Noosa on Weyba Flood Study Keyser Creek Crossing (Lot 11 Access Road) This crossing of the creek will provide the only access to Precinct 1 and 2. It is proposed that this crossing have 100 year ARI flood immunity (with climate change) and be trafficable during a PMF event. As the regional PMF level is 4.23 mAHD the minimum possible road level is 3.83 mAHD. The culverts will consist of 3/3000 by 1500 RCBCs (upstream IL = 1.00 mAHD, downstream IL = 0.90 mAHD, length = 15.5m), 3/3000 by 1500 RCBCs (upstream IL = 1.10 mAHD, downstream IL = 1.00 mAHD, length = 15.5m), 1/2100 by 1500 RCBCs (upstream IL = 1.15 mAHD, downstream IL = 1.05 mAHD, length = 15.5m) and 1/1500 by 1500 RCBCs (upstream IL = 1.30 mAHD, downstream IL = 1.20 mAHD, length = 15.5m). The entry and exit losses were assumed to be 0.4 and 0.7 as wingwalls between 30 and 70 degrees will be utilised, and scour resistant outlet pad will be installed (refer Section 7.16.2 of QUDM). Debris deflector walls will be installed on the inlets. Swales will be required on the southern side of the crossing to ensure flows freely drain to the culverts. Keyser Creek Pedestrian Crossing A pedestrian and fire track will be provided along the northern boundary of Lot 11. The existing track will be raised by around 400mm to a minimum level of 1.6 mAHD and 3/1500 by 600 RCBCs (upstream IL = 0.65 mAHD, downstream IL = 0.64 mAHD, length = 5m) will be provided underneath the road. The larger culvert crossing will improve the tidal flushing in this area and the raised track will provide some attenuation of peak flows. No flood immunity is required for this crossing. Keyser Creek Tributary Crossing (Hollett Road East) A crossing of this small tributary will be required to provide access to Precinct 1 and 2. The road level is quite variable. It is proposed that this road have 50 year ARI flood immunity and be trafficable during a PMF event. Several culvert crossings are required. They consist of 1/2700 by 1200 RCBC (upstream IL = 4.00 mAHD, downstream IL = 3.75 mAHD, length = 25m); 1/600 RCP (upstream IL = 4.00 mAHD, downstream IL = 3.60 mAHD, length = 25m); and 1/525 RCP (upstream IL = 4.70 mAHD, downstream IL = 4.50 mAHD, length = 25m). At other points along the road, underdrainage will be required for local overland flows. This crossing is located to the north of the Noosa Wildlife Refuge. To allow for the safe passage of koalas and other animals, between the Refuge and the environmental protection land on the subject site, the minimum culvert height has been set at 1200mm, with a width of 2700mm. The Department of Main Roads Fauna Sensitive Road Design (2000) indicates that culverts of this height have been known to allow for passage of small, medium and large mammals, semi-arboreal mammals (which includes koalas), micro chiropteran bats, reptiles, birds, amphibians and introduced predators. 7.3 Proposed Stormwater Treatment Numerous water sensitive urban design (WSUD) measures are proposed to treat stormwater. These include bio-retention gardens and tree-pits located within the road reserve, vegetated swales, bio-retention swales, bio-retention basins, litter baskets and rainwater tanks. For further details refer to the Stormwater Management Plan (Cardno, September 2013). The proposed treatment measures will be located outside of the 100 year ARI extent of inundation. The waterway corridor will not be utilised for stormwater treatment purposes; stormwater will be treated to a sufficient level before it is discharged to this area. Northbrook Corporation Pty Ltd Version 4 16 September 2013 Flood Study v4.doc Commercial in Confidence Page 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 13- Amended Flood Study MCU12/0208Related documentApplication case desk ↗
About this file
- File size
- 37.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.