Skip to the record
Search everything, all in one place.

Original source · versioned page text

8. Engineering Report and Plans

of 61

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (11.3 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 7, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
          PROPOSED DEVELOPMENT

The proposed development will consist of a single two storey building that will consist of three separate
residential tenancies on the first floor with office space on the ground floor. It is proposed that vehicle and
pedestrian access will be from the David Low Way frontage with carparking in the rear of the property. Civil
construction works will consist of bulk earthworks, carparking, stormwater drainage and the connection to
stormwater improvement devices. Internal water and sanitary drainage for the building will also be provided
under a separate plumbing approval as part of the building development. These will be connected to the
existing water and sewer main connections provided for the property.


Where required, sediment and erosion control devices will also be installed during all stages of construction.


The proposed lot configuration and the construction and connection of the associated civil services are shown
in Appendix A.



          DRAINAGE AND EXISTING TOPOGRAPHY

In general, the site is elevated at around 11.5m AHD in David Low Way Street and grades at approximately 4%
towards an existing low point at around RL 10.0m AHD in the south-west corner. There is an existing drainage
pit in this location which will be utilised as a lawful point of discharge for roofwater and carpark drainage. This
pit is connected to the existing infiltration system in the rear of the newly completed Community Centre.
Based on the sand subsoil conditions it is expected that this infiltration system will continue to permeate flows
effectively. Overland flows from major events will be diverted to the same location. It is expected that the
driveway to the south of the new Community Centre will continue to convey overland flows for major storm
events towards the Rufous Street network.
It is noted that post-development impervious areas (74.05%) have been slightly decreased compared to the
existing pre development impervious areas (74.74%).


The existing contours of the property and proposed drainage of the site are shown in plans 188-002-100, 188-
002-300, 188-002-SK01 and SK02 as part of Appendix A.




                                              Page 7 of 13
   2261 david low way, peregian beach, qld 4573      acn: 626 671 092              [email protected]
Log in to download the original file

8. Engineering Report and Plans.pdf · 11.3 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.