Decision Notice - Change to an Existing Approval - 010.2006.00002232.001 [As Published] · 142006.2232.02
2006/2232
at appropriate stages of construction, during on-site meetings. Construction Technical Officer
will also sign the form at each stage when conditions required have been satisfied. The works
will be accepted “On Maintenance” after this form, signed by the inspector for each stage is
complete, together with a letter from the Engineer requesting that the works go “On
Maintenance”.
26. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
27. Council standards shall apply to these works unless otherwise modified herein.
28. The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply,
sewerage, footpaths, kerbing, landscaping, street furniture etc.) are protected against any
damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its
Consultants or Contractors through any cause whatsoever in the course of, directly or
indirectly, carrying out the engineering works, the Applicant and/or its Contractors shall
forthwith notify the Manager-Land Development and shall forthwith rectify the damage to that
property or facility at its cost and to the satisfaction of the Manager-Land Development, prior to
the commencement of the use or, alternatively, the Applicant may request the Council to carry
out the rectification work at the Applicant’s cost, such cost being paid by the Applicant to the
Council prior to the commencement of the use, provided that in the case of emergency the
Council shall be entitled to rectify such damage at the cost of the Applicant, such cost being
paid prior to the commencement of the use.
A management strategy to ensure no damage occurs to Council services shall be given to
Council for assessment prior to the pre start meeting.
29. The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
30. Construction work and other associated activities are permitted only during the hours of 7.00
am and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays,
except where extended hours are approved by the Manager-Land Development or his
nominee.
31. All signage, including that for safety during construction shall be in accordance with the
Manual of Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
32. Safe pedestrian access on Gympie Terrace and Thomas Street shall be maintained at all
times. Should footpath / road closures be necessary to carry out construction works, Council’s
Construction Technical Officer (ph 0410 512 505) must be notified prior to the proposed
closure.
33. Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “fines may be issued. Such
fines can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing No 1470-0-3 Construction Hydraulics, Council’s
Manager – Land Development may request further controls to be installed should approved
measures be inefficient.
34. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant
traps in accordance with the manufacturers specifications.
35. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant
traps on a weekly basis and after each storm event.
Page 4 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2006.00002232.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 68 KB (small file)
- File type
No other editions are linked here.