Stormwater Management Plan MCU17/0014

of 67

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 8, section 1. The text section number identifies this passage in the reader.

BORNHORST + WARD | DOONELLA STREET UNITS


                     Table 1: Pre and Post Development Peak Stormwater Discharge to the Southeast Corner of Lot 32 Doonella
                                                                   Street.


                                                      Parameter                             Existing   Developed   Difference
                                                      Area (ha)                             0.2519      0.2519       0.00

                                                      Fraction Impervious (fi)               30%         85%          55%

                                                      Coefficient of Runoff (C10)            0.76        0.86        0.10
                                  Catchment Details




                                                      Time of Concentration (min)            16.5        11.5         5.0
                                                      1 year Rainfall Intensity (mm/hr)      81.1        95.8        14.7
                                                      2 year Rainfall Intensity (mm/hr)      103.1       121.7       18.6
                                                      5 year Rainfall Intensity (mm/hr)      127.5       150.1       22.6
                                                      10 year Rainfall Intensity (mm/hr)     141.5       166.4       24.9
                                                      20 year Rainfall Intensity (mm/hr)     160.8       188.9       28.1
                                                      50 year Rainfall Intensity (mm/hr)     186.0       218.2       32.2
                                                      100 year Rainfall Intensity (mm/hr)    205.2       240.6       35.4
                                                      100% AEP (m3/s)                       0.0345       0.047       0.012
                                                      50% AEP (m3/s)                        0.0466       0.063       0.016
                                  Discharge




                                                                      3
                                                      20% AEP (m /s)                        0.0644       0.087       0.022
                                                                      3
                                                      10% AEP (m /s)                        0.0753       0.101       0.026
                                                                  3
                                                      5% AEP (m /s)                         0.0898       0.121       0.031
                                                                  3
                                                      2% AEP (m /s)                         0.1138       0.153       0.039
                                                      1% AEP (m3/s)                         0.1309       0.168       0.037

                    As indicated in the table above, the peak discharge from the development to the southeast corner of lot 32
                    Doonella Street will increase in the developed scenario. To ensure that there will be no impact on the
                    downstream infrastructure or properties as a result of the development, construction of a detention system is
                    proposed to mitigate the expected discharge increase. The detention system proposed is a below ground
                    storage tank.

         4.1.3      Detention System

                    Peak discharges for the development will increase as a result of the proposed development. In order to
                    mitigate these flows a detention system is proposed. An initial detention sizing has been completed using the
                    Rational Method to estimate the size of the system. The detention volume required to mitigate peak flows
                    from the proposed development to pre-developed conditions is 45m3. It is proposed to provide this volume in
                    a below ground storage tank near the lawful point of discharge, in the southeast corner of lot 32 Doonella
                    Street. Refer to the Stormwater Layout Plan within Appendix B for further information.

         5.         STORMWATER QUALITY

                    The following is an extract from Part E: Interim Development Assessment Requirements within State Planning
                    Policy which describes developments that the policy is applicable to:

                              Receiving waters – a development application for any of the following:


 Bornhorst + Ward Pty Ltd
 Level 4, 67 Astor Terrace, Spring Hill, Qld 4000                                                                            Page 5
 Ph. (07) 3013 4699 / [email protected]
 A.B.N. 78 010 151 354

Log in to download the original (Stormwater Management Plan MCU17_0014.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.