Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2014-03-25 Planning & Organisation Committee Agenda Pages 81-167

of 87

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

PLANNING & ORGANISATION COMMITTEE MEETING AGENDA                                 25 MARCH 2014


As shown in Figure 5 below.




                           Figure 5 – Proposed Buffer to Lake Weyba

Extensive cut and fill earthworks are proposed, primarily to fill flood affected land to create
Precinct 2. Engineering plans indicate a total fill volume of roughly 149,000m 3, with the material
to be excavated primarily from a ridgeline adjacent the lake in Precinct 1 and from a number of
areas within Precinct 3. The plan below indicates the areas of cut (shown as warm colours) and
fill (shown as cool colours) and is included at A3 size as Attachment 3.




                                   Figure 6 – Cut and Fill Plan




                                                                                  Page 91 of 231
Log in to download the original file

2014-03-25 Planning & Organisation Committee Agenda Pages 81-167(PDF, 5MB).pdf · 4.9 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.