Original source · versioned page text
2014-03-25 Planning & Organisation Committee Agenda Pages 81-167
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 25 MARCH 2014
Coastal Plan Report
Ecological Report
Koala Report
Property Vegetation Management Plan
Bushfire Report
Traffic Report
Traffic Acoustic Report
Groundwater Report
Contaminated Land report
Agricultural Land Report
Integrated Water Cycle Management Plan
Electrical & Communication Services Report
Sustainability Report
Needs Report
Biting Insects Report
Community Title Report
Cultural Heritage Report
1.2 Application Includes Grounds to Support
The application material recognises that the proposal must demonstrate sufficient grounds to
gain approval to justify the development’s conflicts with relevant planning instruments. 34 items
are listed by the applicant in support of the development. Further details and discussion of the
grounds are included in Section 6.6 of this report.
2 PRELIMINARY APPROVAL OVERRIDING LOCAL PLANNING SCHEMES
Division 2 of the Sustainable Planning Act provides for the granting of a preliminary approval. A
preliminary approval, if given, would approve the Noosa on Weyba development for urban use
but would not authorise development to proceed without further development permits being
issued such as: reconfiguring a lot applications to create the precincts/ residential lots; material
change of use applications for the higher density residential attached housing, retirement and
commercial uses; and various operational works and building approvals.
Section 242 provides for the type of preliminary approval sought by the applicant, which would
override the local planning scheme provisions to the extent detailed in the application. An
approval would consent to the changes in land use and apply differing codes and levels of
assessment to future development.
The Act does not require a preliminary approval for development but they commonly provide for
an orderly assessment framework for large staged developments, such as proposed.
Page 93 of 231
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.