approval                                (Height & Setback)

                                 Minor Change    62 Gateway Drive Noosaville - Generally in Accordance with Building Approval
MCU22/0084.01      NP20MCU                                                                                                         Approved        18/11/2025
                                  to Approval                                   (Warehouse)
                                 Minor Change
OPW23/0120.01      NP20OPW                             23 Edward St NOOSAVILLE - Generally in Accordance Landscaping               Approved        21/11/2025
                                  to Approval




                                                                                                                                                  Page 117 of 141

Page 118

GENERAL COMMITTEE MEETING                                                         19 JANUARY 2026


8.4         PROCUREMENT CONTRACTS ASSESSMENT WORKING TEAM -
            CONTRACT AWARDS UNDER CEO DELEGATION


Author            Acting Director Corporate Services, Margaret Gatt
                  Corporate Services Department
Index             ECM/27.10 Council Meeting Reports
Attachments        1.   Attachment 1 - General Committee Report - Awarded Contracts Table


EXECUTIVE SUMMARY
   •    In accordance with Council’s Procurement Policy, for any large-sized contractual
        arrangements ($200,000 excluding GST or more) where the awarding of a contract occurs
        under CEO Financial Delegation (up to $1,000,000 excluding GST) the process may be
        supported by the Procurement Contracts Assessment Working Team (PCAWT).
   •    The PCAWT may be convened to provide an independent review of the procurement
        process, prior to presentation to the CEO for award.
   •    As per the Policy, disclosure requirements have been introduced for the Director Corporate
        Services to report these CEO delegated awards to Council bi-annually.
   •    For the period July 2025 – December 2025 four (4) relevant contracts were awarded under
        PCAWT review and CEO delegated approval, as outlined in Attachment 1 of the report.

RECOMMENDATION
That Council note the report by the Acting Director Corporate Services to the General Committee
Meeting dated 19 January 2026 for contracts awarded under CEO Delegation, via the Procurement
Contracts Assessment Working Team, for the period 1 July 2025 to 31 December 2025.


REPORT
Ongoing market changes coupled with the competition for contractors has meant increased
challenges for local governments in procuring goods and services in a timely manner. As such, the
time it takes to award contracts is critical in Council’s ability to meet growing demands for goods and
services.

In this regard, Council established the Procurement Contracts Assessment Working Team (PCAWT)
in the 2017/2018 via an Organisational Guideline. The original intention of the PCAWT was to
provide increased review oversight for the awarding of contracts within the CEO delegation of $1
Million, that were sought via a public invitation to tender, and whereby expediting the award process
outside the normal Council meeting cycle was advantageous to Council.

More recently, the updated Procurement Policy adopted by Council in June 2024 incorporated
reinforced policy protocol for the PCAWT principles whilst also expanding its scope to be able to
consider any large-sized ($200,000 or more, exc. GST) contractual arrangements procured in
accordance with the Local Government Regulation 2012 and Council’s policies and guidelines i.e.
in addition to public tenders, the PCAWT may also convene to consider and review any large-sized
procurement activity including quotations (under panel arrangement or otherwise), and other forms
of procurement.

The inclusion of the PCAWT into policy, coupled with expanding the scope of procurement activity
the team considers/reviews aims to:



                                                                                               Page 118 of 141

Page 119

GENERAL COMMITTEE MEETING                                                           19 JANUARY 2026


   •   Continue to facilitate the award of public tenders, within CEO delegation, in order to expedite
       contract award.
   •   Provide a mechanism for the additional review of any large-sized procurement activity,
       between $200,000 - $1,000,000 (exc. GST), prior to recommendation to CEO for award.
   •   Enhance the existing governance and probity framework, for Council and CEO, for the
       awarding of large-sized contracts by the CEO.


   1. CEO Delegation
In accordance with Section 41 of the Council Register of Delegations – Council to Chief Executive
Officer (CEO), the CEO has been granted the authority (by Council) to:

   (a) undertake the following procurement and contracting activities:
   (i) invite written quotes for medium-sized contractual arrangements;
   (ii) invite written tenders for large-sized contractual arrangements;
   (iii) invite expressions of interest (following Council resolution);
   (iv) invite offers for the sale of valuable non-current assets (other than sale of land) by written
   tender or auction; and


   (b) make, enter into, amend or discharge contracts (established by the aforementioned
   methods) for up to $1,000,000 (excluding GST) for the:
   (i) procurement of goods and services (including contracts about carrying out of works);
   (ii) the disposal of valuable non-current assets (but not the sale of land);
   (iii) the disposal of goods and assets (that are valuable non-current assets).


   2. Procurement Policy
In accordance with Council’s Procurement Policy the Procurement Contracts Assessment Working
Team (PCAWT) has been established for the following purpose:

   Where it has been identified that the award of a large sized contractual arrangement outside of
   the normal Council meeting cycle is considered advantageous to Council, the convening of the
   Procurement Contracts Assessment Working Team (PCAWT) may be requested. The PCAWT
   may review requests for the award of large sized contractual arrangements up to the value of $1
   Million (excluding GST) that have been sought in accordance with the Local Government
   Regulation 2012 and Council’s procurement policy and guidelines.


   3. Procurement Contracts Assessment Working Team (PCAWT)
The PCAWT’s role is to review specific requests to approve large-sized contractual arrangements
outside of the normal Council meeting cycle. The PCAWT is comprised of the following Council
Officers*:
   1. Director, Corporate Services
   2. Executive Officer Internal Audit and Corporate Performance
   3. Procurement Manager




                                                                                              Page 119 of 141

Page 120

GENERAL COMMITTEE MEETING                                                          19 JANUARY 2026


(*Where one of the above officers is not available, or not suitable due to probity, a substitute officer
is sought to comprise the PCAWT.)

Once convened the PCAWT’s role is to undertake a review of the procurement process and
evaluation to ensure that the process was carried out in accordance with Council’s policies and
guidelines. The review may include, but is not limited to, the following:

   •   Reviewing the evaluation, including scoring, that has been submitted by the evaluation panel;
   •   Reviewing supplier responses to the invitation to tender/quotation;
   •   Consider consistency on evaluation, to other procurement outcomes and policy alignment;
   •   Clarifying any aspects of the procurement/evaluation process, and proposed award/contract,
       with the evaluation panel chair and/or Procurement Advisor.

If the PCAWT is satisfied with the procurement process and the subsequent recommendation for
award, a recommendation (report) will be made to the CEO for consideration/award.


   4. Reporting Requirements
In accordance with Chapter 6, Part 4, Local Government Regulation 2012, all contractual
arrangements worth $200,000 or more (exclusive of GST) are published via Council’s website, after
award.

To provide additional disclosure, as per policy, the Director Corporate Services will also report
PCAWT reviewed - CEO awarded contracts to Council on a bi-annual basis.


Link to Corporate Plan
Theme No. 5 – Excellence
This theme focuses on customer experience, financial sustainability, innovation and technology,
levels of service, governance, our employees and volunteers, funding streams and asset
management practices.




Previous Council Consideration
11.2.4. PROCUREMENT AND CONTRACTS ASSESSMENT WORKING TEAM - CONTRACT
AWARDS UNDER CEO DELEGATION
That Council note the report by the Director Corporate Services to the Services and Organisation
Committee Meeting dated 8 July 2025 for contracts awarded under CEO Delegation, via the
Procurement Assessment Working Team for the period 1 January 2025 to 30 June 2025.




Finance
Funding of these procurement activities occurs within adopted budgets. Where any procurement
requires additional funding, this is generally addressed through budget review.




                                                                                                Page 120 of 141

Page 121

GENERAL COMMITTEE MEETING                                                       19 JANUARY 2026


Risk & Opportunities
                                  Risk                        Mitigation/Opportunity
                         Awarding contracts
                                                 The PCAWT/CEO process offers 2 stages of
                         outside of Council
                                                 review (PCAWT and CEO), in addition to the
                         Meetings perceived
                                                 original procurement evaluation, before a decision
                         as not being a robust
                                                 to award.
                         process.
                                                 A report must first be submitted to the PCAWT,
PCAWT Process            Contracts may be
                                                 generally by the procurement evaluation chair,
                         awarded outside of
                                                 outlining the details of the procurement/project
                         Council Meetings,
                                                 and rationale for seeking the PCAWT. Should the
                         that may otherwise
                                                 PCAWT, or subsequently the CEO, deem that the
                         require
                                                 contract award should be considered by Council,
                         consideration/debate
                                                 the process can be directed through the normal
                         directly by Council.
                                                 Council Meeting cycle/options.
                                                 The PCAWT/CEO contract award process is only
                         Risk that a contract
                                                 available for large-sized contractual arrangements
                         award is made
Delegated Authority                              within the delegation of the CEO - $1,000,000
                         without delegated
                                                 (exclusive of GST), as outlined under Council
                         authority.
                                                 Policy.
                                                 In accordance with Part 4, Section 237 of the
                                                 Local Government Regulation 2012 Council
                                                 publishes the details of contractual arrangements
                         Transparency/visibility
                                                 of $200,000 (exc. GST) or more both, on
                         of awarding large-
                                                 Council’s public website and Tewantin Building
Transparency &           sized contracts (within
                                                 public noticeboard.
Accountability           CEO Delegation)
                         outside of Council
                                                 Council’s procurement policy requires that
                         Meetings.
                                                 contract awards via the PCAWT be reported to
                                                 Council bi-annually by the Director, Corporate
                                                 Services.


Human Rights


Human Rights Compatibility Statement
In developing this Report, the subject matter has been considered in accordance with the
requirements of the Queensland Human Rights Act 2019. It is considered that the subject matter
does not conflict with any human rights and supports a human rights approach to decision making
by Council. Council representatives will endeavour to act and make decisions under this report in a
manner that is compatible with human rights. This report should be read in conjunction with Council’s
Human Rights Policy.


Consultation
External Consultation - Community & Stakeholder
NA
Internal Consultation
Departments consulted:




                                                                                             Page 121 of 141

Page 122

GENERAL COMMITTEE MEETING                                                      19 JANUARY 2026


   Office of the CEO, Mayor &         Community Services               Corporate Services
           Councillors
    Mayor & Councillors             Director                    X   Director
    Chief Executive Officer         Community Development           Financial Services
    Executive Officers              Sport & Active Lifestyles       Fleet
    Community Engagement            Arts & Culture                  Revenue Services
    People & Culture                Community Connection            ICT
    Governance                      Customer Experience         X   Procurement

                                                                    Commercial Property

    Strategy & Environment          Development & Regulation        Infrastructure Services
    Director                        Director                        Director
    Strategy & Sustainability       Development Assessment          Infrastructure Planning, Design
                                                                    and Delivery
    Economic Development        &   Local Laws                      Civil and Asset operations
    Destination Management
    Environmental Services          Environmental Health            Waste
    Innovation & Digital Hub        Building & Plumbing             Building & Facilities
                                    Property / Permits              Disaster Management




                                                                                              Page 122 of 141

The text continues on page 123.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.