Skip to the record
Search everything, all in one place.

Original source · versioned page text

Appendix I - Stormwater Management Plan

Attached to the e-mail MCU14/0083 Appendices.

of 77

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
        2.1.3 Existing Land Use

                 The development site presented in Figure 2.1 is identified as Lot 102 on SP241371.
                 The site is currently vacant. The site is bound by Gateway Drive on the east and
                 west. The eastern Gateway Drive joins the Eumundi-Noosa Rd/Rene St roundabout.
                 The western leg of Gateway Drive joins the eastern leg of Gateway Drive and
                 Eumundi-Noosa Rd. A vacant land parcel shares the southern boundary of the site. A
                 faction impervious of 50% has been assumed for the site and catchment contributing
                 to the underground drainage system in Gateway Drive.


       2.2       Developed Conditions


        2.2.1 Description of Proposed Development

                 The proposed development will consist of a tyre retailer (578.9m2) and provide 15 car
                 parks. The site will have a 95% fraction impervious area.


        2.2.2 Proposed Stormwater Drainage Infrastructure

                 The proposed stormwater drainage concept consists of the following:
                      An internal stormwater drainage network for the proposed development site
                       designed to convey 10 year ARI flows;
                      Flows associated with 10 year ARI rain events will be directed to the existing
                       drainage infrastructure on Gateway Drive;
                      Provision for 100 year ARI flows to be conveyed to Gateway Drive.




Mogpropmanagement Pty Ltd                        Page 3                                    205-002-002R
Stormwater Management Plan
Noosaville Site
Log in to download the original file

Appendix I - Stormwater Management Plan .pdf · 7.1 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.