Attachment 13- Amended Flood Study MCU12/0208

of 130

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (37.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

Original PDF page 25, section 1. The text section number identifies this passage in the reader.

Noosa on Weyba
Flood Study



7.2.1                PMF Trafficability Requirements
During PMF events, access for emergency vehicles would be required. These vehicles are typically larger
than standard vehicles and so can handle greater flow depths across roads. Based on Project 10 of
Australian Rainfall and Runoff (AR&R): Appropriate Safety Criteria for Vehicles (2011), large 4WDs can
cross roads with maximum depths of 500mm, with a limiting dV product of 0.6 m 2/s. Large passenger cars
can cross roads with maximum depths of 400mm, with a limiting dV product of 0.45 m 2/s. For PMF events
trafficability was therefore conservatively assumed if the depth was less than 400mm with a dV product of
0.45 m2/s.
The Queensland Department of Community Safety was contacted regarding the trafficability criteria used for
emergency vehicles. They advised that scenarios were assessed on a case by case basis and that a
specific guideline was not used. However, it should be noted that the AR&R project references the
Emergency Management Australia (EMA) manual for emergency vehicle 4WD operation that states that “if
water reaches to the bumper bar or higher, upon entering the water accelerate until a bow wave forms in
front of the vehicle. Maintain this bow wave at all costs, to keep water out of the engine.” In water depths of
greater than 750mm, it is suggested that either a snorkel extension to the engine air inlet and exhaust
system is fitted or a canvas sheet or tarp is placed across the grille to prevent water entering the engine
bay.”
For similar developments in Brisbane a maximum depth of 500mm and dV product of 0.6 m 2/s has been
utilised to determine PMF trafficability for emergency vehicles. This is based on the Brisbane City Council
(BCC) Subdivision and Development Guidelines (2008), Chapter 1 Part A which states that with flood depths
less than 500mm and a dV product less than 0.6 m2/s, that evacuation of persons and possessions via
trucks is possible and that fit adults can wade through floodwaters.

7.2.2                Structure Details
Hollett Road West Internal Road
The minimum road level will need to be set at 7.35 mAHD. 10 year ARI flood immunity is proposed with
PMF trafficability.
The culverts will include 3/1200 by 450 RCBCs (upstream IL = 6.55 mAHD, downstream IL = 6.50 mAHD,
length = 12m). Approximately 12 metres to the west 3/1200 by 450 RCBCs (upstream IL = 6.65 mAHD,
downstream IL = 6.60 mAHD, length = 12m) should also be installed.
Easement Crossing
This crossing is not required for access purposes for the site. However, it could potentially be utilised by
existing properties around Lake Entrance Boulevard and Aspera Place as an alternative flood access route,
as 70 properties in this area are inaccessible during a 2 year ARI event and above.
The minimum road level will be set at 4.30 mAHD. 10 year ARI flood immunity is proposed with 100 year
ARI trafficability.
The proposed culvert is a 1/1500 by 1500 RCBCs (upstream IL = 2.00 mAHD, downstream IL = 1.95 mAHD,
length = 15m).
Tidswell Road Crossing
An upgrade of Tidswell Road is proposed as a secondary access route for the development. It is proposed
that the existing track will be upgraded by Council, as a cost to the subject development, so that 5 year ARI
flood immunity is provided, as required for rural roads. The minimum road level will be raised from around
3.40 mAHD to 4.15 mAHD.
The proposed culverts include 3/1500 by 600 RCBCs (upstream IL = 3.30 mAHD, downstream IL = 3.15
mAHD, length = 15m) and 1/1500 by 600 RCBC (upstream IL = 3.35 mAHD, downstream IL = 3.10 mAHD,
length = 15m).




Northbrook Corporation Pty Ltd                        Version 4                               16 September 2013
Flood Study v4.doc                              Commercial in Confidence                               Page 20

Used in these records

About this file

File size
37.1 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment 13- Amended Flood Study MCU12_0208.pdf · 37.1 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.