Council archive · source document
Attachment 13- Amended Flood Study MCU12/0208
Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
Noosa on Weyba Flood Study 7.2.1 PMF Trafficability Requirements During PMF events, access for emergency vehicles would be required. These vehicles are typically larger than standard vehicles and so can handle greater flow depths across roads. Based on Project 10 of Australian Rainfall and Runoff (AR&R): Appropriate Safety Criteria for Vehicles (2011), large 4WDs can cross roads with maximum depths of 500mm, with a limiting dV product of 0.6 m 2/s. Large passenger cars can cross roads with maximum depths of 400mm, with a limiting dV product of 0.45 m 2/s. For PMF events trafficability was therefore conservatively assumed if the depth was less than 400mm with a dV product of 0.45 m2/s. The Queensland Department of Community Safety was contacted regarding the trafficability criteria used for emergency vehicles. They advised that scenarios were assessed on a case by case basis and that a specific guideline was not used. However, it should be noted that the AR&R project references the Emergency Management Australia (EMA) manual for emergency vehicle 4WD operation that states that “if water reaches to the bumper bar or higher, upon entering the water accelerate until a bow wave forms in front of the vehicle. Maintain this bow wave at all costs, to keep water out of the engine.” In water depths of greater than 750mm, it is suggested that either a snorkel extension to the engine air inlet and exhaust system is fitted or a canvas sheet or tarp is placed across the grille to prevent water entering the engine bay.” For similar developments in Brisbane a maximum depth of 500mm and dV product of 0.6 m 2/s has been utilised to determine PMF trafficability for emergency vehicles. This is based on the Brisbane City Council (BCC) Subdivision and Development Guidelines (2008), Chapter 1 Part A which states that with flood depths less than 500mm and a dV product less than 0.6 m2/s, that evacuation of persons and possessions via trucks is possible and that fit adults can wade through floodwaters. 7.2.2 Structure Details Hollett Road West Internal Road The minimum road level will need to be set at 7.35 mAHD. 10 year ARI flood immunity is proposed with PMF trafficability. The culverts will include 3/1200 by 450 RCBCs (upstream IL = 6.55 mAHD, downstream IL = 6.50 mAHD, length = 12m). Approximately 12 metres to the west 3/1200 by 450 RCBCs (upstream IL = 6.65 mAHD, downstream IL = 6.60 mAHD, length = 12m) should also be installed. Easement Crossing This crossing is not required for access purposes for the site. However, it could potentially be utilised by existing properties around Lake Entrance Boulevard and Aspera Place as an alternative flood access route, as 70 properties in this area are inaccessible during a 2 year ARI event and above. The minimum road level will be set at 4.30 mAHD. 10 year ARI flood immunity is proposed with 100 year ARI trafficability. The proposed culvert is a 1/1500 by 1500 RCBCs (upstream IL = 2.00 mAHD, downstream IL = 1.95 mAHD, length = 15m). Tidswell Road Crossing An upgrade of Tidswell Road is proposed as a secondary access route for the development. It is proposed that the existing track will be upgraded by Council, as a cost to the subject development, so that 5 year ARI flood immunity is provided, as required for rural roads. The minimum road level will be raised from around 3.40 mAHD to 4.15 mAHD. The proposed culverts include 3/1500 by 600 RCBCs (upstream IL = 3.30 mAHD, downstream IL = 3.15 mAHD, length = 15m) and 1/1500 by 600 RCBC (upstream IL = 3.35 mAHD, downstream IL = 3.10 mAHD, length = 15m). Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4.doc Commercial in Confidence Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.