Wingara Hills Pty Ltd
Based on our slope stability assessment, it is our opinion that there is a Low Risk for the proposed
development, provided that the recommendations in this report are implemented. This level of risk is
normally acceptable to regulators (i.e. Council).
The recommendations provided in this report are provided to enable an inferred factor of safety against
landslide of over 1.5. The above recommendations must be reviewed when earthworks and building designs
are finalised, to confirm an acceptable factor of safety is achieved.
7.0 DEVELOPMENT IMPACTS & MITIGATION MEASURES
It is our opinion that this site is suitable for the proposed development, from a geotechnical viewpoint, subject
to implementation of the recommendations provided in this report. The potential impacts on slope stability of
the proposed development have been considered, and the measures recommended below have been
designed to mitigate those impacts. Building development should follow normal slope maintenance
procedures and the document ‘General Guidelines for Hillside Construction’, which is attached in Appendix
D.
7.1 Earthworks
Earthworks should be carried out in accordance with Australian Standard AS 3798-2007 ‘Guidelines on
Earthworks for Commercial and Residential Developments’. Filling should not exceed 1 m in depth.
7.1.1 Site Preparation & Trafficability
Site preparation in building and pavement areas should include the following:
Strip the surface of vegetation, organic matter, organic rich soils (topsoils) and severely root affected
soils.
‘Proof roll’ the stripped surface by several passes of a minimum 10 tonne roller to identify loose or
soft areas.
An experienced geotechnical engineer from Core should carry out an inspection of the subgrade 'proof roll'.
Loose/soft areas identified by proof rolling and/or inspection will require treatment by either of the following
methods:
Over-excavation and replacement with suitable fill compacted in layers (refer Section 7.1.4); or
Re-compaction of the loose or soft material provided that it does not contain substantial organic
matter or deleterious substances.
At the time of the investigation the site was trafficable with a tracked excavator with caution. Following
stripping of topsoil materials, trafficability issues should be anticipated following rainfall. Due to the potential
for poor trafficability across the site, it would be prudent to allow for the placement of a compacted granular
fill layer particularly in access road and laydown areas. A geotextile separation layer between the natural
ground and granular fill may also be required.
7.1.2 Excavations
Excavations into the residual soil, and extremely weathered materials/rock should be achievable using
conventional small to large earthmoving equipment (i.e. 6 to 20 tonne excavators).
Bands of higher strength mudstone may be encountered requiring ripper tyne excavation (e.g. as found in
test pit TP1).
7.1.3 Batter Slopes
For short-term construction periods, excavated un-surcharged faces could be battered at 1V:1H in the
residual stiff to hard clayey soils, and weathered material and underlying mudstone. Shoring will be required
to enable personnel entry into near vertical sided trenches deeper than 1 m.
Flatter batters may be required if significant groundwater seepage is encountered or if exposed faces are not
protected from erosion by rainfall.
J002915-001-R-Rev0 8
Document Set ID: 24031832
Version: 1, Version Date: 14/08/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.