Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Minor Change Existing Approval - MCU21 0158 02 (As Published)

of 8

Page text shows just the words. Original shows the document exactly as it was published.

                      Site Access and Driveways
               19.    A sealed access driveway must be provided from Doonella Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an   Operational    Works    approval     and   must    include  in   particular any
                      improvements/modifications to the existing access driveway to achieve compliance with
                      Council’s Standard Drawings RS-049 and RS-050 and any associated addendum
                      Car Parking
               20.    A minimum of 4 car parking spaces must be provided on the site and made available and
                      accessible at all times. The works must be undertaken in accordance with an Operational
                      Works approval and must include in particular dimensions, crossfalls and gradients in
                      accordance with Australian Standard AS/NZS2890.1:2004 Parking Facilities
               21.    All vehicles must enter and exit the site in a forward gear. The access driveway must provide
                      sufficient area for vehicles to access the site and space in a forward gear, manoeuvre on site
                      and exit the site in a forward gear in a total of 3 movements.
                      Stormwater Drainage
               22.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and be generally in accordance with:
                      a.      drawing number 20210038, issue B prepared by Recor dated 8 November 2021, and
                      b.      The Stormwater Management Report Project No: 20210038, version 2 prepared by
                              Recor dated 9 November 2021
                      This condition is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
               23.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property.
                      Services
               24.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               25.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               26.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               27.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               28.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.
                      Earthworks and Retaining Walls
               29.    All earthworks and associated batters must be undertaken in accordance with an Operational
                      Works approval, and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.




                                                                                                       Page 4 of 8
Document Set ID: 23927329
Version: 4, Version Date: 14/07/2025
Log in to download the original file

Minor Change Existing Approval - MCU21 0158 02 (As Published).pdf · 161 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.