Original source · versioned page text
2014-01-13 Deamalgamation Report Attachment
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Section Key Strategic issues Major Initiative Sub- Elements Transfer/split Interim Organisation Development
deliverable (relates to Section
methodology)
Actions required Recommendation for new
council
3 Services Interim service Interim service 3.1 Service Identify services and Interim policy, For consideration of new
delivery delivery delivery review service delivery procedures and council
arrangements arrangements models and assess continuity plan developed
existing systems to ensure
operational capability
Review resources applied Establish interim
in all significant service organisational and
delivery systems operational
arrangements, systems
and processes to ensure
initial operational
capability
Align services with For consideration of new
interim functional council
structure
Review service Determine interim levels For consideration of new
levels/standards of service council
Consideration of shared Where necessary enter
services arrangements into contracts or shared
services arrangements
Develop community
information campaign in
relation to ongoing
services
3.2 Waste Review waste contracts Agreement to provisional For consideration of new
contracts and negotiate new arrangements and council if possible
council's cost allocation of interim position for waste
preferred arrangement services
3.3 Events Review open space policy Interim program for For consideration of new
and identify future planned planned events and council
events for new council funding requirements
area considered
Page 67 of 95
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.