Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 22, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba Flood Study It should be noted that the water surface profile required to match the Council debris levels with the JFP debris levels would have been unrealistic. It was therefore considered that a calibration to the higher debris levels was the most reasonable approach. The resultant flood levels for the February 2012 event are shown in Figure 10. For the upstream areas of Eenie Creek, the resultant modelled water levels were between the 50 and 100 year ARI levels. Within Keyser Creek the resultant water levels were roughly equivalent to the 20 year ARI event. Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4 2.doc Commercial in Confidence Page 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.