Noosa on Weyba
Flood Study




7                      Proposed Development
7.1                    Proposed Development
The proposed development plan is shown in Figure 13. The roughness values were not altered in the
developed case, as proposed urban areas will be filled, where necessary, to above the 100 year ARI
developed case peak flood level (with climate change).
J&K Hofmann Site
The proposed development of the J&K Hofmann site is predominantly outside of the 100 year ARI inundation
extent. Minor sections of filling are required for three lots within Precinct 3 Area I. The 100 year ARI
developed case peak flood level (with climate change) is 3.45 mAHD in this area. Therefore the minimum
floor levels will be set above 3.95 mAHD to provide sufficient flood immunity in accordance with SCRC
requirements. Compensatory excavation in this area is not proposed. However, if required by Council, this
could be conducted in the asset protection zone adjacent to the filled lots.
To provide attenuation of peak flows, a culvert crossing of the Eenie Creek tributary will be located within the
easement at the northern end of the site. Detention basins will also be required for the northern section of
Precinct 3 as well as Precinct 4. Sizing of these detention basins will be conducted during detailed design.
An internal round will be provided along the southern boundary, adjacent to Hollett Road West. This will
provide access to the western side of the site. This road will have 10 year ARI flood immunity and be
trafficable during a PMF event to allow for emergency access to Precinct 4. Precinct 4 will therefore be able
to access the site from Walter Hay Drive.
Northbrook Site
It is proposed that a large area will be filled to levels above the 100 year ARI flood level (with climate
change). A waterway corridor of a minimum 100 metre width will be maintained in this area. At the southern
boundary of the site, the waterway corridor increases to around 150 metres so that existing overland flow
paths are maintained. No excavation within the waterway corridor is proposed so as to maintain existing
vegetation. The 100 year ARI developed case peak flood level (with climate change) is around 2.80 mAHD
in these areas. Therefore the minimum floor levels will be set above 3.30 mAHD to provide sufficient flood
immunity in accordance with SCRC requirements. The entire area will be filled to levels above the 100 year
ARI flood level (with climate change).
A road crossing of Keyser Creek and one of its tributaries is proposed. These crossings will have 100 year
ARI flood immunity and will also be trafficable during a PMF event.    The road crossings will also provide
attenuation of peak flows. A secondary access route along Tidswell Road is also proposed, and so this road
needed to be upgraded in the modelling to provide sufficient flood immunity.
Since the initial application was made, the main road crossing of Keyser Creek has been relocated to near
the southern boundary of the site. The actual road crossing has been set back from the boundary to ensure
that flood levels for the neighbouring property are not impacted upon. As the crossing is now upstream of
the proposed lots, in the unlikely event of complete culvert blockage the houses will still be provided with
sufficient flood immunity.

7.2                    Proposed Structures
The proposed culvert crossings are shown in Figure 13A. The minimum road heights are shown in Figure
13B. The details of the proposed structures are shown below. The evacuation routes are shown in Figure
14. To be considered trafficable, the roads were designed to have a maximum flow depth of 250mm and a
                                              2
depth-velocity (dV) product of less than 0.4 m /s.
Typical entry and exit losses of 0.5 and 1.0 were assumed unless specified otherwise.




Northbrook Corporation Pty Ltd                      Version 4                                  16 September 2013
Flood Study v4 2.doc                          Commercial in Confidence                                  Page 19

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.