Original source · versioned page text
2017-06-12 General Committee Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 12 JUNE 2017
Page 7 of 32
GENERAL COMMITTEE MEETING AGENDA 12 JUNE 2017
Final Evaluation
Weighted Attribute Evaluation Spreadsheet
[ContractNo; tt TOOT
ee ee
ee
No, |VAME OF TENDERER excl of OS t—>—_+—_}+—_+—_+-—_ +—_ +--+
1 Lani © | a 8 & " ian " ~3
3 Biniris (Aust) PtyLtd The ratings
4 [McCullough CleaningServices +0 (zero) = Unacceptable ~ a fail for that criteria and extreme risk
5 |LagunaLawns&Gardens Cid + 20 (twenty) = Very Poor - the content of the submission for that criteria is of a low standard and high risk
6 [DW Commercial Cleaning Services PtyLtd + 40 (forty) = Poor — the content of the submission for that criteria is unimpressive and poses a moderate risk
7 |CMBM Facility ServcesPtyLtd + 60 (sixty) = Good - the content of the submission for that criteria is meritable and will need to be monitored if awarded
8 |lanTattersal * 80 (eighty) = Very Good — the content of the submission for that criteria is of a high standard and advantageous
9 lEcovist + 100 (one-hundred) = Exceptional — the content of the submission for that criteria is flawiess / outstanding and most advantageous
i" Swampy Changs Once all the data is entered the resultant scores based on the price and non price elements are automatically calculated for you
[TotalFocusConcepts
12 [Total Building Maintenance
13
NON-CONFORMING TENDERS Number of Tenders Evaluated = [13 ]
Poo notevaluatoc
- 1 2 3 4 5 6 7 8 9 10 41 12 13
emtencmn [women || ace |r| oe | | ey [S| es | eee [oS
maser § | 2 | % | 20 | m | 350 | a | 200 | o | as | s | 200 | 6 | 200 | oo | «50 | oo | 450 | oo | 200 | oo | soo | vo | 250 | se | 200 |
Comctesweriencescapscty | am] se | sco | se | sxe | oe | ssz0 | 7 | ao| os | r900{ mo | woo] a | oo] os | 10 | oo | r9m | oo | soo | se | 100 oo | 1360 se | 1100 |
peetrocoioay me] | 2m | ie | to | te | to | im | 240 | a | sc | om | 260 | sm | aa | mo | 300 | 2s | 205 | me | 200 | 25 | sso | ass | o55 | o6 | 200 |
a I a
a a EE EE
envronmentasusamabmy |S] | om | se | zm | w | am | o | 150 | oo | 2s | ov | 20 | ow | ao | so | 2% | re | sm | rm | sm | a7 | 205 | m | s70 | oo | 200 |
Sentinaiontouscattcoromy | tox | + | oso | x2 | cue | sas | sxe | a | reo | ico | om] a | 200 | zw | aw | too | sooo] soo | rom] a | zoo | ze | au | ss | sos | zo | 200 |
Nommalised Technical Score (Tn)
Total Fees (Pc) 30% 7,987 19,048 12,036 14,560 18,018 18,287 19,513 121,539 21,580 1,805 5,273
Price Score 164 159 145 134 118 117 111 102 102 101 42
Normalised Price Score (Pn) 100 97 89 82 72 71 68 62 62 62 oO
iWeighted Price Score (P
elements
OTHER DETAILS
Assesment panel member 1 Facility Officer, Planning and Infrastructure
Assesment panel member 2 Facility Officer, Planning and Infrastructure The Contract Administrator confirms the above weightings
Assesment panel member 3 A0Director, Planning and Infrastructure Contract Administrator's signature:
Assesment panel member 4
Page 7 of 32See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.