Skip to the record
Beware of cheap imitations.

Council archive · source document

07/2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published] · 132007.2398

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                                                                                                      2007/2398




                 Any agreement with ENERGEX or an approved ENERGEX Electrical Design Consultant shall
                 be wholly at the applicant’s expense and shall not entail a financial encumbrance on future
                 purchasers of the proposed lots.
          86.    The requirements of ENERGEX shall be satisfied in relation to any existing services traverse
                 the site. Written confirmation by ENERGEX that satisfactory arrangements have been made to
                 formalise any required easements and/or existing informal services shall be submitted prior to
                 Council endorsing the Plan of Survey.
          87.    Streets lighting and pathways lighting throughout the development site must be provided in
                 accordance with Australian Standards.
          88.    Street lighting shall be provided along Pearsons Road frontage of the site in accordance with
                 Australian standards.
          Telecommunication
          89.    The requirements for TELECOMMUNICATION services shall be satisfied in relation to the
                 provision of new telephone services to the developed site. In this regard written confirmation
                 from an approved telecommunication agency shall be submitted to the Council prior to Council
                 endorsing the Plan of Survey.
          Erosion and Sediment Control
          90.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
                 site. Site control measures such as silt fencing, controlled gravel access to the site and
                 controlled disposal of waste, will be necessary.
                 In this regard plans detailing the methods of controlling erosion and sediment are required to
                 be submitted to the Council for approval prior to obtaining a Development Permit for
                 Operational Works.
          Contributions Towards Council Infrastructure
          91.    Monetary contributions shall be paid to Sunshine Coast Regional Council towards the cost of
                 providing and/or upgrading various infrastructure at the rates applicable at the time of
                 payment. An estimate only of the contribution amounts under the current Council policies and
                 requirements is outlined in the table below:
                                                                                                Rebate       for
                                                                                  Total         Eligible
                INFRASTRUCTURE NETWORK
                                                                                  Contributio   Community
                                                                                                Organisation        Total
                                                                                  n                                Amount
Stage           PSP    12   PSP      16   PSP     17   PSP     20   Rural     /   Applicable    Charitable non-    Payable
                Public      Rural         Water        Pathway      Local         to            profit      for
                                                                                  Developme                           $
                Open        Sewerage      Headworks    Trunk        Roadworks                   community
                Space       Headworks                  Network                    nt            services
                (Park)                                                                          facilities
Stage 1         $105,504       $202,017     $197,531      $49,374       $17,848     $572,274         100%            $0
Stage 2           $22,936       $65,655      $59,003      $10,495        $7,349     $165,438         100%            $0
Stage 3           $31,673       $90,667      $81,480      $14,492       $10,149     $228,461         100%            $0
Stage 4           $14,198       $40,644      $36,525       $6,497        $4,549     $102,413         100%            $0
Stage 5           $22,936       $65,655      $59,003      $10,495        $7,349     $165,438         100%            $0
Stage 6           $26,212       $75,035      $67,432      $11,994        $8,399     $189,072         100%            $0
Stage 7           $19,659       $56,276      $50,574       $8,995        $6,299     $141,803         100%            $0
Stage 8           $21,844       $62,529      $56,193       $9,995        $6,999     $157,560         100%            $0
Stage 9           $13,106       $37,517      $33,716       $5,997        $4,200      $94,536         100%            $0
Total =         $278,068       $695,995     $641,457     $128,334       $73,141   $1,816,995         100%            $0




                                                                                                       11 of 31

Used in these records

About this file

File size
645 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2398 - SUPERSEDED Negotiated Decision Notice & copy sent to Referral Agencies [As Published].pdf · 645 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.