Original source · versioned page text
Stormwater Management Plan MCU17/0014
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
BORNHORST + WARD | DOONELLA STREET UNITS
Table 1: Pre and Post Development Peak Stormwater Discharge to the Southeast Corner of Lot 32 Doonella
Street.
Parameter Existing Developed Difference
Area (ha) 0.2519 0.2519 0.00
Fraction Impervious (fi) 30% 85% 55%
Coefficient of Runoff (C10) 0.76 0.86 0.10
Catchment Details
Time of Concentration (min) 16.5 11.5 5.0
1 year Rainfall Intensity (mm/hr) 81.1 95.8 14.7
2 year Rainfall Intensity (mm/hr) 103.1 121.7 18.6
5 year Rainfall Intensity (mm/hr) 127.5 150.1 22.6
10 year Rainfall Intensity (mm/hr) 141.5 166.4 24.9
20 year Rainfall Intensity (mm/hr) 160.8 188.9 28.1
50 year Rainfall Intensity (mm/hr) 186.0 218.2 32.2
100 year Rainfall Intensity (mm/hr) 205.2 240.6 35.4
100% AEP (m3/s) 0.0345 0.047 0.012
50% AEP (m3/s) 0.0466 0.063 0.016
Discharge
3
20% AEP (m /s) 0.0644 0.087 0.022
3
10% AEP (m /s) 0.0753 0.101 0.026
3
5% AEP (m /s) 0.0898 0.121 0.031
3
2% AEP (m /s) 0.1138 0.153 0.039
1% AEP (m3/s) 0.1309 0.168 0.037
As indicated in the table above, the peak discharge from the development to the southeast corner of lot 32
Doonella Street will increase in the developed scenario. To ensure that there will be no impact on the
downstream infrastructure or properties as a result of the development, construction of a detention system is
proposed to mitigate the expected discharge increase. The detention system proposed is a below ground
storage tank.
4.1.3 Detention System
Peak discharges for the development will increase as a result of the proposed development. In order to
mitigate these flows a detention system is proposed. An initial detention sizing has been completed using the
Rational Method to estimate the size of the system. The detention volume required to mitigate peak flows
from the proposed development to pre-developed conditions is 45m3. It is proposed to provide this volume in
a below ground storage tank near the lawful point of discharge, in the southeast corner of lot 32 Doonella
Street. Refer to the Stormwater Layout Plan within Appendix B for further information.
5. STORMWATER QUALITY
The following is an extract from Part E: Interim Development Assessment Requirements within State Planning
Policy which describes developments that the policy is applicable to:
Receiving waters – a development application for any of the following:
Bornhorst + Ward Pty Ltd
Level 4, 67 Astor Terrace, Spring Hill, Qld 4000 Page 5
Ph. (07) 3013 4699 / [email protected]
A.B.N. 78 010 151 354
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Stormwater Management Plan MCU17_0014.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.