Original source · versioned page text
Stormwater Management Plan MCU17/0014
Original PDF page 11, section 1. The text section number identifies this passage in the reader.
BORNHORST + WARD | DOONELLA STREET UNITS
Figure 3: Proposed Treatment Train
5.4 RESULTS
The pollutant reductions for the ultimate developed phase of the site, with the inclusion of the detailed
treatment train, as obtained from the MUSIC model and analysis are summarised in Table 4.
Table 4: Pollutant Removal Rates Discharge
Pollutant TSS (%) TP (%) TN (%) GP (%)
Treatment Train Effectiveness 85.7 68.3 45.0 100.0
WQOs 80.0 60.0 45.0 90.0
As indicated in the table above, the removal rates for the target pollutants; total suspended solids (TSS), total
phosphorus (TP), total nitrogen (TN) and gross pollutants (GP) are all above the water quality objectives
stipulated in the State Planning Policy for the South East Queensland Region. Therefore, the proposed
treatment train for these areas will yield satisfactory pollutant removal.
Bornhorst + Ward Pty Ltd
Level 4, 67 Astor Terrace, Spring Hill, Qld 4000 Page 8
Ph. (07) 3013 4699 / [email protected]
A.B.N. 78 010 151 354
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan MCU17_0014.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.